|
Tender for E/W In Excavation In Foundation In Ordinary Soil Including Lead Up To 30.00 M And Lift 1.50M And All Labour Material And T&P Etc. As Per Si. No. 251 , Earth Work In Embenkment Mechaincally Compacted To 95% Proctor Decsity In Ordinary Soil Excavation To Be Done In Fork Fo Regular Pits Not Exceeding 1/2 M In Depth And Earth Work To Tbe Done In 20 Cm Layers Including Ramming And Dressing Pulvarization Rthe Surface To Required Leves And Slopes And Also Including 1.5M Lift And 30 M Lead The Earth Form Cutting To Be Used In Making Embankement Or To Be Deposited As Spol Baks With In 30 M Distance As Directed Aby The Engineer In Charge I/C All Complete Sor Ch- 4 Si No - 253 B , Providing Of Laying Cement Concrete With 4 Cm Gauge Approved Stone Balast Approved Coarse And Cement In The Proportion Of 8:4:1 Including Supply Of All Material T&P Etc. Si No. 281 , E/W In Excavation In Foundation In Ordinary Soil Including Lead Up To 30.00 M And Lift 1.50M And All Labour Material And T&P Etc. As Per Si. No. 251 , Reinforced Cement Concrete Work In 1:2:4 Ration Of Cement Coarse Sand & 20Mm. Gauge Stone Grit Over Walls & K.C. Drain Including All Complete , Mild Steel Or Iron In Plane Work In Reinforced Cement Concrete Etc. All Complete At Site Si No 504 , Construction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401. , Providing Of Laying Cement Concrete With 4 Cm Gauge Approved Stone Balast Approved Coarse And Cement In The Proportion Of 8:4:1 Including Supply Of All Material T&P Etc. Si No. 281 , Cement Concrete With 40 Mm Guage Brick Ballast, Fine Sand Of 1.25 F.M. And Cement In Proportion Of 8:4:1 In Foundation And Under cement concrete Including Supply Of All Material , Labour And T&P Etc Required For Proper Completion Of Word As Per Si. No. 273. , Making & Cutting Of construction Joint I/C Filling Of Nesseccery Material In Joint Incluling All Material Labour ,T&P Etc All Compleat Si No 6.4(Clause1500) , Supply And Fixing Of Infermatorysign Board I/C Painting Writing Compleat
|