| 1 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing). |
| 2 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 3 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 4 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 5 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 6 | Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for aheight of 1.5m from ground level using approved quality primer one coatand two coats anti algal black and fluorescent white paint in alternaterings of 25cm width including cost of paints. |
| 7 | Pole numbering using printed Aluminium sheets of 22 SWG having size20 x 12 cm or Painting the surface of line supports where numbers are tobe inscribed, Pole numbers shall be painted in circular / rectangularbackground, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre aboveground level. The number and letters should be in black synthetic enamelpaint. The size of the number should be at least 2cm in height x 1.5cm inwidth. including cost of paint. |
| 8 | Fitting one set AB switch on existing DP, giving connection and drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing. |
| 9 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), inexisting 11kV DP including conveyance of materials. |
| 10 | Drilling hole of various sizes on existing Channel/Cross Arm |
| 11 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at standard distance(1.5m) away from the pole/structure in ordinary soil & backfilling the pitwith 15cm alternate layer of charcoal, salt and sand up to 90cm from thebottom. including the cost of 20kg salt, 25kg charcoal, excluding supplyof earth pipe. |
| 12 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 13 | Fitting and erecting one HT Double Pole Structure using A type pole inposition including fitting 2 No. channel cross arm, digging and backfilling pit in ordinary soil, drawing sufficient length of GI earthing leadsthrough all cross arms to the ground for earthing (excluding provision ofearthing). |
| 14 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 15 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling. |
| 16 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), inexisting 11kV DP including conveyance of materials. |
| 17 | Fitting and providing one HT Fly stay for 11kV pole using A type poleincluding digging and back filling pits in ordinary soil, drawing sufficientlength of GI earth leads to the ground for earthing (excluding provision ofearthing). |
| 18 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 19 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmmwith bare/insulated Messenger through existing poles |
| 20 | Transporting LT ABC by hired vehicle to a distance up to 5 km andcarring up to 2 drum including loading and un loading using crane |
| 21 | Fitting and providing one Strut using A type pole, including digging andback filling pit in ordinary soil. |
| 22 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 23 | Fiting One no MVT on existing cross arm including 2 nos endtermination (for One phase) of any rating for 11 kV AB Cable |
| 24 | Erection of suspension clamp for 11KV ABC of any size |
| 25 | Fiting One No MVT on existing cross arm excluding termination work(for One phase) of any rating for 11 kV AB Cable |
| 26 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentallyincluding charges for cable jointer etc. complete as per the direction of thedepartmental officers. |
| 27 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. Please Enable Macros to View BoQ information |