| 1 | Excavation in trenches n exc 1.5 Mtr wide and not exc 1.5 Mtr deep in hard/dense soil and getting out and levelling of bottom surface to required level for laying UG cable / errection of poles all as specified. |
| 2 | Excavation in trenches n exc 1.5 Mtr wide and not exc 1.5 Mtr deep in soft/disintegrated rock getting out and levelling of bottom surface to required level all as specified. |
| 3 | Cutting of road crossing/PCC hard standing, under boundary wall for laying of pipe/cable including making good the existing surface with same finish to match the original finish all as all as directed by Engr-in-Charge. |
| 4 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25cm thick all as specified. |
| 5 | Removing excavated material from site to a distance not exc 50 mtr and depositing where directed not exc 1.5mtr from the starting point.all as specified. |
| 6 | Supply and lay in repairs Double walled corrugated pipe (DWC ), outer dia 40 mm bore for cable protection as a guard pipe including required accessories etc. complete as specified and directed. |
| 7 | Supply and lay in repairs Double walled corrugated pipe (DWC ),outer dia 75/ 77 mm bore for cable protection as a guard pipe including required accessories etc. complete as specified and directed. |
| 8 | Supply and lay in repairs Double walled corrugated pipe (DWC ), outer/inner dia 90/75 mm bore for cable protection as a guard pipe including required accessories etc. complete as specified and directed. |
| 9 | M & L in repairs for laying LT UG XLPE insulated, screened PVC bedded galvanised steel strip or wire armoured, heavy duty electric power cables of size 10 SQ mm 4 core , with multistranded aluminium conductor, 1100 volts grade, confirming to IS including centre glands as required suitable size lugs at end termination etc, laid in trenches/ wall / poles/ ceiling and connecting with existing LT switch gears /Bus Bar/Junction boxes etc, including testing and commissioning complete all as specified and directed.Note: 1) Rate quoted includes taking out old unserviceable UG LT cable.2) Earth work and DWC pipe shall be measured and paid separately under relevant items of this schedule |
| 10 | All as per item No 9 here in before but o size 4 core 16 sqmm |
| 11 | All as per item No 9 here in before but of size 4 core 25 sqmm |
| 12 | Ditto all as per item No 9 here in before but of size 3 1/2 core 35 sqmm |
| 13 | Ditto all as per item No 9 here in before but of size 3 1/2 core 50 sqmm |
| 14 | Ditto all as per item No 9 here in before but of size 3 1/2 core 70 sqmm |
| 15 | Ditto all as per item No 9 here in before but of size 3 1/2 core 95 sqmm |
| 16 | Ditto all as per item No 9 here in before but of size 3 1/2 core 120 sqmm |
| 17 | Ditto all as per item No 9 here in before but of size 3 1/2 core 150 sqmm |
| 18 | Ditto all as per item No 9 here in before but of size 3 1/2 core 240 sqmm |
| 19 | Ditto all as per item No 9 here in before but of size 3 1/2 core 300 sqmm |
| 20 | M & L for laying Heavy duty Machine pressed precast concrete interlocking paver block of shape zigzag/Square of thickness not less than 80 MM, in Path/ road cutting area for making good to existing Road/Path surfaces including required preperation / basement in disturbed surfaces and jointing with existing Path/Road complete all as specified. Please Enable Macros to View BoQ information |
| 21 | M & L for laying Heavy duty Machine pressed precast concrete interlocking paver block of shape zigzag/Square of thickness not less than 80 MM, in Path/ road cutting area for making good to existing Road/Path surfaces including required preperation / basement in disturbed surfaces and jointing with existing Path/Road complete all as specified. Please Enable Macros to View BoQ information |