| 1 | Providing & Fixing straight through joint of 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Providing & Fixing straight through joint of 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 2 | Fixing straight through joint of 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency Straight through will be provide by department | Fixing straight through joint of 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency Straight through will be provide by department |
| 3 | Providing & Fixing of indoor/outdoor cable box and 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Providing & Fixing of indoor/outdoor cable box and 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 4 | Fixing of indoor/outdoor cable box and 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. Indoor/Outdoor Cable Box Provide by Department. | Fixing of indoor/outdoor cable box and 33 KV cable of verious size. Safe isolation of 33 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. Indoor/Outdoor Cable Box Provide by Department. |
| 5 | Providing & Fixing straight through joint of 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Providing & Fixing straight through joint of 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 6 | Fixing straight through joint of 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Fixing straight through joint of 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required the work also included Digging of earth pit of sufficent size and depth to accommodate preparation of stragiht through joint and filling earth pit. Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint and reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 7 | Providing & Fixing of indoor/outdoor cable box and 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Providing & Fixing of indoor/outdoor cable box and 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 8 | Fixing of indoor/outdoor cable box and 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. | Fixing of indoor/outdoor cable box and 11 KV cable of verious size. Safe isolation of 11 KV cable, Unfastening of cable joints as required, testing of cable section wise to detect fault, pin pointing of fault, lowering of cable as required Preparation of joint by cutting of cable, heat shrinking of sleeves & resistance testing of prepared joint of work also included reconnection of repaired cable as required. All necessary work for proper completion of work has to carried out by the agency. |
| 9 | A fault locator machine will be available for (24x7) period in B-2 Tronica city substation in front of UPSIDA office for Quick fault detection and quickly resolution in industrial area Tronica city. | A fault locator machine will be available for (24x7) period in B-2 Tronica city substation in front of UPSIDA office for Quick fault detection and quickly resolution in industrial area Tronica city. |