|
Tender for E/W In Excavation In Foundation In Ordinary Soil Including Lead Up To 30.00 M And Lift 1.50M And All Labour Material And T&P Etc. As Per Si. No. 251 , Earth Work In Embankment In Ordinary Soil Inclunding Lift 1.5M Lead , Providing And Laying Base Concrete 1:4:8 Cement F/Sand And 40Mm Gauge Stone Ballast Including Supply Of All Material Labour T&P Etc All Complete S.I. 281 , 1St Class Brick Work In Found 1:4 Cement And C/Sand Mortar Including Etc... , Plain Cement Concrete Work In 1:2:4 Ration Of Cement Coarse Sand & 20Mm. Gauge Stone Grit Over Walls & K.C. Drain Including All Complete , Mild Steel Or Iron In Plane Work In Reinforced Cement Concrete Etc. All Complete At Site Si No 504 , Construction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401. , Providing And Supplying Polytheenn Sheet 125 Microne Ch No 1 Si No-19 , Cement Concrete With 40 Mm Guage Brick Ballast, Fine Sand Of 1.25 F.M. And Cement In Proportion Of 8:4:1 In Foundation And Under cement concrete Including Supply Of All Material , Labour And T&P Etc Required For Proper Completion Of Word As Per Si. No. 273. , Making & Cutting Of construction Joint I/C Filling Of Nesseccery Material In Joint Incluling All Material Labour ,T&P Etc All Compleat Si No 6.4(Clause1500) , Supply And Fixing Of Infermatorysign Board I/C Painting Writing Compleat
|