| 1 | Fitting one set AB switch on existing DP, giving connection and drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing. |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), inexisting 11kV DP including conveyance of materials. |
| 3 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 4 | Additional rate for providing one disc set, PG clamp etc. complete, on anytype of HT pole for making cut point. |
| 5 | Fitting and erecting one HT Double Pole Structure using PSC pole inposition including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads throughall cross arms to the ground for earthing (excluding provision of earthing). |
| 6 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling. |
| 7 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 8 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 9 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmmwith bare/insulated Messenger through existing poles |
| 10 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 11 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC poleincluding digging and back filling pits in ordinary soil, drawing sufficientlength of GI earth leads to the ground for earthing (excluding provision ofearthing). |
| 12 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite |
| 13 | Additional rate for excavation of one Pit for HT Pole/HT Stay in SoftRock. |
| 14 | Additional rate for providing one F top bracket complete, on any type ofHT pole. |
| 15 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 16 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 17 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 18 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. attached thereon and stacking the same. |
| 19 | Dismantling (without damage) one km LT single phase 2 wire OH lineconductor by dismantling cross arms, insulators and stacking theconductors in rolls properly. |
| 20 | Dismantling one section fuse from structure and bringing back to sectionstore. |
| 21 | Dismantling (without damage) one km LT three phase 4 wire OH lineconductor by dismantling cross arms, insulators and stacking theconductors in rolls properly. |
| 22 | Providing WP support with PSC pole including digging & back filling pitin ordinary soil. excluding transportation of poles. |
| 23 | Additional rate for refitting/redoing one Shackle Set, including reshaclingone span, while renewing any type of LT pole. |
| 24 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 25 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 26 | Stringing, shackling, fitting cross arms, insulators and binding, givingjumper connection etc. using ACSR Rabbit for Phase and ACSR Weaselfor Neutral, for one km LT three phase 4 wire line including cutting andremoving tree branches wherever necessary and conveyance of allmaterials (except poles) from stacking place. |
| 27 | Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt & nut etc. |
| 28 | Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for aheight of 1.5m from ground level using approved quality primer one coatand two coats anti algal black and fluorescent white paint in alternaterings of 25cm width including cost of paints. |
| 29 | Pole numbering using printed Aluminium sheets of 22 SWG having size20 x 12 cm or Painting the surface of line supports where numbers are tobe inscribed, Pole numbers shall be painted in circular / rectangularbackground, using approved quality anti algal yellow paint in two coatafter scraping and cleaning the surface at a height of 2.5 metre aboveground level. The number and letters should be in black synthetic enamelpaint. The size of the number should be at least 2cm in height x 1.5cm inwidth. including cost of paint. |
| 30 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 31 | Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the sameafter completing the line work. |
| 32 | Disconnecting and lowering down the three phase WP service connectionwith guy wire from the OH line and reconnecting the same aftercompleting the line work. |
| 33 | Fitting and erecting 9M PSC pole with out V cross arm,pin insulator and fclamp for AB Cable stringing |
| 34 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. |
| 35 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 36 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentallyincluding charges for cable jointer etc. complete as per the direction of thedepartmental officers |
| 37 | Fiting One No MVT on existing cross arm excluding termination work(for One phase) of any rating for 11 kV AB Cable |
| 38 | Providing Cable Tie |
| 39 | Erection of suspension clamp for 11KV ABC of any size. |
| 40 | Fiting One no MVT on existing cross arm including 2 nos endtermination (for One phase) of any rating for 11 kV AB Cable Please Enable Macros to View BoQ information |