| 1 | कवर्ड नाला का निर्माण कार्य। |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground 1 level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleare (PWD SOR 2.31) |
| 3 | Dewatering work Drain/Nala etc. including supply of all materials, labour and T&P etc required for proper completion of the work as per For Back Drain Water Discharge |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. (Mud WORK) (UPPWD SOR 2.8.1+20% extra Rate for under water or liquid mud or foul soil work (SOR 2019 CH. 04 Sl. No. 07) |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (UPPWD SOR 2.25) |
| 6 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). (UPPWD SOR 2.16.1 Depth not exceeding 1.5 m) |
| 7 | feving and laying cement concrete 1: 6:12 (1 cement: 6 C.sand: 8 graded brick aggregate 40mm nominal size.) including supply of all materials, labour and T&P ete required for proper completion of the work as per (UPPWD SOR sl no. 273) |
| 8 | R.C.C. work in slab in 1:2:4 in cement coarse sand & 20mm grade stone grit excluding supply of reinforcement but excluding cost of centering and shuttering etc. all respects as (UPPWD S.I. No. 5.1.3) |
| 9 | Mild steel orion in plain work such as reinforced concrete or reinforced, brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks UPPWD SOR sl. no. 504) |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for- (i) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (UPPWD sl. no. 5.9.2) |
| 11 | Disposal of malwa including loading, Unloading and shifting up to 4.00Km Distence in all Complete. (UPPWD SOR 2020 CH. 3-CARTAGE) |
| 12 | P/F of display/ inauguration black granite board including letter writing etc. All cost complete |
| 13 | Add 18% GST Please Enable Macros to View BoQ information |