| 1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | PCC POLE 11 Mtr. Long |
| 3 | STP POLE 09 Mtr. Long |
| 4 | PCC POLE 8.5 Mtr. Long |
| 5 | ACSR Weasel Conductor |
| 6 | ACSR Rabbit Conductor |
| 7 | ACSR Raccoon Conductor |
| 8 | A.B Cable (3X120 sqmm) |
| 9 | A.B Cable (3X95 sqmm) |
| 10 | A.B Cable (3X50 sqmm) |
| 11 | 11 KV Cross Arm |
| 12 | 11 KV Pin Insulator with Pin |
| 13 | 11 KV Disc Insulator |
| 14 | 11 KV Disc Fitting |
| 15 | Stay Set Complete |
| 16 | Top Channel for 11 KV |
| 17 | guarding Angle for 11 KV |
| 18 | T-off Channel for 11 KV |
| 19 | G.I Wire |
| 20 | LT Distribution Box (03 Phase) |
| 21 | Complete work of installing the electrical material received from the store center at the sites as per RESPO Norms. |
| 22 | Work of Fixing/Installing Single Pole of the PCC Pole (8.5 meter) installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 23 | Work of Fixing/Installing Double Pole of the PCC Pole (11 meter) installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 24 | Work of Fixing/Installing Single Pole of the STP Pole(9/ Meter) installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 25 | Complete work of Laying/Installing /Stringing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. |
| 26 | Complete work of Laying/Installing /Stringing ACSR Rebit CONDUCTOR on the established electric poles installed as per RESPO norms. |
| 27 | Complete work of Laying/Installing /Stringing ACSR Raccoon CONDUCTOR on the established electric poles installed as per RESPO norms. |
| 28 | Stringing & Sagging of AB Cable (3x120) Sqmm. As per RESPO Norms . |
| 29 | Stringing & Sagging of AB Cable (3x95) Sqmm. As per RESPO Norms . |
| 30 | Stringing & Sagging of AB Cable (3x50) Sqmm. As per RESPO Norms . |
| 31 | Complete work of Re-sagging / Tightening the loose Line & Re-Height the Weasel/Rabit/ Racoon Conductor Line at the site on the established electric poles installed as per RESPO norms. |
| 32 | Fixing of 11 KV Cross Arm as per RESO Norms . |
| 33 | Fixing of 11 KV Pin Insulator with Pin as per RESO Norms . |
| 34 | Fixing of 11 KV Disc Insulator as per RESO Norms . |
| 35 | Fixing of 11 KV Disc Fitting as per RESO Norms . |
| 36 | Fixing of T-off Channel for 11 KV as per RESO Norms . |
| 37 | Fixing of Top Channel for 11 KV |
| 38 | Complete work of installation of Stay Set Complete with concreting on Established Double pole & Single Pole of Line As per the RESPO standards. |
| 39 | Complete work of cutting and pruning the branches of trees standing between the LT LINE / 11 KV Line/D.T/ ,D/POLE installed and shifting place/route. |
| 40 | Guarding work of 11 KV Lines including work mounting of Guarding angle and stringing of Guarding wire after binding of string, complete in all respect alongwith providing and fixing of Eye Bolts . |
| 41 | Work of Straightening of tilted ST Poles and Work of repairing of damaged ST Pole(9/11/13 Meter ) at the bottom by providing Fixing 03 nos. angel pieces of size 50x506mm of 75 C.M. alongwith Grouting with Plinth of ST Poles with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/BB & sand required as per RESPO norms. |
| 42 | Chemical Earthing of Distribution T/F as per RESPO Norms.( All material will be arranged by the contractor at his own cost) |
| 43 | Installation of LT Distribution Box (03 Phase) along with making all connections as per RESPO Norms. |
| 44 | Supply & Fixing of Following Materials. |
| 45 | AL Lug ( 240 mm2 cable). |
| 46 | AL Lug ( 400 mm2 cable). |
| 47 | AL Lug ( 630 mm2 cable). |
| 48 | Copper Tinned Fuse Wire of Appropriate Size |
| 49 | For the work of find the location and pin pointing of 11 KV Cable fault in 11 KV cable .( Cable Fault Locator equipment mounted on a vehicle will be arrange by the agency). |
| 50 | The work of digging trench ( as required as per site) replacement of existing damaged 11 kv C/J Kit straight through type for restore supply following as under 11 KV vertical Bareilly.(Suitable CJ Kit straight through type will be provided by the Department) alongwith back filling of Trench . |
| 51 | The Quantity of any item of work may very from 0 to maximum number within the value of tender. Please Enable Macros to View BoQ information |