49179566 t and c f.o.r description destination delivery period description delivery /completion rate of supply for all items completion : within 11 months supply, installation, commissioning and proving test shall be completed within 11 months.
49108709 Corrigendum : supply of icss (dcs/esd) avu and (esd) dcu refer technical requisition , supply of complete required dcs & esd package with associated systems and sub systems with all required hardware, software & licenses including design, engineering, procurement of
49363024 design engineering manufacturing supply installation testing and commissioning of 1 no spherical valve miv along with dismantlement for shanan power house , part i : supply , design, engineering, manufacture and supply of 1400 mm dia spherical valve (
49343419 initial and routine load test shall not be carried out by dynamic method of testing. note: 2. testing agency shall submit the design of loading platform for the pproval of engineer in charge.
49351103 Corrigendum : competitive e bidding for supply and installation of new continious centrifugal c.f.w.