Maharashtra Metro Rail Corporation Limited-agecode007 has published Tender For Design And Construction Of Elevated Metro Viaduct Of Length 17.624 Km Between Ch. 21256.814 To Ch. 38881.7 Including Railway Spans Of Length 79M & 100M And A 6-Lane Double Decker Portion With Vehicular Underpass (Vup) From Ch. 25755.211 To Ch. . Submission Date for this Tender is 06-06-2024. Bridge Work Tenders in nagpur Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-May-2024 | Prebid meeting Joining Link | Other | 06-06-2024 |
FileName | File Description | File Size |
0cdf4cf7-c807-4fe4-888d-b8a9bd222855.html | Tender Notice | 0 KB |
BOQ_1815696.xls | Tender Document | 0 KB |
Part1_BiddingDocuments.pdf | Tender Document | 0 KB |
Part2_WorkRequirementP1.pdf | Tender Document | 0 KB |
Part2_WorkRequirementP2.pdf | Tender Document | 0 KB |
Part2_WorkRequirementP3cG_1.pdf | Tender Document | 0 KB |
Part2_WorkRequirementP3dG_2.pdf | Tender Document | 0 KB |
Part2_WorkRequirement_P3a_3.pdf | Tender Document | 0 KB |
Part2_WorkRequirement_P3b_4.pdf | Tender Document | 0 KB |
Part3_ConditionsOfContract.pdf | Tender Document | 0 KB |
Part4_FinancialBid.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Design and Construction of Elevated Metro Viaduct of length 17.624 km between Ch. 21256.814 to Ch. 38881.7 including Railway spans of length 79m & 100m and a 6-lane Double decker portion with Vehicular Underpass (VUP) from Ch. 25755.211 to Ch. 26895.211 for a total length of 1.14km in Reach-1A of NMRP Phase-2. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail