| 1 | dk;ZA |
| 2 | Safe carriage of the following material from Store Centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km :- 13 Mtr. Long ST Poles. |
| 3 | 11 Mtr. PCC/ST Poles. |
| 4 | 09 Mtr. PCC Poles. |
| 5 | 8.5 Mtr. Long PCC Poles. |
| 6 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 7 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor, various type of conductor etc. |
| 8 | Dismantling/removing of the line/pole by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-ST Poles/Rail pole/gater pole |
| 9 | PCC Poles with all accecories. |
| 10 | M.S Scrape and other line item |
| 11 | Removing /Dismantaling Damaged single pole with all accessories. |
| 12 | Removing /Dismantaling Damaged Double pole with all accessories. |
| 13 | Removing /Dismantaling Damaged Tri/four pole with all accessories. |
| 14 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :- |
| 15 | 9 Mtr. long PCC Poles :- |
| 16 | 11 Mtr. long PCC Poles :- |
| 17 | 09 Mtr. long ST Poles :- |
| 18 | 11 Mtr. long ST Poles :- |
| 19 | 13 Mtr. long ST Poles :- |
| 20 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 21 | 9 Mtr. long PCC Poles :- |
| 22 | 11 Mtr. long PCC Poles :- |
| 23 | 09 Mtr. long ST Poles :- |
| 24 | 11 Mtr. long ST Poles :- |
| 25 | 13 Mtr. long ST Poles :- |
| 26 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc.Tri Pole structure with 9 Mtr. long PCC Poles :- |
| 27 | 11 Mtr. long PCC Poles :- |
| 28 | 09 Mtr. long ST Poles :- |
| 29 | 11 Mtr. long ST Poles :- |
| 30 | 13 Mtr. long ST Poles :- |
| 31 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Four Pole structure with 9 Mtr. long PCC Poles :- :- |
| 32 | 11 Mtr. long PCC Poles :- |
| 33 | 09 Mtr. long ST Poles :- |
| 34 | 11 Mtr. long ST Poles :- |
| 35 | 13 Mtr. long ST Poles :- |
| 36 | Straightening the tilted PCC/ST poles and re-sagging the spans on both sides of the poles. |
| 37 | Mounting and fixing of 10/16 KVA transformer on pole and making proper connections. |
| 38 | Mounting and fixing of 25/63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 39 | Grounting of poles |
| 40 | Resagging of loose electric line |
| 41 | Replacing damaged cross-arms of the electric line in as per RESPO norms. |
| 42 | Welding four angle iron pieces (size 35x35x5 mm, length 3.5 feet) onto the existing corroded/rusted RS joist or round pole. Following the welding, constructing a 3-foot-high plinth around the pole using a cement, sand, and brick ballast mix in a 1:4:8 ratio. |
| 43 | Mounting and fixing 11 K.V Stay Set |
| 44 | Mounting and fixing 33 K.V Stay Set |
| 45 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 46 | Mounting and fixing 33 K.V Pin/Disk insulator. |
| 47 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel Conductor. |
| 48 | Sagging ACSR Rabbit Conductor. |
| 49 | Sagging ACSR Dog Conductor. |
| 50 | Sagging LT AB Cable (1×25+1×16)sq.mm |
| 51 | Sagging LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 52 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 53 | Sagging LT AB Cable (3×120+1×95+1×16) sq.mm |
| 54 | Cutting or trimming trees that have fallen onto power lines. |
| 55 | Work involving trench excavation to locate the fault, filling the 11 kV cable box, laying XLPE cable, and properly backfilling the trench. |
| 56 | Work involving trench excavation to locate the fault, filling the 33 kV cable box, laying XLPE cable, and properly backfilling the trench. |
| 57 | Filling of various type 33/11 kv cable jointing kit. |
| 58 | Replacing the lugs of 25/63/100 kVA transformers. |
| 59 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 60 | Grounting material for pole and stay |
| 61 | Various type of clamps |
| 62 | F-bracket for 11 kV line |
| 63 | F-bracket for 33 kV line |
| 64 | E Bracket with bolts & nuts |
| 65 | Al. long leg Barrel, off-size |
| 66 | Nut and Bolts Please Enable Macros to View BoQ information |