| 1 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 2 | Fitting and erecting A type Pole without using cross arm, insulators,and Fclamp for stringing ABCable |
| 3 | Fitting and erecting 9 Meter PSC Pole without using V cross arm,insulators and F clamp for stringing ABCable |
| 4 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 5 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 6 | Fitting one set AB switch on existing DP, giving connection and drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing. |
| 7 | Drilling hole of various sizes on existing Channel/Cross Arm |
| 8 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling. |
| 9 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 10 | Erection of suspension clamp for 11KV ABC of any size |
| 11 | Fiting One No MVT on existing cross arm excluding termination work(for One phase) of any rating for 11 kV AB Cable |
| 12 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentallyincluding charges for cable jointer etc. complete as per the direction of thedepartmental officers. |
| 13 | Providing Cable Tie |
| 14 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 15 | Fitting and erecting one HT Double Pole Structure using A type pole inposition including fitting 2 No. channel cross arm, digging and backfilling pit in ordinary soil, drawing sufficient length of GI earthing leadsthrough all cross arms to the ground for earthing (excluding provision ofearthing). |
| 16 | Fitting and erecting one HT Double Pole Structure using PSC pole inposition including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads throughall cross arms to the ground for earthing (excluding provision of earthing). |
| 17 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), inexisting 11kV DP including conveyance of materials. |
| 18 | Fitting and providing one HT Fly stay for 11kV pole using A type poleincluding digging and back filling pits in ordinary soil, drawing sufficientlength of GI earth leads to the ground for earthing (excluding provision ofearthing).. |
| 19 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 20 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmmwith bare/insulated Messenger through existing poles |
| 21 | Mounting and connecting HT XLPE UG cable ends of all sizes upto andincluding 3x300 sq mm with special type cable clamps, bolts, nuts,terminal protectors etc.including cost of extra materials if needed andgiving necessary jumper connections. |
| 22 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185sqmm and upto and including 3x300 sq mm using the cable jointing kitsupplied departmentally as per specification after providing proper trafficsignalling and caution board fencing etc. wherever necessary, includingcharges for cable jointer and other sundries etc. as per the direction ofdepartmental officers at site. |
| 23 | Doing one cable end termination on HT XLPE UG cables of sizes beyond3x185 sqmm and upto and including 3x300 sq mm using the cablejointing kit supplied departmentally after making fencing,caution boardand all other safety measures including charges for cable jointer etc.complete as per the direction of the departmental officers. |
| 24 | Charges for HDD including survey of site information collectionregarding underground Utilities, survey of utilities, pit marking,pilotdrilling Pre-reaming pulling 110 mm dia HDPE pipe ( includes cost ofHDPE pipe, temporary restoration charges for HDD pit with 1:3:6 CCetc.) |
| 25 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto andincluding 3x300 sqmm including conveying cable from Sub RegionalStore/stacking place to work site and laying it carefully using cablerollers, taking through stone ware/G.I.pipes at roadcrossing/culverts/bridges etc. whereever necessary, providingidentification tags at 5m intervals, filling the space around the cable withriddled soil and covering the top with bricks, providing cable routemarkers at 100m intervals, inclusive of cost of all materials (other thancost of GI/HDPE pipe & UG Cable), labour and transport including cranecharges excluding excavation and backfilling |
| 26 | Transporting LT ABC by hired vehicle to a distance up to 5 km andcarring up to 2 drum including loading and un loading using crane |
| 27 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. |
| 28 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. Please Enable Macros to View BoQ information |