Indian Tenders

Tender Notice

TDR 55891929
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7633115
Tender ID GEM/2026/B/7633115
Tender Brief Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Work Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kiraoli, Agra - Part-A (Supp
City Agra
State Uttar Pradesh
Document Fees Refer document
EMD INR 32000.0 /-
Tender Value INR 31.62 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Work Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kiraoli, Agra - Part-A (Supply Of Material)Tail Less Unit Of Reputed Make For 250 Kva Tf , Copper L-Piece 50X225x10 Mm , Copper L-Piece 62X225x12 Mm , Al. Lug Long Barrel Off Size , Al. Lug Long 400 Sqmm , Al. Lug Long 240 Sqmm , Alu. Lug 120 Sqmm , Cl For Distribution Box , Earth Wire Cl , Suspension Cl , Dead End Cl , Pg Cl , Piercing Connector , Lt Smc Box , Lt Pvc Armed Cable 4X16 Sqmm , Danger Board , Barbed Wire , J Hook , Lt Incoming Pannel With Metering Equipment , Lt Pole Cl With Nut & Bolt , Dp Cl For 11 Kv , I Hook , Number Plate , Stone Pad , Ms Base Angle , I Bolts For Service Cables , Top Channel , Dropper Channel , Ms T-Off Channel , Lt 4 Core Mcb With Box , F-Cl , Cross Arm Cl , Holding Cl , Gaurding Angle , Gaurding Angle Cl , Cl For Lt T-Off With Nut & Bolt , Alu. Paint , Red Oxide Paint , Part-B (Erection Work)Carriage Of 16 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 25 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 63 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 100 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 250 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of Pcc Pole 8.5 Mtr. Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Lt Xlpe Cable Alu. 3.5X400 Sqmm (420 Mtr.), Lt Xlpe Cable Alu. 3.5X150 Sqmm (114 Mtr.), Lt Xlpe Cable Alu. 3.5X70 Sqmm (40 Mtr.), Lt Xlpe Cable 1X400 Sqmm (200 Mtr.), Lt Xlpe Cable 1X240 Sqmm (448 Mtr.), Lt Xlpe Cable 3.5X400 Sqmm (15 Mtr.), Alu. Cable 1X16 Sqmm (32 Mtr.), Lt Xlpe Cable Alu. 1X120 Sqmm (30 Mtr.), From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Cartiage Of Line Material From Store Center Agra To Work Of Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Tpmo (10), 11 Kv Fuse Set (15), Distribution Box (68), 11 Kv V Type X Arm (07), Ms Angle 75X75x6x2028 Mm (14), Stay Complete (58), 11 Kv Disc Insulator With Fitting (63), 11 Kv Pin Insulator With Pin & Nut (82), Earthing Complete (80), Weasol Conductor (1724), T Complete (2), Lt Abc 3X120 Sqmm (670 Mtr.), Lt Abc 3X95 Sqmm (642 Mtr.), Lt Abc 3X50 Sqmm (2920 Mtr.), Lt Abc 1X25 Sqmm (120 Mtr.), Gaurding Wire (66 Kg.) And Other Line Material, If Required In Estimate/Package. , Mounting Of 16 Kva T/F On Single/Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 25 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 63 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 100 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Installation Of 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Single Pole 11 Mtr. Long St Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 11 Mtr. Long St Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 1X25 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X50 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X95 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X120 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Of Lt Xlpe Alu. Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Alu. Cable 3.5X150 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Alu. Cable 3.5X70 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X240 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Alu. Cable 1X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Alu. Cable 1X120 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying & Connecting Of Lt Pvc Armed Cable 4X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Erection And Grouting Of Stay Complete Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing Binding And Jumpering Of Acsr Weasel Conductor At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Installation Of Distribution Box With Cl As Per Respo Norms , Fixing Of Tpmo With Polymer Insulator As Per Site Requirment And Respo Norms. , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Complete Fixing, Installation & Commissoning Of Tail Less Unit Including Making Proper Cable Connection In Direction By Supervising Engineer As Per Respo Norms. , Complete Fixing, Installation & Commissoning Of Lt Incoming Pannel With Metering Equipment Including Making Proper Cable Connection In Direction By Supervising Engineer As Per Respo Norms. , Fixing Of Copper L-Piece 50X225x10 Mm In Direction By Supervising Engineer. , Fixing Of Copper L-Piece 62X225x12 Mm In Direction By Supervising Engineer. , Fixing Of Al. Lug Long Barrel Off Size In Direction By Supervising Engineer. , Fixing Of Al. Lug Long 400 Sqmm In Direction By Supervising Engineer. , Fixing Of Al. Lug Long 240 Sqmm In Direction By Supervising Engineer. , Fixing Of Al. Lug Long 120 Sqmm In Direction By Supervising Engineer. , Fixing Of Piercing Connector In Direction By Supervising Engineer. , Fixing Of Danger Board In Direction By Supervising Engineer. , Fixing Of Barbed Wire In Direction By Supervising Engineer. , Fixing Of J Hook In Direction By Supervising Engineer. , Fixing Of Ms Base Angle In Direction By Supervising Engineer. , Fixing Of I Hook In Direction By Supervising Engineer. , Installation Of Smc Box In Direction By Supervising Engineer. , Installation & Fixing Of Top Channel In Direction By Supervising Engineer. , Installation & Fixing Of Ms T-Off Channel In Direction By Supervising Engineer. , Installation & Fixing Of Lt 4 Core Mcb With Box In Direction By Supervising Engineer. , Installation & Fixing Of Dropper Channel In Direction By Supervising Engineer. , Fixing Of F-Cl In Direction By Supervising Engineer. , Fixing Of Cross Arm Cl In Direction By Supervising Engineer. , Fixing Of Holding Cl In Direction By Supervising Engineer. , Fixing Of Gaurding Angle With Cl In Direction By Supervising Engineer. , Fixing Of Cl For Lt T-Off With Nut & Bolt In Direction By Supervising Engineer. , Concreting Of Stay , Concreting Of Pole , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6/8 Swg Including Fabrication And Fixing Of Guarding Angle With Holding Cl S And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Dismentling & Removal Of 10 Kva T/F-(01 Nos.) & 16 Kva T/F (02 Nos) And Receive Back To Store Center Agra (Apprx 00-70 Km) , Dismentling & Removal Of 100 Kva T/F And Receive Back To Store Center Agra (Apprx 00-70 Km)

Key Dates

Publish Date 09-06-2026
Last Date of Bid Submission 24-06-2026
Tender Opening Date 24-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 282005,EDC-I , B-690 Kamla Nagar, Agra

BOQ Items

Sl. No. Item TitleItem Description
1Part-A (Supply of Material)Tail less Unit of Reputed Make for 250 KVA TFPart-A (Supply of Material)Tail less Unit of Reputed Make for 250 KVA TF
2Copper L-Piece 50x225x10 MMCopper L-Piece 50x225x10 MM
3Copper L-Piece 62x225x12 MMCopper L-Piece 62x225x12 MM
4Al. Lug long Barrel off sizeAl. Lug long Barrel off size
5Al. Lug long 400 SQMMAl. Lug long 400 SQMM
6Al. Lug long 240 SQMMAl. Lug long 240 SQMM
7Alu. Lug 120 sqmmAlu. Lug 120 sqmm
8Clamp for Distribution BoxClamp for Distribution Box
9Earth Wire ClampEarth Wire Clamp
10Suspension clampSuspension clamp
11Dead End ClampDead End Clamp
12PG ClampPG Clamp
13Piercing ConnectorPiercing Connector
14LT SMC BoxLT SMC Box
15LT PVC Armed Cable 4x16 sqmmLT PVC Armed Cable 4x16 sqmm
16Danger BoardDanger Board
17Barbed WireBarbed Wire
18J HookJ Hook
19LT Incoming Pannel with metering equipmentLT Incoming Pannel with metering equipment
20LT Pole Clamp with nut & boltLT Pole Clamp with nut & bolt
21DP Clamp for 11 KVDP Clamp for 11 KV
22I HookI Hook
23Number PlateNumber Plate
24Stone PadStone Pad
25MS Base AngleMS Base Angle
26I Bolts for service cablesI Bolts for service cables
27Top ChannelTop Channel
28Dropper ChannelDropper Channel
29MS T-Off ChannelMS T-Off Channel
30LT 4 core MCB with boxLT 4 core MCB with box
31F-ClampF-Clamp
32Cross Arm ClampCross Arm Clamp
33Holding ClampHolding Clamp
34Gaurding AngleGaurding Angle
35Gaurding angle ClampGaurding angle Clamp
36Clamp for LT T-off with nut & boltClamp for LT T-off with nut & bolt
37Alu. PaintAlu. Paint
38Red Oxide PaintRed Oxide Paint
39Part-B (Erection work)Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Part-B (Erection work)Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
40Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
41Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
42Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
43Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
44Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
45Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
46Cartiage of LT XLPE Cable Alu. 3.5x400 sqmm (420 Mtr.), LT XLPE Cable Alu. 3.5x150 sqmm (114 Mtr.), LT XLPE Cable Alu. 3.5x70 sqmm (40 Mtr.), LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (448 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT XLPE Cable Alu. 3.5x400 sqmm (420 Mtr.), LT XLPE Cable Alu. 3.5x150 sqmm (114 Mtr.), LT XLPE Cable Alu. 3.5x70 sqmm (40 Mtr.), LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (448 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
47Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), Distribution Box (68), 11 KV V Type X Arm (07), MS Angle 75x75x6x2028 MM (14), Stay Complete (58), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (80), Weasol Conductor (1724), T Complete (2), LT ABC 3x120 sqmm (670 Mtr.), LT ABC 3x95 sqmm (642 Mtr.), LT ABC 3x50 sqmm (2920 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package.Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), Distribution Box (68), 11 KV V Type X Arm (07), MS Angle 75x75x6x2028 MM (14), Stay Complete (58), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (80), Weasol Conductor (1724), T Complete (2), LT ABC 3x120 sqmm (670 Mtr.), LT ABC 3x95 sqmm (642 Mtr.), LT ABC 3x50 sqmm (2920 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package.
48Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
49Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
50Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
51Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
52Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
53Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
54Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
55Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
56Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
57Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
58Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
59Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
60Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
61Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.
62Laying of LT XLPE Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer.
63Laying of LT XLPE Alu. Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer.
64Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer.
65Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.
66Laying of LT XLPE Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.
67Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer.
68Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.
69Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer.Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer.
70Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
71Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
72Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
73Installation of 11 KV Fuse set as per RESPO NORMSInstallation of 11 KV Fuse set as per RESPO NORMS
74Installation of Distribution Box with Clamp as per RESPO NORMSInstallation of Distribution Box with Clamp as per RESPO NORMS
75Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.
76Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
77Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
78Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
79Complete fixing, Installation & Commissoning of Tail less unit including making proper cable connection in direction by supervising Engineer as per RESPO NORMS.Complete fixing, Installation & Commissoning of Tail less unit including making proper cable connection in direction by supervising Engineer as per RESPO NORMS.
80Complete fixing, Installation & Commissoning of LT incoming Pannel with metering equipment including making proper cable connection in direction by supervising Engineer as per RESPO NORMS.Complete fixing, Installation & Commissoning of LT incoming Pannel with metering equipment including making proper cable connection in direction by supervising Engineer as per RESPO NORMS.
81Fixing of Copper L-Piece 50x225x10 MM in direction by supervising Engineer.Fixing of Copper L-Piece 50x225x10 MM in direction by supervising Engineer.
82Fixing of Copper L-Piece 62x225x12 MM in direction by supervising Engineer.Fixing of Copper L-Piece 62x225x12 MM in direction by supervising Engineer.
83Fixing of Al. Lug long Barrel off size in direction by supervising Engineer.Fixing of Al. Lug long Barrel off size in direction by supervising Engineer.
84Fixing of Al. Lug long 400 SQMM in direction by supervising Engineer.Fixing of Al. Lug long 400 SQMM in direction by supervising Engineer.
85Fixing of Al. Lug long 240 SQMM in direction by supervising Engineer.Fixing of Al. Lug long 240 SQMM in direction by supervising Engineer.
86Fixing of Al. Lug long 120 SQMM in direction by supervising Engineer.Fixing of Al. Lug long 120 SQMM in direction by supervising Engineer.
87Fixing of Piercing Connector in direction by supervising Engineer.Fixing of Piercing Connector in direction by supervising Engineer.
88Fixing of Danger board in direction by supervising Engineer.Fixing of Danger board in direction by supervising Engineer.
89Fixing of Barbed wire in direction by supervising Engineer.Fixing of Barbed wire in direction by supervising Engineer.
90Fixing of J Hook in direction by supervising Engineer.Fixing of J Hook in direction by supervising Engineer.
91Fixing of MS base angle in direction by supervising Engineer.Fixing of MS base angle in direction by supervising Engineer.
92Fixing of I Hook in direction by supervising Engineer.Fixing of I Hook in direction by supervising Engineer.
93Installation of SMC Box in direction by supervising Engineer.Installation of SMC Box in direction by supervising Engineer.
94Installation & Fixing of Top Channel in direction by supervising Engineer.Installation & Fixing of Top Channel in direction by supervising Engineer.
95Installation & Fixing of MS T-off Channel in direction by supervising Engineer.Installation & Fixing of MS T-off Channel in direction by supervising Engineer.
96Installation & Fixing of LT 4 core MCB with box in direction by supervising Engineer.Installation & Fixing of LT 4 core MCB with box in direction by supervising Engineer.
97Installation & Fixing of Dropper Channel in direction by supervising Engineer.Installation & Fixing of Dropper Channel in direction by supervising Engineer.
98Fixing of F-Clamp in direction by supervising Engineer.Fixing of F-Clamp in direction by supervising Engineer.
99Fixing of Cross Arm Clamp in direction by supervising Engineer.Fixing of Cross Arm Clamp in direction by supervising Engineer.
100Fixing of Holding Clamp in direction by supervising Engineer.Fixing of Holding Clamp in direction by supervising Engineer.
101Fixing of Gaurding Angle with clamp in direction by supervising Engineer.Fixing of Gaurding Angle with clamp in direction by supervising Engineer.
102Fixing of Clamp for LT T-off with nut & bolt in direction by supervising Engineer.Fixing of Clamp for LT T-off with nut & bolt in direction by supervising Engineer.
103Concreting of StayConcreting of Stay
104Concreting of PoleConcreting of Pole
105Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
106Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.
107Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.
108Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM)Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM)
109Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM)Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM)

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download ATC_3f4fe876-15be-4371-838e1780757402808_EDC1AGRABUYER.pdf Tender Documents 0 KB
Download dba92318-b893-4951-81d3-759aa9378ba7.pdf Tender Documents 0 KB
Download 1780757124.xlsx Tender Documents 0 KB
Download 1780757131.pdf Tender Documents 0 KB
Download 1780757135.pdf Tender Documents 0 KB
Download 1780757138.pdf Tender Documents 0 KB
Download 1780757143.pdf Tender Documents 0 KB
Download 1780757147.pdf Tender Documents 0 KB
Download 1780757151.pdf Tender Documents 0 KB
Download 1780757171.pdf Tender Documents 0 KB
Download 1780757176.pdf Tender Documents 0 KB
Download 1780757199.pdf Tender Documents 0 KB
Download 1780757206.pdf Tender Documents 0 KB
Download 1780757227.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.