| 1 | Earthwork: Excavation in foundation etc. in ordinary soil including lift upto 1.5m lead upto 50m including filling watering and removal of surplus earth as directed by the Engineer-in-charge specification all complete. DSR 2023/2.1.1 |
| 2 | Concrete with 4cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 8:4:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.(DSR/2023 4.1.8) |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources).((DSR/2023 5.1.2) |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR/2023 5.2.2) |
| 5 | RCC work with cement approved coarse sand and 2cm (3/4\\")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 1½ coarsesand : 3 stonegrit) in slab excluding necessary centering & shuttering excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG binding wire(DSR/2023 5.3) |
| 6 | Mild steel (Tor steel or plain) in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage band overlapping and including cost of binding wire.((DSR/2023 5.22.1) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete(DSR/2023 5.9.1) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(DSR/2023 5.9.2) |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (DSR/2023 5.9.3) |
| 10 | Providing of PVC pipe 100mm dia 6kg pressure including cartage of pipe,supply of all material labour T&P required for proper completion of work PWD SOR /2025 SI 15(iv) |
| 11 | S/Laying of dry brick ballast including supply of all the material labour T&P required for proper completion of work. SOR 2025/ Chapter-2 Please Enable Macros to View BoQ information |