|
| 1 | The work of safe carriage of following materials from the Electricty store centre CB Ganj, Bareilly to the working site including loading and unloading at both ends. (distance 0 to 50 km) |
| 2 | STP POLE 13 Mtr. Long |
| 3 | STP POLE 11 Mtr. Long |
| 4 | PCC POLE 11 Mtr. Long |
| 5 | PCC POLE 9 Mtr. Long |
| 6 | ACSR Dog Conductor |
| 7 | ACSR Panther Conductor |
| 8 | 33 KV Cross Arm |
| 9 | 33 KV Pin Insulator with Pin |
| 10 | 33 KV Disc Insulator |
| 11 | 33 KV Disc Fitting |
| 12 | Stay Set Complete |
| 13 | Top Channel for 33 KV |
| 14 | T-off Channel for 33 KV |
| 15 | 33 KV XLPE Cable 3X300 Sqmm |
| 16 | 11 KV XLPE Cable 3X185 Sqmm |
| 17 | 11 KV XLPE Cable 3X120 Sqmm |
| 18 | Complete work of installation/replacement of the material received from Electricty store centre CB Ganj, Bareilly at the working sites as per RESPO Norms . |
| 19 | Work of installation/replacement of Single STP Pole ( 13 meter) with proper grouting upto depth of one sixth of length of pole and mounting of all accessories like pin/disc insulator, angle channel, cross arm etc.as per RESPO standards and decentralized material shall be provided by the Contractor/Firm. |
| 20 | Work of installation/replacement of Single STP Pole ( 11 meter) with proper grouting upto depth of one sixth of length of pole and mounting of all accessories like pin/disc insulator, angle channel, cross arm etc.as per RESPO standards and decentralized material shall be provided by the Contractor/Firm. |
| 21 | Work of installation/replacement of Single PCC Pole ( 11 meter) with proper grouting upto depth of one sixth of length of pole and mounting of all accessories like pin/disc insulator, angle channel, cross arm etc.as per RESPO standards and decentralized material shall be provided by the Contractor/Firm. |
| 22 | Work of installation/replacement of Single PCC Pole (9 meter) with proper grouting upto depth of one sixth of length of pole and mounting of all accessories like pin/disc insulator, angle channel, cross arm etc.as per RESPO standards and decentralized material shall be provided by the Contractor/Firm. |
| 23 | Complete work of Laying/Installing /Stringing of ACSR DOG CONDUCTOR on the installed electric poles as per RESPO norms. |
| 24 | Complete work of Laying/Installing /Stringing of ACSR PANTHAR CONDUCTOR on the installed electric poles as per RESPO norms. |
| 25 | Complete work of Laying/Installing /Stringing the 33 KV XLPE Cable (3X300 SQMM) as per RESPO norms. |
| 26 | Complete work of Laying/Installing /Stringing the 11 KV XLPE Cable(3X185 SQMM) as per RESPO norms. |
| 27 | Complete work of Laying/Installing /Stringing the 11 KV XLPE Cable(3X120 SQMM) as per RESPO norms. |
| 28 | Complete work of Re-sagging / Tightening the loose Line of Dog Conductor upto proper height on the installed electric poles as per RESPO norms. |
| 29 | Complete work of Re-sagging / Tightening the loose Line of Panther Conductor upto proper height on the installed electric poles as per RESPO norms. |
| 30 | Installation/replacement of 33 KV Cross Arm as per RESPO Norms. |
| 31 | Installation/replacement of 33 KV Pin Insulators with Pin as per RESPO Norms. |
| 32 | Installation/replacement of 33 KV Disc Insulator as per RESPO Norms . |
| 33 | Installation/replacement of 33 KV Disc Fitting as per RESPO Norms . |
| 34 | Installation/replacement of Top Channel for 33 KV as per RESPO Norms . |
| 35 | Installation/replacement of T-off Channel for 33 KV as per RESPO Norms . |
| 36 | Complete work of installation of Stay Set Complete with concreting on installed Double / Single Pole of Line as per the RESPO standards. |
| 37 | Complete work of cutting/ pruning/ trimming of the branches of trees for making proper gap between the 33 KV Lines and trees. |
| 38 | Work of Straightening of tilted ST Poles and Work of repairing of damaged ST Pole (9/11/13 Meter ) at the bottom by providing Fixing 03 nos. angle pieces of size 50x50x6 mm of 75 cm alongwith Grouting with Plinth of ST Poles with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/BB & sand required as per RESPO norms. |
| 39 | Chemical Earthing of T/F as per RESPO Norms.( All material shall be provided by the contractor at his own cost) |
| 40 | Water level earthing of T/F Body & neutral with GI Pipe of 1.5\\" Dia. Upto 60 feet depth including G.I strip size 50x6 mm. as per RESPO Norms. (Material shall be provided by Contractor). |
| 41 | Supply & Fixing of Following Materials. |
| 42 | Supply & Fixing of Holding Clamps for all Sizes . |
| 43 | Supply & Fixing of Copper Tinned Fuse Wire of size 12 SWG Appropriate Size |
| 44 | Supply & Fixing of Copper Tinned Fuse Wire of size 16 SWG Appropriate Size |
| 45 | Supply & Fixing of NUT & BOLT as per RESPO standards |
| 46 | Supply & Fixing of F-CLAMP as per RESPO standards |
| 47 | Supply & Fixing of PG Clamps suitable for Dog Conductor |
| 48 | Supply & Fixing of PG Clamps suitable for Panther Conductor |
| 49 | Safe carriage of old & used/ damaged material from working sites to Electricity store centre, Bareilly including loading and unloading at both ends. |
| 50 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) OLD & USED/Damage |
| 51 | STP OLD & USED / Damage |
| 52 | Installation/ replacement of defective 33 KV CT, 33 KV PT, 11 KV CT & 11 KV PT at 33/11 KV substations with proper wiring and testing including safe carriage of new CT, PT from Electricity store centre CB Ganj, Bareilly to 33/11 KV substations. |
| 53 | Installation/ replacement of defective 33 KV CT, 33 KV PT, 11 KV CT & 11 KV PT at 33/11 KV substations with proper wiring and testing including safe carriage of new CT, PT from Electricity store centre CB Ganj, Bareilly to 33/11 KV substations and carriage of old and damaged CT, PT from 33/11 KV substations to Electricity store centre CB Ganj, Bareilly including loading and unloading at both ends. |
| 54 | The Quantity of any item of work may very from 0 to maximum number within the value of tender. Please Enable Macros to View BoQ information |