|
Supply Of supply, installation and commissioning of cms equipment for crew lobby aii division as per attached cris specification. , supply, installation and commissioning of cms equipment for crew lobby aii division as per attached cris specification no. 2007/cris/ndls-hq/cms/project/rollout-ii/0030/pt-ii dated 26-07-2024. on e set consisting of following items: cms kiosk equipment: (1) metal kiosk surface mounted -01 nos., (2) to uch screen monitor-01 nos., (3) breath analyzer-01 nos., (4) thin client - 01 nos., (5) web camera-01 nos. , (6) ups-01 nos., (7) bio metric -01 nos., (8) key board and mouse: 01 nos., (9) laser printer - 01 nos., (10 ) 16 gb or higher pen drive loaded with cris provided self bootable client image. cms tss equipment: eq uipment set consists: 1) thin client (8gb ram/32 gb rom), 2) monitor (18.5 led), ups (1 kva with smf bat tery), key board & mouse (wired). supplier should supply, install, commission the kiosks at different locatio ns as per consignee requirement and should provide free maintenance up to warranty period 30 months, fr om the date of installation. [ warranty period: 30 months after the date of delivery ] ]
|