Tender For Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity Dam And Appurtenant Works Across River Song Of Song Dam Drinking Water Project In District Dehradun, Uttarakhand, Dehradun-Uttarakhand

Uttarakhand Project Development And Construction Corporation limited has published Tender For Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity Dam And Appurtenant Works Across River Song Of Song Dam Drinking Water Project In District Dehradun, Uttarakhand. Submission Date for this Tender is 06-06-2024. Civil Work Tenders in Dehradun Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

42831593
Corrigendum : Tender For Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity Dam And Appurtenant Works Across River Song Of Song Dam Drinking Water Project In District Dehradun, Uttarakhand
Open Tender
Indian
Uttarakhand
Dehradun
06-06-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity Dam And Appurtenant Works Across River Song Of Song Dam Drinking Water Project In District Dehradun, Uttarakhand

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-Apr-2024 Annexures of Prebid Queries Other 06-05-2024
2 06-Apr-2024 BOQ Corrigendum Financial Bid 06-05-2024
3 06-Apr-2024 Extension of Key Dates Date 06-05-2024
4 08-Apr-2024 Amendment in Technical Bid Technical Bid 06-05-2024
5 26-Apr-2024 Corigendum 5 Financial Bid 06-05-2024
6 02-May-2024 Corigendum 6 Financial Bid 06-05-2024
7 04-May-2024 Corrigendum 7 Other 06-05-2024
8 06-May-2024 Corrigendum 8 Date 06-06-2024
9 08-May-2024 Corrigendum 9 Other 06-06-2024

Key Value

Document Fees
INR 118000 /-
EMD
INR 133200000.0 /-
Tender Value
INR 1306.40 Crore /-

Attachment

FileName File Description File Size
10d5ede4-aa4e-4a81-b2a5-8406644bb956.html Tender Notice 0 KB
BIDSONG.pdf Tender Document 0 KB
BOQ_85413.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

NAME OF WORK : CIVIL WORKS INCLUDING HYDRO-MECHANICAL WORKS FOR CONSTRUCTION OF 130.6 M HIGH CONCRETE GRAVITY DAM AND APPURTENANT WORKS ON SONG RIVER
Sl. No. Item Description
1For river diversion- river diversion pipe & cofferdam : Open Excavation inall kind of Soils and soft rock with or without blasting including boulder upto 1 cum in volume including placing neatly or disposing off the excavated stuff, dewatering, desilting, bailing out water etc. as per Technical Specification
2For river diversion- river diversion pipe & cofferdam :Back filling by the excavated material including compaction
3For river diversion- river diversion pipe & cofferdam : Providing and laying PCC (M15/ A40 Grade) Concrete as per drawing
4For river diversion- river diversion pipe & cofferdam : Providing and laying M25/ A20 Grade Concrete for Intake and River Diversion Pipe as per drawing
5For river diversion- river diversion pipe & cofferdam : Providing, fabricating and placing in position reinforced steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25 mm diameter annealed steel wire, welding whenever required, including cost of all matter
6For river diversion- river diversion pipe & cofferdam : Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2)for river diversion pipe
7For river diversion- river diversion pipe & cofferdam : Providing & placing of Colcrete (1:2:4) as shown in drawingin all respect
8For river diversion- river diversion pipe & cofferdam : Drilling for Cement grouting
9For river diversion- river diversion pipe & cofferdam : Consolidation grouting with cement slurry in the drilled holes
10For river diversion- river diversion pipe & cofferdam : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.
11For conventional concrete dam: Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(In area of thorny jungle)
12For conventional concrete dam: Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.
13For conventional concrete dam: Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.
14For conventional concrete dam: Underground Excavation of Galleries
15For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying PCC (M-15/ A40), for backfilling
16For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying RCC M-20/ A40 (Below Dam Foundation Level, where NSL is below foundation level)
17For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying RCC M25/A20 in Dam Body as per design
18For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying M15/A80 in the dam as per design
19For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying Cement Concrete Block (M25/ A20 Grade) for Protection Works
20For conventional concrete dam (concreting & reinforcement in structure) : Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes
21For conventional concrete dam (concreting & reinforcement in structure) : Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2)for Ecological Release
22For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.
23For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c
24For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)
25For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Welded Wiremesh 100x100x4 mm for shotcreting
26For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 2500 long 25 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered (In Gallery Portion)
27For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Shotcreting of excavated gallery (at crown and sides) with 50mm thick shotcrete (M-35 grade) in Gallery Portion
28For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.
29For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : 76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c
30For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)
31For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Welded Wiremesh 100x100x4 mm for shotcreting
32For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Drilling for consolidation grouting
33For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Consolidation grouting with cement slurry in the drilled holes (8 Bags / m length on Left bank and 5 bags / m length on right bank)
34For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.
35For conventional concrete dam (Reservoir Rim Slope Stabilization Work) :76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c
36For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)
37For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Welded Wiremesh 100x100x4 mm for shotcreting
38For conventional concrete dam (Left Bank Cable Anchor) : 35000 long Cable Anchors at 1500 c/c spacing both ways Staggered.
39For conventional concrete dam (Foundation Treatment) : 76 mm dia Hose Pipe for connecting the Gallery with Drainage Hole
40For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Drilling for curtain grouting
41For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Drilling for consolidation grouting
42For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Curtain grouting with cement slurry in the drilled holes (3 bags / m length of grout hole)
43For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Consolidation grouting with cement slurry in the drilled holes (8 Bags / m length of grout hole)
44For conventional concrete dam: Providing & placing of formed drains in dam as per drawing .
45For conventional concrete dam: Providing & placing of 300 dia ventilation pipe as per drawing
46For conventional concrete dam: 76 mm dia Hose Pipe for connecting the Gallery with Drainage Hole
47For conventional concrete dam: 300 mm wide PVC Water Stop
48For conventional concrete dam: 200 mm dia Trap Drain
49For conventional concrete dam: Copper Water Stop
50For conventional concrete dam: GEVR Concrete to be provided on Dam Body inM15 Grade ( flyash- cement Ratio = 50:50)
51For conventional concrete dam: Providing,fixing & installation ofLift in Dam (Capacity 340 kg/5 person)
52For conventional concrete dam (Control Room & Power Pack Room) : Providing and laying in position specified grade of reinforced cement concrete includingthe cost of centring. Shutterring, finishing and reinforcement-All workM25/ A20 GRADE CEMENT CONCRETE
53For conventional concrete dam (Control Room & Power Pack Room) : Providing, fabricating and placing in position reinforced steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25 mm diameter annealed steel wire, welding whenever required, including cost of all matter
54For conventional concrete dam (Control Room & Power Pack Room) : Brick work with F.P.S. bricks of class designation 7.5 in superstructurein Cement mortar 1:6 ( I cement :6 coarse sand)
55For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Steel Railing in all respect. (30 m length @ 12 kg/m length)
56For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Doors in all respect
57For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Windowsin all respect.
58For conventional concrete dam : Grounding System
59For conventional concrete dam : W- section/three beam section railing of corrugated sheet 3.0 mm thick at top of Dam ,parts of reservoir touching Dam& approches
60For conventional concrete dam : General Lighting for Dam and Galleries
61For conventional concrete dam : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.
62For Water Conveyance System : Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.
63For Water Conveyance System : Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.
64For Water Conveyance System :Sand Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
65For Water Conveyance System :Gravel Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.9
66For Water Conveyance System : Plum Concrete (M-15 Grade)
67For Water Conveyance System : Providing & placing of PCC (M-15/ A40 Grade) as shown in drawingincluding all.
68For Water Conveyance System : Providing & placing of RCC M-20/ A40 grade as shown in drawingincluding all.
69For Water Conveyance System : Providing & placing of RCC M-30/ A20 grade as shown in drawingincluding all.
70For Water Conveyance System : Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes
71For Water Conveyance System : Supply,fabrication & erection of steel truss bridge as per detailed drawing including supply of all structural steel E-250 confirming IS 226 -1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticorrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting,labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.
72For Water Conveyance System :Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2)of varying thickness 20 -30 mm for water conveyance system
73For Water Conveyance System : Manholes for pipe dia of 1.5 m to be provided on WCS
74For Water Conveyance System : Air Supply Valves for pipe dia of 1.5 m to be provided on WCS
75For Water Conveyance System : Expansion Joints (Low Head)for pipe dia of 1.5 m to be provided on WCS
76For Water Conveyance System : Expansion Joints (Medium Head)for pipe dia of 1.5 m to be provided on WCS
77For Water Conveyance System : Expansion Joints (High Head)for pipe dia of 1.5 m to be provided on WCS
78For Water Conveyance System : Rock Anchor
79For Water Conveyance System : Drainage Holes
80For Water Conveyance System : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)
81For Water Conveyance System : Welded Wiremesh 100x100x4 mm for shotcreting
82For Water Conveyance System : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.
83For valve house: Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.
84For valve house: Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.
85For valve house: Providing & placing of PCC M15/A40 as shown in drawingincluding all.
86For valve house: Providing & placing of RCC M20/ A40 as shown in drawingincluding all.
87For valve house: Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes
88For valve house: Supply,fabrication & erection of steel truss structure as per detailed drawing including supply of all structural steel E-250 confirming IS 226 -1969 required for proper completion of the structure including ground erectionand one coat of approved quality anticorrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting,labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.
89For HM Works (Trashrack, Gates, Hoist and Valves) : Main Orifice Spillway Service Gates (Radial Type) 2 nos size(7x8.5m)
90Embedded Parts for Main Orifice Spillway Service Gates (Radial Type) 2 nos size(7x8.5m)
91For HM Works (Trashrack, Gates, Hoist and Valves) : Main Orifice Spillway Stoplog Gate (Vertical Lift Slide Type)01 nos size(7x7.5m)
92Embedded Parts forMain Orifice Spillway Stoplog Gate (Vertical Lift Slide Type)01 nos size(7x7.5m)
93For HM Works (Trashrack, Gates, Hoist and Valves) : High Level Spillway Service Gate (Vertical Lift Fixed Wheel Type) 01 nos size(5x6.5m)
94Embedded Parts for High Level Spillway Service Gate (Vertical Lift Fixed Wheel Type) 01 nos size(5x6.562m)
95For HM Works (Trashrack, Gates, Hoist and Valves) : High Level Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(5x 6m)
96Embedded Parts for High Level Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(5x 6m)
97For HM Works (Trashrack, Gates, Hoist and Valves) : Intake Trash Rack (Inclined) @ 400 kg/m size(2.2x2.50m)
98Embedded Parts for Intake Trash Rack (Inclined) @ 400 kg/m size(2.2x2.50m)
99For HM Works (Trashrack, Gates, Hoist and Valves) : Intake Stoplog Gate (Vertical Lift Slide Type) 01 nos size(1.5x 1.5m)
100Embedded Parts for Intake Stoplog Gate (Vertical Lift Slide Type) 01 nos size(1.5x 1.5m)
101For HM Works (Trashrack, Gates, Hoist and Valves) : Environmental Release Valve (Butterfly Valve) 0.3 mtr Dia
102For HM Works (Trashrack, Gates, Hoist and Valves) : butterfly Valve at start of Water Conductor system (Butterfly Valve) 1.5 mtr Dia
103For HM Works (Trashrack, Gates, Hoist and Valves) : Stoplog Gate at Upstream of River Diversion Channel01 nos size(4x 4m)
104Embedded Parts for Stoplog Gate at Upstream of River Diversion Channel01 nos size(4x 4m)
105Contractor"s infrastructure: Dispensary/First Aid Centre single floor Temporary Type
106Contractor"s infrastructure: Temporary Fire Station (single floor)
107Contractor"s infrastructure: working Shed for storage of Special T&P and Equipment Temporary Buildingsingle floor 2Nos
108Construction of 2 lane haul road on right bank to dam top as per guidelines of MORTH inclusive of all cost of labor, machinery, excavation, filling, GSB, WBM-I,II,III,scupper, catch pit, culvert, retaining wall, breast wall, drains, edge stone, parapet, gabion walls, bituminous prime coat, tack coat, Bituminous concrete & semi dense bituminous concrete, road safety & road furnitures and maintenance during the project construction period.
109Construction of 2 lane haul road on left bank to dam top as per guidelines of MORTH inclusive of all cost of labor, machinery, excavation, filling, GSB, WBM-I,II,III,scupper, catch pit, culvert, retaining wall, breast wall, drains, edge stone, parapet, gabion walls, bituminous prime coat, tack coat, Bituminous concrete & semi dense bituminous concrete, road safety & road furnitures and maintenance during the project construction period.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail