Indian Tenders

Tender Notice

TDR 55919530
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7636031
Tender ID GEM/2026/B/7636031
Tender Brief Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Lakhanpur, Agra - (Part-A) Supply
City Agra
State Uttar Pradesh
Document Fees Refer document
EMD INR 46000.0 /-
Tender Value INR 45.76 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Lakhanpur, Agra - (Part-A) Supply & Erection Providing & Installation Of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V For 250 Kva Dt , Providing & Fixing Of Stone Pad , Providing & Fixing Of Suspension Cl , Providing & Fixing Of Cl For Distribution Box , Providing & Fixing Of Dead End Cl , Providing & Fixing Of I Hook , Providing & Fixing Of Dropper Channel , Providing & Fixing Of Ms Base Angle , Providing & Fixing Of Ms Top Channel , Providing & Fixing Of Ms T-Off Channel , Providing & Fixing Of Lt Smc Box , Providing & Fixing Of Cl With Nut & Bolt For Lt T-Off , Providing & Fixing Of Holding Cl For Top Channel & Tpmo , Providing & Fixing Of Lt Cl For Pcc Poles , Providing & Fixing Of Earthing Strip For La , Providing & Fixing Of Danger Board , Providing & Fixing Of Barbed Wire , Providing & Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Red Oxide Paint , Providing & Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint , Providing & Fixing Of Copper L-Piece 50X225x10 Mm , Providing & Fixing Of Alu. Lug Long Barrel Size , (Part-B) Carriage & Erection Carriage Of Pcc Pole 8.5 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of Pcc Pole 11 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 25 Kva T/F Fromelectricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 63 Kva T/F Fromelectricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 100 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 250 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Cartiage Of Lt Pvc Cable Al. 1X120 (788 Mtr), Lt Pvc Cable Al.1X240 Sqmm (150 Mtr), Lt Pvc Cable 3.5X70 Sqmm (24 Mtr) From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50 Kms.) J) Line Material Viz. Abc 3X95 Sqmm (6350 Mtr), Weasal Conductor (4530 Mtr), Distribution Box (287 Nos), Stay Set Complete (114), Ms Earthing Rod (245), 11 Kv Disc Insulator (231 Nos.), 11 Kv Disc Fitting (231 Nos.), 11 Kv Fuse Set (39 Nos), 11 Kv Pin Insulator Polymeric With Pin (264 Nos), 11 Kv Tpmo (20 Nos), Abc 3X50 Sqmm (3822 Mtr.), 11 Kv La (63), Earthing Rod For La (21) And Other Line Material, If Required. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Single Pole 11 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Mounting & Installation Of 25 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Mounting & Installation Of 63 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Mounting & Installation Of 100 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Installation For 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Laying Of Lt Pvc Cable Alu. 1X120 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Cable Alu. 1X240 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Cable 3.5X70 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X95/3X50 Sqmm In Lt/Ht Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Acsr Weasal Conductor In Ht/Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Providing & Fixing Waterlevel Earthing Set For 250 Kva Distribution Transformer Complete With Gi Pipe Electrode, Watering Pipe, Chamber, Salt & Charcoal Treatment And Gi Strip Connection As Required As Per Respo Norms. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation Of Stay Set Complete As Direction By Supervising Engineer. , Concreting Of Stay As Direction By Supervising Engineer. All Required Mateial Provide By The Contractor At His Own Cost. , Fixing Of Ms Earthing Rod As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Installation Of 11 Kv Tpmo As Direction By Supervising Engineer. , Installation Of 11 Kv Fuse Set As Direction By Supervising Engineer. , Fixing Of 11 Kv La As Direction By Supervising Engineer. , Fixing Of Earthing Rod For La As Direction By Supervising Engineer. , Dismentling & Removal Of 10/16 Kva T/F And Recived Back To Ele. Store Center Taj Agra , Dismentling & Removal Of 25/63/100 Kva T/F And Recived Back To Ele. Store Center Taj Agra

Key Dates

Publish Date 10-06-2026
Last Date of Bid Submission 25-06-2026
Tender Opening Date 25-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 282005,EDC-I , B-690 Kamla Nagar, Agra

BOQ Items

Sl. No. Item TitleItem Description
1(Part-A) Supply & Erection Providing & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V for 250 KVA DT(Part-A) Supply & Erection Providing & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V for 250 KVA DT
2Providing & Fixing of Stone padProviding & Fixing of Stone pad
3Providing & Fixing of Suspension ClampProviding & Fixing of Suspension Clamp
4Providing & Fixing of Clamp for Distribution BoxProviding & Fixing of Clamp for Distribution Box
5Providing & Fixing of Dead End ClampProviding & Fixing of Dead End Clamp
6Providing & Fixing of I HookProviding & Fixing of I Hook
7Providing & Fixing of Dropper ChannelProviding & Fixing of Dropper Channel
8Providing & Fixing of MS Base AngleProviding & Fixing of MS Base Angle
9Providing & Fixing of MS Top ChannelProviding & Fixing of MS Top Channel
10Providing & Fixing of MS T-off ChannelProviding & Fixing of MS T-off Channel
11Providing & Fixing of LT SMC BoxProviding & Fixing of LT SMC Box
12Providing & Fixing of Clamp with Nut & Bolt for LT T-offProviding & Fixing of Clamp with Nut & Bolt for LT T-off
13Providing & Fixing of Holding Clamp for Top Channel & TPMOProviding & Fixing of Holding Clamp for Top Channel & TPMO
14Providing & Fixing of LT Clamp for PCC PolesProviding & Fixing of LT Clamp for PCC Poles
15Providing & Fixing of Earthing Strip for LAProviding & Fixing of Earthing Strip for LA
16Providing & Fixing of Danger BoardProviding & Fixing of Danger Board
17Providing & Fixing of Barbed wireProviding & Fixing of Barbed wire
18Providing & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Red Oxide PaintProviding & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Red Oxide Paint
19Providing & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. PaintProviding & Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint
20Providing & Fixing of Copper L-Piece 50x225x10 MMProviding & Fixing of Copper L-Piece 50x225x10 MM
21Providing & Fixing of Alu. Lug long barrel sizeProviding & Fixing of Alu. Lug long barrel size
22(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
23Carriage of PCC Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of PCC Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
24Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
25Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
26Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
27Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
28Cartiage of LT PVC CABLE Al. 1x120 (788 mtr), LT PVC Cable Al.1x240 SQMM (150 mtr), LT PVC CABLE 3.5x70 sqmm (24 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT PVC CABLE Al. 1x120 (788 mtr), LT PVC Cable Al.1x240 SQMM (150 mtr), LT PVC CABLE 3.5x70 sqmm (24 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
29Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. ABC 3X95 SQMM (6350 mtr), Weasal conductor (4530 mtr), Distribution Box (287 nos), Stay Set Complete (114), MS Earthing Rod (245), 11 kv Disc Insulator (231 nos.), 11 KV Disc Fitting (231 nos.), 11 kv Fuse Set (39 nos), 11 kv Pin insulator polymeric with pin (264 nos), 11 KV TPMO (20 nos), ABC 3x50 sqmm (3822 Mtr.), 11 kv LA (63), Earthing Rod for LA (21) and other line material, if required.Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. ABC 3X95 SQMM (6350 mtr), Weasal conductor (4530 mtr), Distribution Box (287 nos), Stay Set Complete (114), MS Earthing Rod (245), 11 kv Disc Insulator (231 nos.), 11 KV Disc Fitting (231 nos.), 11 kv Fuse Set (39 nos), 11 kv Pin insulator polymeric with pin (264 nos), 11 KV TPMO (20 nos), ABC 3x50 sqmm (3822 Mtr.), 11 kv LA (63), Earthing Rod for LA (21) and other line material, if required.
30Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
31Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
32Erection and grouting of Single Pole 11 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 11 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
33Mounting & Installation of 25 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 25 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
34Mounting & Installation of 63 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 63 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
35Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
36Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
37Laying of LT PVC Cable Alu. 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT PVC Cable Alu. 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.
38Laying of LT PVC Cable Alu. 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT PVC Cable Alu. 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.
39Laying of LT PVC Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT PVC Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer.
40Laying sagging stringing and binding and jumpering of LT ABC 3x95/3x50 SQMM in LT/HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x95/3x50 SQMM in LT/HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
41Laying sagging stringing and binding and jumpering of ACSR Weasal conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Laying sagging stringing and binding and jumpering of ACSR Weasal conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
42Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
43Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
44Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
45Providing & Fixing Waterlevel Earthing Set for 250 KVA Distribution Transformer complete with GI Pipe electrode, watering pipe, chamber, salt & charcoal treatment and GI strip connection as required as per RESPO norms.Providing & Fixing Waterlevel Earthing Set for 250 KVA Distribution Transformer complete with GI Pipe electrode, watering pipe, chamber, salt & charcoal treatment and GI strip connection as required as per RESPO norms.
46Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.
47Installation of Stay Set Complete as direction by supervising Engineer.Installation of Stay Set Complete as direction by supervising Engineer.
48Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost.Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost.
49Fixing of MS Earthing Rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of MS Earthing Rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
50Installation of 11 kv TPMO as direction by supervising Engineer.Installation of 11 kv TPMO as direction by supervising Engineer.
51Installation of 11 kv Fuse Set as direction by supervising Engineer.Installation of 11 kv Fuse Set as direction by supervising Engineer.
52Fixing of 11 kv LA as direction by supervising Engineer.Fixing of 11 kv LA as direction by supervising Engineer.
53Fixing of Earthing Rod for LA as direction by supervising Engineer.Fixing of Earthing Rod for LA as direction by supervising Engineer.
54Dismentling & Removal of 10/16 KVA T/F and Recived back to Ele. Store Center Taj AgraDismentling & Removal of 10/16 KVA T/F and Recived back to Ele. Store Center Taj Agra
55Dismentling & Removal of 25/63/100 KVA T/F and Recived back to Ele. Store Center Taj AgraDismentling & Removal of 25/63/100 KVA T/F and Recived back to Ele. Store Center Taj Agra

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download be3421fd-f561-4baa-80b5-df4e3d63812d.pdf Tender Documents 0 KB
Download 1780907170.xlsx Tender Documents 0 KB
Download 1780907182.pdf Tender Documents 0 KB
Download 1780907185.pdf Tender Documents 0 KB
Download 1780907190.pdf Tender Documents 0 KB
Download 1780907193.pdf Tender Documents 0 KB
Download 1780907198.pdf Tender Documents 0 KB
Download 1780907202.pdf Tender Documents 0 KB
Download 1780907218.pdf Tender Documents 0 KB
Download 1780907223.pdf Tender Documents 0 KB
Download 1780907231.pdf Tender Documents 0 KB
Download 1780907253.pdf Tender Documents 0 KB
Download 1780907259.pdf Tender Documents 0 KB
Download 1780907262.pdf Tender Documents 0 KB
Download ATC_4f9a8caf-6291-47e3-9e8c1780907423534_EDC1AGRABUYER.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.