| 1 | Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil forfoundation etc. complete. |
| 2 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of allmaterials to site and all labour charges etc complete. |
| 3 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and alllabour charges etc complete. Plinth Beam |
| 4 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and alllabour charges etc complete. Horizontal WallVertical Wall PC toiletVertical Wall PC toilet Indian toilet |
| 5 | Supplying and errecting centering are strutting including necessary supports for place surface for RCCcolumns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cmgauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists ofsingle 10cm - 6.5cm space of 75cm ceter to center. |
| 6 | Supplying and errecting centering are strutting including necessary supports for place surface for RCCcolumns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cmgauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists ofsingle 10cm - 6.5cm space of 75cm ceter to center Slab Physically challenged IWC Front Projection in Front Projection in IWC Back Side Projection Sides |
| 7 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using20mm and down graded hard broken granite stone jelly for all RCC items of works with minimumcement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard settingof concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg.of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machinecrushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost ofreinforcement grill and fabricating charges, centering and shuttering and also including laying, vibratingwith mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc., complete complying with standardspecification and asdirected by the departmental officers. The coarse and fine aggregates to be used should comply withthe requirements of IS standards. (No separate payment will be made by the Department for the excessusage of materials) Plinth Beam . |
| 8 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steelsand kept ready for concrete in position etc., |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceilingincluding finishing the joints smoothy with grinding machine and the surface shall be thoroughlycleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shallthen be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevennessshall be made good by applying 1st coat of putty mixed with water on the entire surface including fillingup the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sandpapering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.,complete complying with standard specifications and as directed by the Departmental Officers. [Therates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproofabrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coatof putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be gotapproved by the Executive Engineer before use on work |
| 10 | Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site andall labour charges etc complete. |
| 11 | Finishing the top of roof with Best quality vitrified tiles of size 600mm x 600mm x 8mm ofapproved colour, shade & quality laid in CM 1:3 20mm thick and pointed with white cementmixed same colour pigments etc., and 2% of water proffing compound by weight of cementcomplying with standard specification. |
| 12 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressedAnti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 13 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 14 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water basedcement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering thewalls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as perstandard specification. |
| 15 | Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colourover a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standardspecification. out area |
| 16 | Cost and supply of IWC |
| 17 | Cost and supply of EWC |
| 18 | Cost and supply of Wood plastic Composit door Door D1 0.75 m x 1.80m |
| 19 | Door SD 1.20 m x 1.80 m |
| 20 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour charges etc |
| 21 | Round Slab |
| 22 | Sanitary arrangements 110 mm dia pvc pipe |
| 23 | 110mm PVC Door Bend |
| 24 | 110mm PVC TEE |
| 25 | 2000 lit HDPE tank |
| 26 | Towards internal water supply arrangements (taps for toilet unit) and Electrification |
| 27 | Cost and supply of RCC jolly |
| 28 | Towards Name board charges |
| 29 | Towards Photographic charges Please Enable Macros to View BoQ information |