Tender Details

Tender for Increasing Capacity Of 33/11 Kv Sub-Stations Izzatnagar From 3×10 To 3×10+5 Mva, Bhuta From 2×10 To 2×10+5 Mva,Thiriya Nizawat Kha From 2×5 To 3×5 Mva & Other Associates Works Under Edc Bareilly In Business Plan 2026-27

Key Dates

Publish Date 08-06-2026
Last Date of Bid Submission 15-06-2026
Tender Opening Date 15-06-2026

Contact Information

Company Name Madhyanchal Vidut Vitran Nigam Limited
Contact Person SE EWC
Address Bareilly

BOQ Items

Name of Work:- increasing capacity of 33/11 KV Sub-Stations Izzatnagar from 3×10 to 3×10+5 MVA, Bhuta from 2×10 to 2×10+5 MVA,Thiriya Nizawat Kha from 2×5 to 3×5 MVA & other associates works under EDC Bareilly in Business Plan 2026-27
Sl. No. Item Description
1Part (A) -WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11KV S/S IZZATNAGAR RURAL (BAREILLY)
2Supply of following materials
3GI STRIP Flat 50x6mm
4Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
5MS Round of 32 mm dia for laying of main earthmat in switch yard & for panel earthing bridge 24x9x2+3% @6.3 Kg./M
633 KV Lightening Arrestor
733 KV 400 A Bus Isolator
833 KV VCB 800A 750 MVA
9Control pannel I/C for 33 KV Single T/F
1033 kv O/D CT CTR 200/100/1-1-1 A
1133 KV Post insulator
1211 KV VCB I/C CTR 600/300/5A
1311 KV VCB O/G CTR 600/300/5A
14M.S. Channel 125x65mm
15M.S.Angle 75x75x8mm
16MS Angles 50x50x6mm
1711 KV 3x300 mm2 XLPE Cable
1811 KV 3x185 mm2 XLPE Cable
1911 KV Cable jointing Kit 3x185 mm2 I/D
2011 KV Cable jointing Kit 3x185 mm2 O/D
2111 KV Cable jointing Kit 3x300 mm2 I/D
2211 KV Cable jointing Kit 3x300 mm2 O/D
23PCC Pole 8.5m long.
2411 KV Pin Insulator with Pin
25Earthing Complete
26Stay set complete 16x1800mm
2711 KV disc insulator
2811 KV disc fitting
2910 SWG GI Wire
30Cost of ACSR Dog conductor
3133KV XLPE CALE 3*300SQMM
3233KV XLPE CALE BOX 3*300SQMM
33Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
34Laying of M.S. Bar of 32mm dia for making the complete earthmat in the trenches in S/s Yard of 750mm depth and 500mm width with their straightening, cutting accordingly and welding with overlap joint of 100mm cross joint, T joint.
35Making and driving of 3 Mtr. Long electrodes from 32mm dia M.S. Bar having one end conical 150mm long by heat tempering including cutting upto 750mm depth from ground level and welding with earth mat.
36Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 20 Mtr. Depth below G/L including welding etc. by boaring process at LA and two side of 11 KV S/G including cost of GI Pipe of size 40mm dia 15 Mtr Long of ISI mark.(all material provided by firm)
37welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
38Supply of following materials for construction of power tf plinth
39Supply of 90 LBS Rail pieces for T/F (44.64 KG. PER MTR.)
40Supply of bricks as per standard
41Supply of cement as per standard
42Supply of sand as per standard
43Supply of stone ballast 20mm as per standard
44Supply of steel rebar 12mm as per standard
45Supply of brick bat as per standard
46Construction of new transformer plinth of size 4.5x3.5 Mtr. for upto 10 MVA Transfomer having depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level. The work including excavation of foundation. base & concreting of foundation base of CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work of cement morter of ratio 1:4 for masonry & lintring work of transformer plinth of RCC work of ratio 1:2:4 (cement, coarse sand and store grit of 20mm using MS Bars of 10mm dia(tor) for reinforcement of linter including cutting, bending & binding of MS bars of required plinth size & shape. The work also includes laying of 2 Nos. 3.5 Mts. long rail pieces after cutting in proper size & shape & fitting etc. The plinth will be made as per RESSPO/Approved drawing suitable for 10 MVA transformer & shall be plastered of walls of ratio 1:4 (cement & fine sand)/finished on top and sides of the plinth. ( Only erection )
47Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing, depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level.(all decentralised material provided by firm )
48Bus Isolator Structure
49Fabrication of Structure
50C.C. in 1:2:4 for grouting of structure (0.9X0.3X1.3)X2 meter with 0.3 meter above ground level
51Plastering in 1:4 mm thick [(0.9X0.3)+(0.9+0.35)X2]X2
52Excavation of earth in all type of soil [(0.9X0.3X(1.0+0.075)]X2
53Post insulator Structure
54Fabrication of Structure
55C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
56Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
57Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
5833 KV CT Structure
59Fabrication of Structure
60C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
61Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
62Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
63Lightening Arrestor Structure
64Fabrication of Structure
65C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
66Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
67Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
68Fuse Set Structure
69Fabrication of Structure
70C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
71Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
72Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
7333 KV VCB structure size (1.5x1.5x1.5) including erection , CC in 1:2:4 for grouting, plastering in 1:4 mm thick & excavation of earth in all type soil
74Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment:
7533 KV Bus Isolator
7633 KV Fuse Set (Provided by firm)
77Lightening Arrestor
7833 KV VCB
7933 KV CT
8033 KV Post insulator
81Complete laying and termination of copper control cable in PVC Pipe 4\\" dia from 5 MVA power T/F and 33 KV VCB in the out door switch yard in the Transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings.
82Control Cable 4x2.5 mm2
83Control Cable 2x2.5 mm2
84Laying of dog conductor alongwith cost of all required calmps and connectors etc. as per RESSPO Approved drawing from bus bar to L.A., C.T., V.C.B., Bus Isolator etc. complete with sagging and making vertical/Horizontal jumper connections through PG clamps and connecting all the equipments with each others through connecting clamps, (All type of insulator, fitting, PG clamp etc. provided by Firm).
85Making of M.S. Angle Ladder type frame of Angle (75x75x6mm) & M.S. Strip (50x6mm) near power transformer for power cable with concreting in 1:4:8 ratio of cement, sand & coarse aggregate and proper clamping (50x6mm) of the same with transformer cable (All type of, grouting material etc. will be provided by The firm).
86Making of M.S. Angle frame of (75x75x6mm) in the shape of \\"L\\" to connect T/F Neutral by copper flexible strip with proper clamping including cost of copper strip. Earthing of Power T/F Neutral shall be done separately including welding with M.S. bar Electrode bridge 1 No. after making in triangular shape and proper connection with well type earthing etc. Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate ( All type laying material will be provided by the Firm except steel cables ).
87Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ).
88Laying of 33KV 3x300 mm2 xlpe cable from existing bus bar gantry to proposed 33 kv bay with support of ladder . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 33 KV cables ).
89Termination and hosting of 33 KV 3x300 mm2 XLPE cable by filling 33 KV heat shrinkable type cable boxes including proper connection with suitable connectors.
90Erection and grouting of double pole structure of PCC Poles including stays for 11KV out door feeders, complete in all respect as per RESSPO drawing along with grouting material about 3 meter 6\\" dia G.I. pipe along with required elbow shall be provided at D/P for power cable including provision of 03 Nos. feeders name plate on D/P. (all type of grouting material provided by the Firm).
91Erection of 11 KV incoming, outgoing and bus coupler panels (with testing & setting of relays) in substation control room including grouting of Anchor bolts of panel and making of pocket for power cable to insert in panel from trench and complete filling of control room's tranches by river sand.
92Erection & testing of single T/F Control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
93Termination of 11 KV Different size XLPE cable by filling 11 KV heat shrinkable type cable boxes including proper connection with LV side of T/F switch gear panels and double poles by providing suitable connectors.
94Work related maintinance of old and used 5 MVA Transformer.
95Attending of leakage of power transformer (Replacement of damage gasket kit etc)(all required material will be provided by firm.)
96Centrifusing of transformer oil.
97Replacement of damage brether and silica jel.(all required material will be provided by firm.)
98Replacement of damage WTI and OTI.(all required material will be provided by firm.)
99Painting of old transformer.(all required material will be provided by firm.)
100Replacement of damage buchholz relay(all required material will be provided by firm.)
101Replacement of damaged 33kv, 11kv bushings (all required material will be provided by firm.)
102Carriage and top up of transformer oil from any store/workshop of Bareilly Zone 1, Bareilly Zone 2
103Shifting of existing 11 KV VCB panel and re arrange its in control room including its power cable, control cable and busbar connections.
104Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
105Making of cable trench of size 750 mm deep and 750 mm wide and 9 inch wall by Ist class bricks in the ratio 1:6 Base concreting of the wall to be done in ratio 1:6:12 and plaster 12mm thick in ratio 1:4. with trench cover for laying of control cables and 11 KV cables in ssitchyard as per RESSPO. All material will be supllied by the firm.
106Providing of rubber matting sheet 8/10mm
107Shifting and dragging of 33/11kv 5mva tf from road side to its plinth along with its erection including fixing of all assessories and top of oil.
108Carriage of old scrap material from site to store center.
109Making of 11kv Bus Bar on Power Transformer LT side
110soil filling with supply of material
111Part (B) -WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11KV S/S BHUTA (BAREILLY)
112Supply of following materials
113GI STRIP Flat 50x6mm
114Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
115MS Round of 32 mm dia for laying of main earthmat in switch yard & for panel earthing bridge 24x9x2+3% @6.3 Kg./M
11633 KV Lightening Arrestor
11733 KV 400 A Bus Isolator
11833 KV VCB 800A 750 MVA
119Control pannel I/C for 33 KV Single T/F
12033 kv O/D CT CTR 200/100/1-1-1 A
12133 KV Post insulator
12211 KV VCB I/C CTR 600/300/5A
12311 KV VCB I/C CTR 600/300/5A
12411 KV VCB O/G CTR 200/100/5A
125M.S. Channel 125x65mm
126M.S.Angle 75x75x8mm
127MS Angles 50x50x6mm
128MS Channel 100x50x2028mm (For top channel & fuse set)
129M.S angle lron 65x65x6mm, 2700mm long @ 5.8 Kg/Mt (bracing)
13011 KV 3x300 mm2 XLPE Cable
13111 KV 3x185 mm2 XLPE Cable
13211 KV Cable jointing Kit 3x185 mm2 I/D
13311 KV Cable jointing Kit 3x185 mm2 O/D
13411 KV Cable jointing Kit 3x300 mm2 I/D
13511 KV Cable jointing Kit 3x300 mm2 O/D
136PCC Pole 8.5m long.
13711 KV Pin Insulator with Pin
138Earthing Complete
139Stay set complete 16x1800mm
14011 KV disc insulator
14111 KV disc fitting
14210 SWG GI Wire
143Cost of ACSR Dog conductor
14433KV XLPE CALE 3*300SQMM
14533KV XLPE CALE BOX 3*300SQMM
146Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
147Laying of M.S. Bar of 32mm dia for making the complete earthmat in the trenches in S/s Yard of 750mm depth and 500mm width with their straightening, cutting accordingly and welding with overlap joint of 100mm cross joint, T joint.
148Making and driving of 3 Mtr. Long electrodes from 32mm dia M.S. Bar having one end conical 150mm long by heat tempering including cutting upto 750mm depth from ground level and welding with earth mat.
149Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 20 Mtr. Depth below G/L including welding etc. by boaring process at LA and two side of 11 KV S/G including cost of GI Pipe of size 40mm dia 15 Mtr Long of ISI mark.(all material provided by firm)
150welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
151Supply of following materials for construction of power tf plinth
152Supply of 90 LBS Rail pieces for T/F (44.64 KG. PER MTR.)
153Supply of bricks as per standard
154Supply of cement as per standard
155Supply of sand as per standard
156Supply of stone ballast 20mm as per standard
157Supply of steel rebar 12mm as per standard
158Supply of brick bat as per standard
159Construction of new transformer plinth of size 4.5x3.5 Mtr. for upto 10 MVA Transfomer having depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level. The work including excavation of foundation. base & concreting of foundation base of CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work of cement morter of ratio 1:4 for masonry & lintring work of transformer plinth of RCC work of ratio 1:2:4 (cement, coarse sand and store grit of 20mm using MS Bars of 10mm dia(tor) for reinforcement of linter including cutting, bending & binding of MS bars of required plinth size & shape. The work also includes laying of 2 Nos. 3.5 Mts. long rail pieces after cutting in proper size & shape & fitting etc. The plinth will be made as per RESSPO/Approved drawing suitable for 10 MVA transformer & shall be plastered of walls of ratio 1:4 (cement & fine sand)/finished on top and sides of the plinth. ( Only erection )
160Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing, depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level.(all decentralised material provided by firm )
161Bus Isolator Structure
162Fabrication of Structure
163C.C. in 1:2:4 for grouting of structure (0.9X0.3X1.3)X2 meter with 0.3 meter above ground level
164Plastering in 1:4 mm thick [(0.9X0.3)+(0.9+0.35)X2]X2
165Excavation of earth in all type of soil [(0.9X0.3X(1.0+0.075)]X2
166Post insulator Structure
167Fabrication of Structure
168C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
169Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
170Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
17133 KV CT Structure
172Fabrication of Structure
173C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
174Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
175Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
176Lightening Arrestor Structure
177Fabrication of Structure
178C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
179Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
180Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
181Fuse Set Structure
182Fabrication of Structure
183C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
184Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
185Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
18633 KV VCB structure including erection , CC in 1:2:4 for grouting, plastering in 1:4 mm thick & excavation of earth in all type soil
187Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment:
18833 KV Bus Isolator
18933 KV Fuse Set (Provided by firm)
190Lightening Arrestor
19133 KV VCB
19233 KV CT
19333 KV Post insulator
194Complete laying and termination of copper control cable in PVC Pipe 4\\" dia from 5 MVA power T/F and 33 KV VCB in the out door switch yard in the Transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings.
195Control Cable 4x2.5 mm2
196Control Cable 2x2.5 mm2
197Laying of dog conductor alongwith cost of all required calmps and connectors etc. as per RESSPO Approved drawing from bus bar to L.A., C.T., V.C.B., Bus Isolator etc. complete with sagging and making vertical/Horizontal jumper connections through PG clamps and connecting all the equipments with each others through connecting clamps, (All type of insulator, fitting, PG clamp etc. provided by Firm).
198Making of M.S. Angle Ladder type frame of Angle (75x75x6mm) & M.S. Strip (50x6mm) near power transformer for power cable with concreting in 1:4:8 ratio of cement, sand & coarse aggregate and proper clamping (50x6mm) of the same with transformer cable (All type of, grouting material etc. will be provided by The firm).
199Making of M.S. Angle frame of (75x75x6mm) in the shape of \\"L\\" to connect T/F Neutral by copper flexible strip with proper clamping including cost of copper strip. Earthing of Power T/F Neutral shall be done separately including welding with M.S. bar Electrode bridge 1 No. after making in triangular shape and proper connection with well type earthing etc. Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate ( All type laying material will be provided by the Firm except steel cables ).
200Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ).
20111 KV Cable hoisting with GI Pipe 6\\" dia (All type of material provided by the Firm).
202Laying of 33KV 3x300 mm2 xlpe cable from existing bus bar gantry to proposed 33 kv bay with support of ladder . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 33 KV cables ).
203Termination and hosting of 33 KV 3x300 mm2 XLPE cable by filling 33 KV heat shrinkable type cable boxes including proper connection with suitable connectors.
204Erection and grouting of double pole structure of PCC Poles including stays for 11KV out door feeders, complete in all respect as per RESSPO drawing along with grouting material about 3 meter 6\\" dia G.I. pipe along with required elbow shall be provided at D/P for power cable including provision of 03 Nos. feeders name plate on D/P. (all type of grouting material provided by the Firm).
205Erection of 11 KV incoming, outgoing and bus coupler panels (with testing & setting of relays) in substation control room including grouting of Anchor bolts of panel and making of pocket for power cable to insert in panel from trench and complete filling of control room's tranches by river sand.
206Erection & testing of single T/F Control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
207Termination of 11 KV Different size XLPE cable by filling 11 KV heat shrinkable type cable boxes including proper connection with LV side of T/F switch gear panels and double poles by providing suitable connectors.
208Work related maintinance of old and used 5 MVA Transformer.
209Attending of leakage of power transformer (Replacement of damage gasket kit etc)(all required material will be provided by firm.)
210Centrifusing of transformer oil.
211Replacement of damage brether and silica jel.(all required material will be provided by firm.)
212Replacement of damage WTI and OTI.(all required material will be provided by firm.)
213Painting of old transformer.(all required material will be provided by firm.)
214Replacement of damage buchholz relay(all required material will be provided by firm.)
215Replacement of damaged 33kv, 11kv bushings (all required material will be provided by firm.)
216Carriage and top up of transformer oil from any store/workshop of Bareilly Zone 1, Bareilly Zone 2
217Shifting of existing 11 KV VCB panel and re arrange its in control room including its power cable, control cable and busbar connections.
218Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
219Making of cable trench of size 750 mm deep and 750 mm wide and 9 inch wall by Ist class bricks in the ratio 1:6 Base concreting of the wall to be done in ratio 1:6:12 and plaster 12mm thick in ratio 1:4. with trench cover for laying of control cables and 11 KV cables in ssitchyard as per RESSPO. All material will be supllied by the firm.
220Providing of rubber matting sheet 8/10mm
221Shifting and dragging of 33/11kv 5mva tf from road side to its plinth along with its erection including fixing of all assessories and top of oil.
222Carriage of old scrap material from site to store center.
223Making of 11kv Bus Bar on Power Transformer LT side
224Part (C) -WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11KV S/S THIRIYA NIZAWAT KHA (BAREILLY)
225Supply of following materials
226GI STRIP Flat 50x6mm
227Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
228MS Round of 32 mm dia for laying of main earthmat in switch yard & for panel earthing bridge 24x9x2+3% @6.3 Kg./M
22933 KV Lightening Arrestor
23033 KV 400 A Bus Isolator
23133 KV VCB 800A 750 MVA
232Control pannel I/C for 33 KV Single T/F
23333 kv O/D CT CTR 200/100/1-1-1 A
23433 KV Post insulator
23511 KV VCB I/C CTR 600/300/5A
23611 KV VCB O/G CTR 200/100/5A
237M.S. Channel 125x65mm
238M.S.Angle 75x75x8mm
239MS Angles 50x50x6mm
240MS Channel 100x50x2028mm (For top channel & fuse set)
241M.S angle lron 65x65x6mm, 2700mm long @ 5.8 Kg/Mt (bracing)
24211 KV 3x300 mm2 XLPE Cable
24311 KV 3x185 mm2 XLPE Cable
24411 KV Cable jointing Kit 3x185 mm2 I/D
24511 KV Cable jointing Kit 3x185 mm2 O/D
24611 KV Cable jointing Kit 3x300 mm2 I/D
24711 KV Cable jointing Kit 3x300 mm2 O/D
248PCC Pole 8.5m long.
24911 KV Pin Insulator with Pin
250Earthing Complete
251Stay set complete 16x1800mm
25211 KV disc insulator
25311 KV disc fitting
25410 SWG GI Wire
255Cost of ACSR Dog conductor
25633KV XLPE CALE 3*300SQMM
25733KV XLPE CALE BOX 3*300SQMM
258Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
259Laying of M.S. Bar of 32mm dia for making the complete earthmat in the trenches in S/s Yard of 750mm depth and 500mm width with their straightening, cutting accordingly and welding with overlap joint of 100mm cross joint, T joint.
260Making and driving of 3 Mtr. Long electrodes from 32mm dia M.S. Bar having one end conical 150mm long by heat tempering including cutting upto 750mm depth from ground level and welding with earth mat.
261Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 20 Mtr. Depth below G/L including welding etc. by boaring process at LA and two side of 11 KV S/G including cost of GI Pipe of size 40mm dia 15 Mtr Long of ISI mark.(all material provided by firm)
262welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
263Supply of following materials for construction of power tf plinth
264Supply of 90 LBS Rail pieces for T/F (44.64 KG. PER MTR.)
265Supply of bricks as per standard
266Supply of cement as per standard
267Supply of sand as per standard
268Supply of stone ballast 20mm as per standard
269Supply of steel rebar 12mm as per standard
270Supply of brick bat as per standard
271Construction of new transformer plinth of size 4.5x3.5 Mtr. for upto 10 MVA Transfomer having depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level. The work including excavation of foundation. base & concreting of foundation base of CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work of cement morter of ratio 1:4 for masonry & lintring work of transformer plinth of RCC work of ratio 1:2:4 (cement, coarse sand and store grit of 20mm using MS Bars of 10mm dia(tor) for reinforcement of linter including cutting, bending & binding of MS bars of required plinth size & shape. The work also includes laying of 2 Nos. 3.5 Mts. long rail pieces after cutting in proper size & shape & fitting etc. The plinth will be made as per RESSPO/Approved drawing suitable for 10 MVA transformer & shall be plastered of walls of ratio 1:4 (cement & fine sand)/finished on top and sides of the plinth. ( Only erection )
272Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing, depth 0.5 Mtr. below ground level & 0.5 Mtr. above from solid soil ground level.(all decentralised material provided by firm )
273Bus Isolator Structure
274Fabrication of Structure
275C.C. in 1:2:4 for grouting of structure (0.9X0.3X1.3)X2 meter with 0.3 meter above ground level
276Plastering in 1:4 mm thick [(0.9X0.3)+(0.9+0.35)X2]X2
277Excavation of earth in all type of soil [(0.9X0.3X(1.0+0.075)]X2
278Post insulator Structure
279Fabrication of Structure
280C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
281Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
282Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
28333 KV CT Structure
284Fabrication of Structure
285C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
286Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
287Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
288Lightening Arrestor Structure
289Fabrication of Structure
290C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
291Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
292Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
293Fuse Set Structure
294Fabrication of Structure
295C.C. in 1:2:4 for grouting of structure (0.3X0.3X1.3)X2 meter with 0.3 meter above ground level
296Plastering in 1:4 mm thick [(0.3X0.3)+(0.3+0.35)X2+(0.3X0.35)X2]X2
297Excavation of earth in all type of soil [(0.3X0.3X(1.0+0.075)]X2
29833 KV VCB structure including erection , CC in 1:2:4 for grouting, plastering in 1:4 mm thick & excavation of earth in all type soil
299Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment:
30033 KV Bus Isolator
30133 KV Fuse Set (Provided by firm)
302Lightening Arrestor
30333 KV VCB
30433 KV CT
30533 KV Post insulator
306Complete laying and termination of copper control cable in PVC Pipe 4\\" dia from 5 MVA power T/F and 33 KV VCB in the out door switch yard in the Transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings.
307Control Cable 4x2.5 mm2
308Control Cable 2x2.5 mm2
309Laying of dog conductor alongwith cost of all required calmps and connectors etc. as per RESSPO Approved drawing from bus bar to L.A., C.T., V.C.B., Bus Isolator etc. complete with sagging and making vertical/Horizontal jumper connections through PG clamps and connecting all the equipments with each others through connecting clamps, (All type of insulator, fitting, PG clamp etc. provided by Firm).
310Making of M.S. Angle Ladder type frame of Angle (75x75x6mm) & M.S. Strip (50x6mm) near power transformer for power cable with concreting in 1:4:8 ratio of cement, sand & coarse aggregate and proper clamping (50x6mm) of the same with transformer cable (All type of, grouting material etc. will be provided by The firm).
311Making of M.S. Angle frame of (75x75x6mm) in the shape of \\"L\\" to connect T/F Neutral by copper flexible strip with proper clamping including cost of copper strip. Earthing of Power T/F Neutral shall be done separately including welding with M.S. bar Electrode bridge 1 No. after making in triangular shape and proper connection with well type earthing etc. Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate ( All type laying material will be provided by the Firm except steel cables ).
312Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ).
31311 KV Cable hoisting with GI Pipe 6\\" dia (All type of material provided by the Firm).
314Laying of 33KV 3x300 mm2 xlpe cable from existing bus bar gantry to proposed 33 kv bay with support of ladder . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 33 KV cables ).
315Termination and hosting of 33 KV 3x300 mm2 XLPE cable by filling 33 KV heat shrinkable type cable boxes including proper connection with suitable connectors.
316Erection and grouting of double pole structure of PCC Poles including stays for 11KV out door feeders, complete in all respect as per RESSPO drawing along with grouting material about 3 meter 6\\" dia G.I. pipe along with required elbow shall be provided at D/P for power cable including provision of 03 Nos. feeders name plate on D/P. (all type of grouting material provided by the Firm).
317Erection of 11 KV incoming, outgoing and bus coupler panels (with testing & setting of relays) in substation control room including grouting of Anchor bolts of panel and making of pocket for power cable to insert in panel from trench and complete filling of control room's tranches by river sand.
318Erection & testing of single T/F Control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
319Termination of 11 KV Different size XLPE cable by filling 11 KV heat shrinkable type cable boxes including proper connection with LV side of T/F switch gear panels and double poles by providing suitable connectors.
320Work related maintinance of old and used 5 MVA Transformer.
321Attending of leakage of power transformer (Replacement of damage gasket kit etc)(all required material will be provided by firm.)
322Centrifusing of transformer oil.
323Replacement of damage brether and silica jel.(all required material will be provided by firm.)
324Replacement of damage WTI and OTI.(all required material will be provided by firm.)
325Painting of old transformer.(all required material will be provided by firm.)
326Replacement of damage buchholz relay(all required material will be provided by firm.)
327Replacement of damaged 33kv, 11kv bushings (all required material will be provided by firm.)
328Carriage and top up of transformer oil from any store/workshop of Bareilly Zone 1, Bareilly Zone 2
329Shifting of existing 11 KV VCB panel and re arrange its in control room including its power cable, control cable and busbar connections.
330Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
331Making of cable trench of size 750 mm deep and 750 mm wide and 9 inch wall by Ist class bricks in the ratio 1:6 Base concreting of the wall to be done in ratio 1:6:12 and plaster 12mm thick in ratio 1:4. with trench cover for laying of control cables and 11 KV cables in ssitchyard as per RESSPO. All material will be supllied by the firm.
332Providing of rubber matting sheet 8/10mm
333Shifting and dragging of 33/11kv 5mva tf from road side to its plinth along with its erection including fixing of all assessories and top of oil.
334Carriage of old scrap material from site to store center.
335Making of 11kv Bus Bar on Power Transformer LT side
336Making of 11kv Bus Bar on Power Transformer LT side
337soil filling with supply of material Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 04474450-eb94-439c-8777-c7aeffcd517c.html Tender Documents 0 KB
Download BOQ_2170538.xls Tender Documents 0 KB
Download tenderfrom22.pdf Tender Documents 0 KB
Download Tendernotice_1 (19).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.