Tender Brief Bids Are invited for Custom Bid For Services - 33 Kv Line Strengthening Work, 11 Kv Line Strengthening Work, 11 Kv New Line Strengthening Work Lt Line Strengthening On Semi-Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd, Sikandra, Agra
City Agra
State Uttar Pradesh
Document Fees Refer document
EMD INR 40000.0 /-
Tender Value INR 39.18 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Custom Bid For Services - 33 Kv Line Strengthening Work, 11 Kv Line Strengthening Work, 11 Kv New Line Strengthening Work Lt Line Strengthening On Semi-Turnkey Basis In Business Plan 2026-27 Under The Area Of Edd, Sikandra, Agra - Part-A (Supply Of Material)Barbed Wire Gi , Alu. Winding Wire , 33 Kv V Type Cross Arm Cl , 11 Kv V Type Cross Arm Cl , Stone Pad , Top Channel , T-Off Channel , Dropper Channel , Holding Cl , Pg Cl Dog To Dog , Nut & Bolt Warshal All Sizes , Number Plate , Danger Plate , Brassing Set , 11 Kv E-Bracket , 11 Kv F-Bracket , 33 Kv F-Bracket , Neutral Cum Earth Wire , Suspension Cl , Distribution Box Cl , Pg Cl , Dead End Cl , I Hook , J Hook , Alu. Paint , Red Oxide Paint , Hdpe Pipe , Part-B (Erection Work)Carriage Of Pcc Pole 8.5 Mtr. Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of Pcc Pole 9 Mtr Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Carriage Of St Pole 13 Mtr Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Line Material From Store Center Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Distribution Box (18), 33 Kv Stay Set Complete (04), 11 Kv Stay Set Complete (110), Earthing Complete (181), V Type Cross Arm For 33 Kv (08), V Type Cross Arm For 11 Kv (1014), Polymer Pin Insulator For 11 Kv (2342), 11 Kv Pin With Nut (2270), Polymer Pin Insulator For 33 Kv (24), Disc Fitting For 11 Kv (435), Disc Insulator For 11 Kv (435), 33 Kv Jointing Kit O/D 3X300 Sqmm (8), 11 Kv Cable Jointing Kit O/D 3X185 Sqmm (36), 11 Kv Vcb O/D 200/100/5A (02), Dog Conductor (6000 Mtr.), Recoon Conductor (24000 Mtr.), Weasel Conductor (66000 Mtr.), Etc And Other Line Material As Required In Estimate/Package) , Cartiage Of Lt Abc Cable 3X95 Sqmm (500 Mtr.), 33 Kv Xlpe Cable 3X300 Sqmm (520 Mtr.), 11 Kv Xlpe Cable 3X185 Sqmm (2640 Mtr.) From Store Center Agra To Work Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Erection And Grouting Of Pcc 8.5 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Pcc 8.5 Mtr. Long Double Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Pcc Pole 9 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 13 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories As Required Cl S, Cross Arm, Insulator Etc. Including Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Laying Sagging Stringing And Binding And Jumpering Of Acsr Dog Conductor At 33/11 Kv Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Acsr Recoon Conductor At 33/11 Kv Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Acsr Weasel Conductor At 33/11 Kv Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Of 33 Kv Xlpe Cable 3X300 Sqmm In Trench With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Abc Cable 3X95 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of 11 Kv Xlpe Cable 3X185 Sqmm Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Of 11 Kv Xlpe Cable 3X185 Sqmm (Single Circuit) Through H.D.P.E.Pipe By Drill Machine/H.D.D. Machine Including The Cost Of Arrangment Of Labour, T&P & Drill Machine/H.D.D. Machine At A Depth Of 1.0 Mtr. Below The Ground Level. , Filling Of 33 Kv Cable Jointing Kit 3X300 Sqmm O/D And Making Connection As Per Respo Norms & Direction By Supervising Engineer. , Filling Of 11 Kv Cable Jointing Kit 3X185 Sqmm O/D And Making Connection As Per Respo Norms & Direction By Supervising Engineer. , Erection And Grouting Of 33 Kv Stay Set As Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Erection And Grouting Of 11 Kv Stay Set As Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Erection Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Concreting Of Support Pcc/St Pole. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Support Of Stay Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Fixing Of Dropper Channel With Cl As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of Top Channel For 11 Kv As Per Resop Norms And Direction By Supervising Engineer. , Fixing Of E-Bracket For 11 Kv As Required On Poles As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of F-Bracket For 11 Kv As Required On Poles As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of F-Bracket For 33 Kv As Required On Poles As Per Respo Norms And Direction By Supervising Engineer. , Installation Of Distribution Box With Cl S As Per Respo Norms And Direction By Supervising Engineer. , Fixing Of P.G. Cl S As Per Respo Norms , Fixing Of V Type Cross Arm Cl For 11 Kv As Per Respo Norms , Fixing Of V Type Cross Arm Cl For 33 Kv As Per Respo Norms , Fixing Of Suspension Cl As Per Respo Norms , Fixing Of I Hook As Per Respo Norms , Fixing Of J Hook As Per Respo Norms , Fixing Of Barbed Wire In Direction By Supervising Engineer. , Fixing Of Brassing Set As Per Respo Norms , Fixing Of T-Off Channel As Per Respo Norms , Fixing Of Holding Cl As Per Respo Norms , Fixing Of Pg Cl Dog To Dog As Per Respo Norms , Fixing Of Nut & Bolt Washer All Sizes As Per Respo Norms , Fixing Of Number Plate As Per Respo Norms , Fixing Of Danger Plate As Per Respo Norms , Earthing Of Vcb As Per Respo Norms , Installation Of 11 Kv O/D Vcb 200/100/5 In Proper Alignment And Direction And Jointing Of Earthing Strips With Help Of Gas Welding And Making Cable Connection Including Shifting Dragging With All Other Associated Works. , Fixing Of Neutral Cum Earth Wire As Per Respo Norms , Fixing Of Dead End Cl As Per Respo Norms , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Removal Of Old & Used Weasel Conductor And Receive Back To Store Center Agra From Work Site Along With Loading Unloading Both Ends (Approx 50 To 70 Km.).

Key Dates

Publish Date 09-06-2026
Last Date of Bid Submission 24-06-2026
Tender Opening Date 24-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 282005,EDC-I , B-690 Kamla Nagar, Agra

BOQ Items

Sl. No. Item TitleItem Description
1Part-A (Supply of Material)Barbed wire GIPart-A (Supply of Material)Barbed wire GI
2Alu. Winding wireAlu. Winding wire
333 KV V Type Cross arm clamp33 KV V Type Cross arm clamp
411 KV V Type Cross arm clamp11 KV V Type Cross arm clamp
5Stone PadStone Pad
6Top ChannelTop Channel
7T-off ChannelT-off Channel
8Dropper ChannelDropper Channel
9Holding ClampHolding Clamp
10PG Clamp dog to dogPG Clamp dog to dog
11Nut & Bolt warshal all sizesNut & Bolt warshal all sizes
12Number PlateNumber Plate
13Danger PlateDanger Plate
14Brassing SetBrassing Set
1511 KV E-Bracket11 KV E-Bracket
1611 KV F-Bracket11 KV F-Bracket
1733 KV F-Bracket33 KV F-Bracket
18Neutral cum earth wireNeutral cum earth wire
19Suspension ClampSuspension Clamp
20Distribution Box clampDistribution Box clamp
21PG ClampPG Clamp
22Dead End ClampDead End Clamp
23I HookI Hook
24J HookJ Hook
25Alu. PaintAlu. Paint
26Red Oxide PaintRed Oxide Paint
27HDPE PipeHDPE Pipe
28Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
29Carriage of PCC Pole 9 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of PCC Pole 9 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
30Carriage of ST Pole 13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of ST Pole 13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
31Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
32Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Distribution Box (18), 33 KV Stay Set Complete (04), 11 KV Stay Set Complete (110), Earthing Complete (181), V Type Cross Arm for 33 KV (08), V Type Cross Arm for 11 KV (1014), Polymer Pin Insulator for 11 KV (2342), 11 KV Pin with Nut (2270), Polymer Pin Insulator for 33 KV (24), Disc fitting for 11 KV (435), Disc Insulator for 11 KV (435), 33 KV Jointing Kit O/D 3x300 sqmm (8), 11 KV Cable Jointing Kit O/D 3x185 sqmm (36), 11 KV VCB O/D 200/100/5A (02), Dog Conductor (6000 Mtr.), Recoon Conductor (24000 Mtr.), Weasel Conductor (66000 Mtr.), etc and other line Material as required in Estimate/Package)Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Distribution Box (18), 33 KV Stay Set Complete (04), 11 KV Stay Set Complete (110), Earthing Complete (181), V Type Cross Arm for 33 KV (08), V Type Cross Arm for 11 KV (1014), Polymer Pin Insulator for 11 KV (2342), 11 KV Pin with Nut (2270), Polymer Pin Insulator for 33 KV (24), Disc fitting for 11 KV (435), Disc Insulator for 11 KV (435), 33 KV Jointing Kit O/D 3x300 sqmm (8), 11 KV Cable Jointing Kit O/D 3x185 sqmm (36), 11 KV VCB O/D 200/100/5A (02), Dog Conductor (6000 Mtr.), Recoon Conductor (24000 Mtr.), Weasel Conductor (66000 Mtr.), etc and other line Material as required in Estimate/Package)
33Cartiage of LT ABC Cable 3x95 sqmm (500 Mtr.), 33 KV XLPE Cable 3x300 sqmm (520 Mtr.), 11 KV XLPE Cable 3x185 sqmm (2640 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT ABC Cable 3x95 sqmm (500 Mtr.), 33 KV XLPE Cable 3x300 sqmm (520 Mtr.), 11 KV XLPE Cable 3x185 sqmm (2640 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
34Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
35Erection and grouting of PCC 8.5 Mtr. long Double Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of PCC 8.5 Mtr. long Double Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
36Erection and grouting of PCC Pole 9 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of PCC Pole 9 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
37Erection and grouting of ST Pole 13 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of ST Pole 13 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
38Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
39Laying sagging stringing and binding and jumpering of ACSR DOG Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of ACSR DOG Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
40Laying sagging stringing and binding and jumpering of ACSR Recoon Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of ACSR Recoon Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
41Laying sagging stringing and binding and jumpering of ACSR weasel Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of ACSR weasel Conductor at 33/11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
42Laying of 33 KV XLPE cable 3x300 sqmm in trench with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of 33 KV XLPE cable 3x300 sqmm in trench with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
43Laying of LT ABC cable 3x95 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of LT ABC cable 3x95 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
44Laying of 11 KV XLPE cable 3x185 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of 11 KV XLPE cable 3x185 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
45Laying of 11 KV XLPE cable 3x185 sqmm (single Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level.Laying of 11 KV XLPE cable 3x185 sqmm (single Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level.
46Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer.Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer.
47Filling of 11 KV Cable Jointing Kit 3x185 sqmm O/D and making connection as per respo norms & direction by supervising engineer.Filling of 11 KV Cable Jointing Kit 3x185 sqmm O/D and making connection as per respo norms & direction by supervising engineer.
48Erection and grouting of 33 KV stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting of 33 KV stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
49Erection and grouting of 11 KV stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting of 11 KV stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
50Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
51Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work.Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work.
52Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work.Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work.
53Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer.Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer.
54Fixing of Top channel for 11 KV as per resop norms and direction by supervising engineer.Fixing of Top channel for 11 KV as per resop norms and direction by supervising engineer.
55Fixing of E-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.Fixing of E-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
56Fixing of F-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.Fixing of F-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
57Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer.Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
58Installation of Distribution Box with clamps as per RESPO norms and direction by supervising Engineer.Installation of Distribution Box with clamps as per RESPO norms and direction by supervising Engineer.
59Fixing of P.G. Clamps as per RESPO normsFixing of P.G. Clamps as per RESPO norms
60Fixing of V Type Cross Arm Clamp for 11 KV as per RESPO normsFixing of V Type Cross Arm Clamp for 11 KV as per RESPO norms
61Fixing of V Type Cross Arm Clamp for 33 KV as per RESPO normsFixing of V Type Cross Arm Clamp for 33 KV as per RESPO norms
62Fixing of Suspension clamp as per RESPO normsFixing of Suspension clamp as per RESPO norms
63Fixing of I hook as per RESPO normsFixing of I hook as per RESPO norms
64Fixing of J hook as per RESPO normsFixing of J hook as per RESPO norms
65Fixing of Barbed wire in direction by supervising Engineer.Fixing of Barbed wire in direction by supervising Engineer.
66Fixing of Brassing Set as per RESPO normsFixing of Brassing Set as per RESPO norms
67Fixing of T-off Channel as per RESPO normsFixing of T-off Channel as per RESPO norms
68Fixing of Holding Clamp as per RESPO normsFixing of Holding Clamp as per RESPO norms
69Fixing of PG Clamp dog to dog as per RESPO normsFixing of PG Clamp dog to dog as per RESPO norms
70Fixing of Nut & Bolt washer all sizes as per RESPO normsFixing of Nut & Bolt washer all sizes as per RESPO norms
71Fixing of Number Plate as per RESPO normsFixing of Number Plate as per RESPO norms
72Fixing of Danger Plate as per RESPO normsFixing of Danger Plate as per RESPO norms
73Earthing of VCB as per RESPO normsEarthing of VCB as per RESPO norms
74Installation of 11 KV O/D VCB 200/100/5 Amp in proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works.Installation of 11 KV O/D VCB 200/100/5 Amp in proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works.
75Fixing of Neutral cum earth wire as per RESPO normsFixing of Neutral cum earth wire as per RESPO norms
76Fixing of Dead end Clamp as per RESPO normsFixing of Dead end Clamp as per RESPO norms
77Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.
78Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.
79Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download 8a3cdd2c-de8c-44c5-b87f-88ebaf7a4962.pdf Tender Documents 0 KB
Download 1780758402.xlsx Tender Documents 0 KB
Download 1780758411.pdf Tender Documents 0 KB
Download 1780758414.pdf Tender Documents 0 KB
Download 1780758417.pdf Tender Documents 0 KB
Download 1780758419.pdf Tender Documents 0 KB
Download 1780758423.pdf Tender Documents 0 KB
Download 1780758427.pdf Tender Documents 0 KB
Download 1780758441.pdf Tender Documents 0 KB
Download 1780758450.pdf Tender Documents 0 KB
Download 1780758454.pdf Tender Documents 0 KB
Download 1780758457.pdf Tender Documents 0 KB
Download ATC_d5597049-565a-435d-82d91780758609085_EDC1AGRABUYER.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.