| 1 | Materials |
| 2 | Supply of 100 mm D.I.K.-7 Pipe As per (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 3 | Supply of Sulce Valve 100 mm Size (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 4 | Supply of Pipe Line Special. 10% of Cost of Pipe. Item No. 1 |
| 5 | Labour Cost |
| 6 | Dismentling of Following type of road surfaces for sorting out of servicesble materials and disposal of unserviceable materials. (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 7 | C.C. ROAD 150×0.90 (If Required) |
| 8 | INTERLOCKING TILES 200×0.90 (If Required) |
| 9 | Re-instatement of following type of road surfaces after laying of pipe line and house connection work including supply of all materials, T&P etc. required for proper complation of the work as per direction of engineer-in-charge. (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 10 | C.C. ROAD 150×0.90 (If Required) |
| 11 | INTERLOCKING TILES 200×0.90 (If Required) |
| 12 | Excavation in trenches for pipe line work in soil mixed with morrum/shingle/ kanker including Lifttup up to 1.5 Mtr and lead up to 30 mtr and including filling, watering, and ramming of axcabated earth in to the trenches including supply of all labour T & P etc. for proper complition of the work. (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 13 | 100 mm dia K-7 |
| 14 | Lowering, Laying and jointing with SBR ruber gaskets D.I.K.-7 of various classes with DI/MS specials of following diameter in proper position grade and alignment including conveyance of material to site of work. It also including cost of jointing materials and rubber rings iabour, hydraulice testing etc. complete. (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 15 | 100 mm dia K-7 |
| 16 | Fitting of C.I.D/F Sluice Valve / Air Valve with pipe line including supply of rubber packing & nut bolts with erth work & trenches and fixing it properlly with all necessory jointing materials (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 17 | 100 mm dia K-7 |
| 18 | Construction of Sluic Valve Chamber size 1.00×1.00×1.50mtr with brick work 1:6 cement and sand morter with R.C.C. cover including supply of all materials, Labours and T&P etc. proper completion of work. (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 19 | Inter Connection with existing pipe line Including required all materials labour T&P (UP Jal Nigam Amrut 2.0 DPR Rate) |
| 20 | 100 mm dia K-7 |
| 21 | Dismentling and Re-instatement Water House Connections which is damaged during laying of pipe line including supply of all materials labour T&P. etc. required for proper Completion of the work . |
| 22 | Cleaning of site & cutting of buses for developed of site with all labours and T&P etc all complete (PWD SI No. 259 As per rate) |
| 23 | Un for Seen Item for Work ie. 10% of Labour cost (I.E. joints Tee, Band, Alvo, Pipe Cutting Reapring of Leakeges, Tesiting of Pipe Line |
| 24 | Super Vision Charge (10% of Estmate Cost) Please Enable Macros to View BoQ information |