| 1 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 2 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 3 | Renewal of existing damaged/broken old 11kV Stay to the existing stayrod. |
| 4 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmmwith bare/insulated Messenger through existing poles |
| 5 | Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the sameafter completing the line work.. |
| 6 | Disconnecting and lowering down the three phase WP service connectionwith guy wire from the OH line and reconnecting the same aftercompleting the line work |
| 7 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 8 | Fiting One No MVT on existing cross arm excluding termination work(for One phase) of any rating for 11 kV AB Cable |
| 9 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of thedepartmental officers. |
| 10 | Fiting One no MVT on existing cross arm including 2 nos endtermination (for One phase) of any rating for 11 kV AB Cable |
| 11 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at standard distance(1.5m) away from the pole/structure in ordinary soil & backfilling the pitwith 15cm alternate layer of charcoal, salt and sand up to 90cm from thebottom. including the cost of 20kg salt, 25kg charcoal, excluding supplyof earth pipe. |
| 12 | Erection of suspension clamp for 11KV ABC of any size |
| 13 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 14 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing). |
| 15 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 16 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 17 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 18 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. attached thereon and stacking the same. |
| 19 | Dismantling (without damage) LT stay including digging pit in all classesof soil and backfilling. |
| 20 | Transferring of HT Branch lines to newly erected poles |
| 21 | Transfering LT Three Phase 4/5 wire OH Line to newly erected HT/LTPole including dismantled existing crossarm and insulators, refitting thesame on new Pole, binding etc complete |
| 22 | Fitting one set AB switch on existing DP, giving connection and drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing. |
| 23 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 24 | Fitting and erecting one HT Double Pole Structure using A type pole inposition including fitting 2 No. channel cross arm, digging and backfilling pit in ordinary soil, drawing sufficient length of GI earthing leadsthrough all cross arms to the ground for earthing (excluding provision ofearthing). |
| 25 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. Please Enable Macros to View BoQ information |