| 1 | Excavation in trenches in soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in deep and getting out for laying of cable/ pipes etc including forming bottom surfaces to the required level/slope complete all as specified and directed. |
| 2 | Returning , filling in includiing spreading levelling, watering and well ramming in layers not exceeding 25 cm thick in soil comlete all as specified and directed. |
| 3 | Removing surplus excavated to a distance not exc 50 mtr and depositing where directed at level not exc 1.5mtr above the starting point complete all as specified and directed. |
| 4 | M & L for approved river sand cushioning for under ground cable in trenches 8 cm before laying and 15cm after laying of cable and punned thickness of sand shall be measured and paid for 18 cm only after punned /consolidated thickness complete all as specified and directed. |
| 5 | Supplying and laying un-reinforced precast concrete cable cover, class HV, Type-2, flat, size 450mm x 180mm x 40mm, ISI marked, laid flat across the cable length for cable protection embossed with HT 11 KV electric on the top surface complete all as specified and directed. |
| 6 | Supply , laying and testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) conforming to latest relevant IS with multy stranded aluminium conductor, 11000 volts grade of size 3 core 95 mm cable laid in trenches/ducts/under plinth floor passing through pipe etc, fixed on wall complete all as specified and directed. |
| 7 | Supply and laying Galvanised iron pipe \\"light grade\\" with all fittings for passing of cables fixed to pole/wall/laid under floor or roads including all fixing accessories complete for protection of cable of following sizes complete all as specified and directed. (i) 100 mm bore |
| 8 | (ii) 80mm bore |
| 9 | Supply, installation,commsssioning, & testing copper wound distribution Transformer step down, outdoor type, plinth mounted maximum total losses inaccoradance to energy efficient level three as per IS 1180 amended no IV (Part-I) of 11/0.433 KV capacity 100 KVA, AC 3 phase, 50 Hz oil immersed naturally cooled delta connected on primery side (11 KV HV side) Dyn -11 with neutral brought out on secondary side with tapping at + 2.5% + 5% off load tap changer gear in steps of 2.5 % including initial oil fill to appropriate level & all standard fitting all as per IS 1180 amended no IV Pt-1 March 2021 complete all as specified and directed. |
| 10 | The unit rate for each transformer includes the cost of following accessories /fittings:(a) Rating and terminal marking plates, non-detachable.(b) Earthing terminals with lugs -02 No's(c) Lifting lugs for main tank and toop cover(d) Thermometer pocket with cap. Along with dial type thermometer -01 No(e) Externally hand operated OFF circuit tap, changing devices with locking arrangement.(f) Oil conservator tank with fitting hole, drain plug prismatic oil level gauge.(g) Silica gel dehydrating breather charged with silica gel.(h) Top filter valve with plug Note-: (i) Transformer shall be inspected by inspecting officer nominated by accepting officer for testing and inspection at factory before dispatch. (ii) Precommissning shall be done by SEI. (iii) All cost deemed to be included in quoted rated for arrangment of test.No extra cost will be paid for any type of testing as directed by Engr-in Charge. Make:-Schneider /Indian Transformers & Electricals Pvt Ltd.(Brand-ITE Gurgaon)/ Crompton |
| 11 | Supply, installation,commsssioning, & testing copper wound distribution Transformer step down, outdoor type, plinth mounted maximum total losses inaccoradance to energy efficient level three as per IS 1180 amended no IV (Part-I) of 11/0.433 KV capacity 200 KVA, AC 3 phase, 50 Hz oil immersed naturally cooled delta connected on primery side (11 KV HV side) Dyn -11 with neutral brought out on secondary side with tapping at + 2.5% + 5% off load tap changer gear in steps of 2.5 % including initial oil fill to appropriate level & all standard fitting all as per IS 1180 amended no IV Pt-1 March 2021 complete all as specified and directed. |
| 12 | The unit rate for each transformer includes the cost of following accessories /fittings:(a) Rating and terminal marking plates, non-detachable.(b) Earthing terminals with lugs -02 No's(c) Lifting lugs for main tank and toop cover(d) Thermometer pocket with cap. Along with dial type thermometer -01 No(e) Externally hand operated OFF circuit tap, changing devices with locking arrangement.(f) Oil conservator tank with fitting hole, drain plug prismatic oil level gauge.(g) Silica gel dehydrating breather charged with silica gel.(h) Top filter valve with plug Note-: (i) Transformer shall be inspected by inspecting officer nominated by accepting officer for testing and inspection at factory before dispatch. (ii) Precommissning shall be done by SEI. (iii) All cost deemed to be included in quoted rated for arrangment of test.No extra cost will be paid for any type of testing as directed by Engr-in Charge. Make:-Schneider/Indian Transformers & Electricals Pvt Ltd.(Brand-ITE Gurgaon)/Crompton |
| 13 | Supply, installation,commsssioning, & testing copper wound distribution Transformer step down, outdoor type, plinth mounted maximum total losses inaccoradance to energy efficient level three as per IS 1180 amended no IV (Part-I) of 11/0.433 KV capacity 250 KVA, AC 3 phase, 50 Hz oil immersed naturally cooled delta connected on primery side (11 KV HV side) Dyn -11 with neutral brought out on secondary side with tapping at + 2.5% + 5% off load tap changer gear in steps of 2.5 % including initial oil fill to appropriate level & all standard fitting all as per IS 1180 amended no IV Pt-1 March 2021 complete all as specified and directed. |
| 14 | The unit rate for each transformer includes the cost of following accessories /fittings:(a) Rating and terminal marking plates, non-detachable.(b) Earthing terminals with lugs -02 No's(c) Lifting lugs for main tank and toop cover(d) Thermometer pocket with cap. Along with dial type thermometer -01 No(e) Externally hand operated OFF circuit tap, changing devices with locking arrangement.(f) Oil conservator tank with fitting hole, drain plug prismatic oil level gauge.(g) Silica gel dehydrating breather charged with silica gel.(h) Top filter valve with plug Note-: (i) Transformer shall be inspected by inspecting officer nominated by accepting officer for testing and inspection at factory before dispatch. (ii) Precommissning shall be done by SEI. (iii) All cost deemed to be included in quoted rated for arrangment of test.No extra cost will be paid for any type of testing as directed by Engr-in Charge. Make:-Schneider/Indian Transformers & Electricals Pvt Ltd.(Brand-ITE Gurgaon)/Crompton |
| 15 | M&L for earthing complete with steel earth plate eletrode 60cm x 60cm x6mm thick buried dirctly in ground vertically (earth pit not less than 2.25 mtr below ground level) with top edge of plat not less than 1.5 mtr below ground level connected to GI strip 32x6mm by means of bolts. nuts,check nuts and washers etc including protection pipe 15mm dia up to 7.5m length , provision the earth lead to earth connection in ther main distribution box with lugs and GI nuts,bolts, earthing shall be done all as per shown electrical plate No 5 of SSR part 1 Including neccessary excavation in disintergrated and hard soil and 20mm dia GI pipe with funel for watering PCC earth chamber 100mm thick precast RCC cover with suitable precast RCC frame and earth test point and testing in presence of Engr -in -Charge. Make:-Schneider/Indian Transformers & Electricals Pvt Ltd.(Brand-ITE Gurgaon)/Crompton |
| 16 | Construction of Plinth of size 2.0 mx 2.0 mx1.5 m for transformer, using 100 mm thick PCC 1:4:8 type D-2 as in lean concrete, flyash brick masonry in CM 1:6, the top of the plinth shall consist of 100 mm thick PCC 1:2:4 type B-1suitable reinforced (using 20 mm graded stone aggregates) over 75 mm thick PCC 1:4:8 type D-2 over compacted moorum filling, 10 mm thick rendering in CM 1:4 on brick surface with and including 25 cm thick stone aggregates of size 12.5 mm all around upto and including 1.5 m from the edge of the plinth complete all as specified and directed by the Engineer-in-charge and as shown on TD drawing No CEPZ/98/TD/6, Sheet No 2/2. |
| 17 | Disconnecting of 11 KV/ 433 Volts,250 KVA transformer out door including all necessary HT/ LT connections of bothside, earth teriminals and taking down carefully from Platform mounted on PCC foundation etc, shifting to desired MES Store as directed by Eng-in-Charge at Mhow with necessary fixing/ Installation 11 KV/433 Volts tranformer with all necessary HT/ LT electrical connections of following capacity complete all as specified and directed. |
| 18 | Supply and fix cable jointing kit for 11 KV grade (E) cable for indoor end termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured Aluminium conductor cable of size 95 sqmm complete all as specified and directed. |
| 19 | Supply and fix cable jointing kit for 11 KV grade (E) cable for outdoor end termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured Aluminium conductor cable of size 95 sqmm complete all as specified and directed. Please Enable Macros to View BoQ information |