| 1 | Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed upto the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc. complete as directed by the Engineer-in-charge. |
| 2 | Earthwork in stoney earth and gravel mixed with stone boulders not exceeding .014cum in volume with initial lead and lift including rough dressing and breaking clods upto 5cm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. com |
| 3 | Excavation of foundation in laterite rock or any hard rock ( other than granite or distinguished rock ) removed by chiesselling including dressing and levelling the bed not exceeding 1.50 mtr in depth and depositing the soil within initial lift 50 mtr. as |
| 4 | Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished section only etc.complete as directed by the Engineer-in-charge. |
| 5 | Cement concrete (1:3:6 ) in foundation and plinth below the base course of terrazzo flooring using 4cm (1 1/2\\") size black hard hand broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc. complete to required levels laid in layers not exceeding 0'-6\\" thick inlcuding cost, conveyance, royalties and all taxes of all materials and cost of all labour with T & P required for the work complete. |
| 6 | Brick masonary in cement mortar (1:6) using K.B.Bricks / Cement flyash of size 10\\" x 5\\" x 3\\" having crushing strength not lessthan 75 Kg/Cm2 after immersing the bricks for six hours in water before use in Foundation and plinth in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. Ground Floor |
| 7 | R.C.C.work of M-25 having a minimum comprresive strength (in work test) 250 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Column Base |
| 8 | Plinth Bend/Grade Beam Ground Floor |
| 9 | Bed Block Ground Floor |
| 10 | Lintel Band Ground Floor |
| 11 | Column in Super structure Ground Floor |
| 12 | Wall Beam & T-Beams Ground Floor |
| 13 | Chajja & Fins Ground Floor |
| 14 | Roof Slab Ground Floor |
| 15 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & Bridge and direction of Eng - in Charge. Ground Floor |
| 16 | Brick masonary in cement mortar (1:6) using K.B.Bricks/Cement flyash of size 10\\" x 5\\" x 3\\" having crushing strength not lessthan 75 Kg/Cm2 after immersing the bricks for six hours in water before use in superstructure in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. Ground Floor |
| 17 | 12mm(1/2\\")thick cement plaster (1:4) in all floors over brick work finished smooth including cement punning and Bitumen painting including watering, curing, cost conveyhanace, royalty and all taxes of all materials and labour with T&P required for the work etc.complete as per direction of Engineer-in-charge. Ground Floor |
| 18 | 12mm(1/2\\") thick cement plaster (1:6) in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing etc.complete with cost,conveyance royalties,all taxes and cost of all materials and cost of all labour with T&P requred for the work complete. as per the direction of Engineer in Charge. Ground Floor |
| 19 | 16mm(5/8\\") thick cement plaster (1:6)in finished smooth to inside smooth surface of brick walls afrer racking out joints including watering and curing etc.complete with cost,conveyance royalties,all taxes and cost of all materials and cost of all labour with T&P requred for the work complete. as per the direction of Engineer in Charge. Ground Floor |
| 20 | Supplying,fitting and fixing of M.S. doors, windows and iron grill gate made out of (45x45x60)mm size angular frame with square bar M.S. flat for grills of approved design icluding all cost conveyance taxes etc. complete. ( Prevaling lowest local market rate and excluding labour for fixing ) Ground Floor |
| 21 | Fixing of vetrified tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.Ground Floor |
| 22 | Fixing ceramices tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. Ground Floor |
| 23 | Fixing chequred tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. Ground Floor |
| 24 | Finishing wall surface with two coats of approved quality of weather seal coat of approved shade over a coat of primer including cost of all materials etc. complete. as per direction of Engineer In Charge. Ground Floor |
| 25 | Cement washing one coat including watering ,curing with cost,conveyance, royalities of cement etc.Complete as per direction of Engineer-in-Charge. Ground Floor |
| 26 | Distempering two coat over the including cost of distemper cost conveyance and all taxes of all materials and labor with T&P required for the work etc.complete in all respect etc. complete as per direction of Engineer in charge. Ground Floor |
| 27 | Painting two coats with approved paint over a coat of primer Including cost of all materials etc. complete. Ground Floor Please Enable Macros to View BoQ information |