51721205 work including rent of shuttering & all cost of labour and material t&p etc. required for porper completion of the work/m2.for bridge slab above 3.00m span.workdone as per as per drawing & direction of engineer in charge.up 3 m span vrb centring and
51261070 Corrigendum : gas up to the network) 90% exhauster & motor, burner of the clause kiln catalyst, tail gas analyzer, palletization unit. 7 sinter plant equipment (boundary limit – receiving bin for raw material to vibro feeder below product sinter bin) 75% high intensive
51677932 motors and placing in the plant for repair.
51567446 per item no 21 here in before but size of mahholes 1200x1200mm/1200x900mm/ 1500x900mm/1500x1200mm and depth upto 4.00 metre complete all as specified and directed. 24 surface preparation of walls/floor of sewage treatment plant (stp) including dewatering
51774941 payment will be made on the basis of actual measurement of spoils in dry condition. 14 dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per technical specification clause 202 for