| 1 | Cartage of 8.5 M PCC Pole From ESC/ASK Store Hamirpur or From any other place to the respective site of work through the Kaccha Pacca road including the work of its loading & Unloading at the respective ends also including the cost of labour T&P carrier etc required for proper completion of work. | Cartage of 8.5 M PCC Pole From ESC/ASK Store Hamirpur or From any other place to the respective site of work through the Kaccha Pacca road including the work of its loading & Unloading at the respective ends also including the cost of labour T&P carrier etc required for proper completion of work. |
| 2 | Cartage of Line Material ciz Weasel Conductor, ABC Cable Cross Arm Angle and other place line Material From ESC/ASK Store Hamirpur or any other place to the respective site of work through the Kachha Pacca Road Including the work of its loading & Unloading at the Respective ends including the work of its etc and also including the cost of labour T&P and carrier etc required for | Cartage of Line Material ciz Weasel Conductor, ABC Cable Cross Arm Angle and other place line Material From ESC/ASK Store Hamirpur or any other place to the respective site of work through the Kachha Pacca Road Including the work of its loading & Unloading at the Respective ends including the work of its etc and also including the cost of labour T&P and carrier etc required for |
| 3 | Dismantling of 8.5 M PCC Poles Broken/Damage Following Poles of any other place | Dismantling of 8.5 M PCC Poles Broken/Damage Following Poles of any other place |
| 4 | Erection of 8.5 M PCC Pole Single Support of (Any other Place) Following Poles Including Complete HT/LT Fitting as per RESSPO Manual and as per Direction of Engineer in charge the cost of Labour T&P and Carrier etc required for proper completion of work. | Erection of 8.5 M PCC Pole Single Support of (Any other Place) Following Poles Including Complete HT/LT Fitting as per RESSPO Manual and as per Direction of Engineer in charge the cost of Labour T&P and Carrier etc required for proper completion of work. |
| 5 | Dismantling and Removal of Existing Weasel Conductor From Various area Stacking and Placement their coil and their in the respective JE's (Store) as per direction of Supervising Engineer. It including the work of cartge the cost of Labour T&P Carrier betc requireed for proper completion of work. | Dismantling and Removal of Existing Weasel Conductor From Various area Stacking and Placement their coil and their in the respective JE's (Store) as per direction of Supervising Engineer. It including the work of cartge the cost of Labour T&P Carrier betc requireed for proper completion of work. |
| 6 | Laying, Sagging,Stringing, Binding and Jumpring etc of ACSR Weasel Conductor New/Old on the newly erected pole any other place as per RESSPO Manual and as per Direction of Supervising Engineer. | Laying, Sagging,Stringing, Binding and Jumpring etc of ACSR Weasel Conductor New/Old on the newly erected pole any other place as per RESSPO Manual and as per Direction of Supervising Engineer. |
| 7 | Dismantling and Removal of Existing ABC From Various area Stacking and Placement their coil and their in the respective JE's (Store) as per direction of Supervising Engineer. It including the work of cartge the cost of Labour T&P Carrier betc requireed for proper completion of work. | Dismantling and Removal of Existing ABC From Various area Stacking and Placement their coil and their in the respective JE's (Store) as per direction of Supervising Engineer. It including the work of cartge the cost of Labour T&P Carrier betc requireed for proper completion of work. |
| 8 | Laying, Sagging,Stringing, Binding and Jumpring etc of ABC New/Old on the newly erected pole any other place as per RESSPO Manual and as per Direction of Supervising Engineer. | Laying, Sagging,Stringing, Binding and Jumpring etc of ABC New/Old on the newly erected pole any other place as per RESSPO Manual and as per Direction of Supervising Engineer. |
| 9 | Re-Sagging of Loose Conductor as per director of Supervising Engineering. It includes the cost of Labour T&P Carrier etc required for Proper Compleion of Work. | Re-Sagging of Loose Conductor as per director of Supervising Engineering. It includes the cost of Labour T&P Carrier etc required for Proper Compleion of Work. |
| 10 | Re-Tightening of Stay Complete with nozelling and binding, including cost of Labour T&P etc require for Proper Completion of work. | Re-Tightening of Stay Complete with nozelling and binding, including cost of Labour T&P etc require for Proper Completion of work. |
| 11 | Erection of Stay Set Including the work of nuzze;ing etc as per RESSPO manual. | Erection of Stay Set Including the work of nuzze;ing etc as per RESSPO manual. |
| 12 | Straightening of Tilled 8.5 M Long PCC Pole at various place as per direction of supervising Engineer | Straightening of Tilled 8.5 M Long PCC Pole at various place as per direction of supervising Engineer |
| 13 | Grouting of PCC Poles as per direction of Supervising Engineer. It includes the cost of labour T&P carrier etc required for proper completion of work. | Grouting of PCC Poles as per direction of Supervising Engineer. It includes the cost of labour T&P carrier etc required for proper completion of work. |
| 14 | Tree Chooping of 11 Kv Line near by 11 Kv HT Line & LT Line | Tree Chooping of 11 Kv Line near by 11 Kv HT Line & LT Line |