|
| 1 | Loading & Unloading of 9m PSC pole |
| 2 | Excavation of 9m pole pits (1.25m *0.6m *1.83m) in Normal Ground |
| 3 | Erection of 9m PSC pole in Normal Ground |
| 4 | Transportation of 9m PSC pole from road side to pole pit upto 2KM |
| 5 | Loading & Unloading of 8m PSC pole |
| 6 | Excavation of 8m pole pits (1.25m *0.5m *1.5m) in Normal Ground |
| 7 | Erection of 8m PSC pole in Normal Ground |
| 8 | Transportation of 8m PSC pole from road side to pole pit upto 2KM |
| 9 | Erection of Guarding X arm |
| 10 | Erection of V X arm 4.5 feet |
| 11 | Fixing of HT/LT TI Fittings |
| 12 | Erection of Tapping channel X arm |
| 13 | Fixing of HT pin Insulator |
| 14 | Fixing of HT strain disc 11KV |
| 15 | Fixing of LT 3 phase cross arm |
| 16 | Fixing of LT 1 phase cross arm |
| 17 | Fixing of LT pin insulator |
| 18 | Fixing of Shackle |
| 19 | Fixing of aluminium knob |
| 20 | Excavation of stay pit (1.00m *0.5m *1.5m) in Normal Ground |
| 21 | Erection of stay set complete in Normal Ground |
| 22 | Paving and stringing of LT ACSR 7/ 2.59 conductor in pin point |
| 23 | Paving and stringing of LT ACSR 7/3.35 conductor in cut point |
| 24 | Coll earthing per pole & pole earthing |
| 25 | Coping of pole (0.6m* 0.6m* 0.35m) |
| 26 | Loading & Unloading of Line Materials |
| 27 | Transportation of line materials from section office to work spot up to 20 KM |
| 28 | Drilling /less than 23mm hole per hole /slatted hole |
| 29 | Dismantling & refixing of V X arm 4.5 feet |
| 30 | Dismantling & refixing of TI fittings |
| 31 | Dismantling & refixing of tapping cross arm 4.5 feet |
| 32 | Dismantling & refixing of LT S phase cross arm |
| 33 | Dismantling & refixing of LT 3 phase cross arm |
| 34 | Fixing if Street light Switching point arrangement |
| 35 | Dismantling and reerection of Three phase service connection |
| 36 | Dismantling and reerection of Single phase service connection |
| 37 | Fixing of Street light LED lamp Fixing |
| 38 | Dismantling of stay set complite with fixing up stay wire ,Eye, bow, Guyshackle, Binding etc |
| 39 | Dismantling & refixing of aluminium knob |
| 40 | Dismantling & Reatringing of LT ACSR 7/2.59 conductors |
| 41 | Dismantling & Reatringing of conductors of Lt ACSR 7/3.35 conductors in pin point |
| 42 | Tree clearance in HT or LT location for ordinary treeclerance and Throng bushes & trees. Please Enable Macros to View BoQ information |