| Sl. No. | Item Description |
| 1 | GST rate/ amount, SAC & Total amount incl. GST |
| 2 | PE PIPELINE |
| 3 | Pipe laying on any unprepared surface (Katcha surface) / normal surface / hard surface (all types of hard rock) using open cut / moling - (without casing) methodology |
| 4 | Receipt, loading, unloading, storing, reloading, transportation, uncoiling, stringing, and laying of PE100, SDR11/17.6 line pipes of all sizes, including proper stacking, identification, and supply of accessories of all sizes and thickness like PE bends, saddles, couplers, end caps, tees (equal/reducing), reducers, CS/GI to PE fittings (i.e., transition fittings of sizes 20 mm to 32 mm), warning mat (300 mm width as per attached technical specification and QAP), etc. Handling, stringing/uncoiling, aligning of the PE line pipe on the pipeline right-of-use/route, laying/installation of PE line pipe along with required accessories as mentioned above as per specification wherever required depending on site conditions, including execution of all associated works; storage of material in contractor's store in a safe manner, prefabrication/fabrication, access for prefabrication/fabrication area, all procured/supplied materials for construction, consumables, equipment, labor, and other inputs. In the case of free issue items, the scope also includes receiving and loading from owner’s designated store within GA, transportation, unloading, and stacking of free issue items at contractor's store. |
| 5 | Carrying out all temporary, ancillary, and auxiliary works required to make the laid PE pipeline system complete and ready for commissioning as per drawings, specifications, and as per the direction of Engineer-In-Charge (EIC). |
| 6 | Specifications, scope of work indicated in PJS and other provisions of the contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works |
| 7 | Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review/approval. |
| 8 | Carrying out preliminary & final survey activities for crossings encountered in the pipeline route and preparation of drawings with crossing methodology, etc., wherever required, and submission to Owner/Engineer-in-charge for review/approval. |
| 9 | Preparation and getting approval of execution schedules, execution procedures, drawings/sketches wherever required from Owner/Engineer-in-charge and/or from concerned authority, making trial pits to determine the underground utilities/services, etc., restoration of the abandoned trial pits to original condition to the entire satisfaction of Owner/Engineer-in-charge and/or concerned authority. |
| 10 | Stacking and installation of construction markers, clearing/grading of work area, fencing, grubbing, cutting of trees, etc. within work area and fulfilling all the requirements of various statutory/environment authorities to their entire satisfaction. |
| 11 | Barricading the work area as per local authorities' guidelines/norms and to the entire satisfaction of Owner/Engineer-in-charge, installation of safety signs to the satisfaction of Owner/Engineer-in-charge and/or as per local authorities' guidelines/norms. |
| 12 | Barricading the pipeline construction area prior to execution of the works as per drawing no. BR-CGD-STD-DWG-11 & BR-CGD-STD-DWG-10 enclosed with the tender document and to the entire satisfaction of the owner/engineer-in-charge. |
| 13 | Laying using open trench without casing/Moiling without casing includes survey of underground utilities (through trial pits), execution of work as per specification including trenching to all depths by excavation in all types of soils including soft/rocky strata and different types of pavement/footpath/roads, etc., including rock breaking, chiseling or otherwise cutting, as required and storing excavated soil and reusable materials at designated areas as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard specification. The minimum depth of the top of the pipeline shall be 1.0 m measured from the top of the pipeline to the top of the undisturbed surface of the soil or as per Specification/OISD-226 & PNGRB latest guidelines, whichever is higher. Repairing of all damaged utilities, if any, and payment of any compensation (if claimed by owner/other utility agencies). |
| 14 | Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends/fittings/valves by qualified personnel using approved electro-fusion techniques as per specification. |
| 15 | Installation/lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HOPE Yellow color warning mat (300 mm width as per attached Technical specification and QAP) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth/borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific areas of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles/slabs/curb stones etc. removed during excavation shall be placed packed properly and no separate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner/concerned authorities. |
| 16 | The scope of work against this item also includes Electro-fusion jointing of valves, fittings, saddle, etc., wherever required and as directed by the Engineer in-charge. |
| 17 | The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedestal of grade (1:2.4) and size (8\\" depth x 6\\" length x 4\\" width), which may slightly vary in dimension and volumetric quantities of PCC and may increase up to 25% more as per site requirement, supply and installation of GI Sleeve (Heavy C-Class as per IS-1239), supply & filling of sand, and installation of TF (along with supply). |
| 18 | Flushing, Pneumatic testing, purging with nitrogen, and commissioning as per specification and approved procedures, providing all tools and tackles, nitrogen, instruments, manpower, and other related accessories, and as per the instructions of the Engineer-in-Charge. |
| 19 | Final clean-up of right-of-way or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas within GA, and backfilling of trench and compaction of the same to the satisfaction of Owner and/or as deemed by Engineer-in-charge. |
| 20 | Maintaining the worthiness of the complete pipeline system along with associated facilities until handover to the OWNER/ETC and to carry out rectification/replacement works for any defects or failures reported by OWNER during defect liability period. |
| 21 | Handing over the completed works to Owner for their operation/use, reconciliation of materials area-wise, and obtaining \\"no objection certificate\\" from Owner/PMC. |
| 22 | Preparation and submission of daily progress reports, laying graphs/PE line cards on a daily basis, and getting them reviewed/inspected by the Owner/Owner representative/PMC. |
| 23 | On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs, and deviation statements. |
| 24 | In case the minimum required depth is not possible due to site conditions, necessary mitigation measures shall be required to be taken by the contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. |
| 25 | Submission of all documents required for contract closure as mentioned in the contract document, as per guidelines of the Owner/PMC. |
| 26 | Any other activities not mentioned/covered explicitly above, but otherwise required for satisfactory completion/operation/safety/statutory/maintenance of the works shall also be covered under the scope of work and have to be completed by the Contractor within the specified time schedule at no extra cost to Owner. All the work shall be executed in accordance with the provisions of the contract and/or latest guidelines of the statutory authority, whichever is stringent. |
| 27 | 20/32 mm PE 100 pipe Service line laying upto 4 Mtr. length -(On Charged/ pressurised line)/Online GC (Applicable For already charged line/pressurized) |
| 28 | 20/32 mm PE100 Pipe Service Line Laying up to 4 m Length – On Charged/Pressurised Line (Online GC)This item covers laying of a 20/32 mm PE100 service connection pipe up to 4 metres in length on an already charged/pressurised gas distribution line through online gas connection (GC) work, without interrupting gas supply.This line item is specifically applicable in locations where: Soil conditions are loose/sandy and require shoring or shuttering support to prevent trench collapse and Groundwater level is high, requiring continuous dewatering pump operation during excavation and pipe laying activities. |
| 29 | Laying of 20 mm PE 100 pipe by Open Cut Method/Moiling without casing, including ground connectivity (GC)/service line connections to all customers en route. The scope includes works such as making PCC pedestal of grade 1:2:4 and size 8\\" × 6\\" × 4\\", supply and installation of GI sleeve [Heavy (Class-C) as per IS:1239], filling of sand, and supply and installation of TF, complete in all respects.Note: Flushing, testing, and commissioning of 20 mm and 32 mm pipelines shall be carried out together. |
| 30 | 32 mm PE 100 pipe by Open Cut Method/ Moiling without casing Method as per standard. (Laying of 32mm shall accompany service line/GC with 20mm to the customers en route).Note: Flushing, Testing, commissioning of 32mm and 20mm shall be done together. |
| 31 | Laying of MDPE Pipelines - HDD Method without Casing : All equipment(fusion machine etc.), material & manpower(Jointer etc.) will be in contractor scope,MDPE pipe as FIM.All fittings are in Contractor scope.Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11/17.6 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. |
| 32 | 32 mm PE 100 pipe by HDD Method without casing (Laying of 32mm shall accompany service line/GC with 20mm to the customers en route).Note: (1) Flushing, Testing, commissioning of 32mm and 20mm shall be done together. |
| 33 | 63 mm PE 100 pipe by HDD Method without casing (Laying of 32mm shall accompany service line/GC with 20mm to the customers en route).Note: (1) Flushing, Testing, commissioning of 32mm and 20mm shall be done together. |
| 34 | 90 mm PE 100 pipe by HDD Method without casing (Laying of 32mm shall accompany service line/GC with 20mm to the customers en route).Note: (1) Flushing, Testing, commissioning of 32mm and 20mm shall be done together. |
| 35 | 125 mm PE 100 pipe by HDD Method without casing (Laying of 32mm shall accompany service line/GC with 20mm to the customers en route).Note: (1) Flushing, Testing, commissioning of 32mm and 20mm shall be done together. |
| 36 | Laying of Two different dia PE pipes in the same trench by HDD method - Drawing with respect to the same shall be referrred - 90mm + 32mm |
| 37 | Laying of Two different dia PE pipes in the same trench by HDD method - Drawing with respect to the same shall be referrred - 63mm + 32mm |
| 38 | Note:i) The lengths of pipelines are tentative. It may increase or decrease as per site requirement or as per instruction of EIC.II) For restoration of asphalt or concrete roads, the item for construction of asphalt, concrete top, red stone waver, RCC, or PCC shall be paid separately as per the rates quoted for the same elsewhere in the SOR.III) The scope of work will start from tapping saddle/Tee on existing/laid PE pipe of various sizes of existing network to Transition Fitting (PE to GI). The tapping saddle/Tee, Transition fittings, and other fittings shall be included in the measurement under relevant SOR.IV) Bidders have to familiarize themselves with the entire locations/region/charge area within the GA and ascertain all types of eventuality/uncertainty before quoting their bid. |
| 39 | Pipe Laying in any unprepared surface (Katcha surface) / Normal Surface / Hard surface (all types of hard rock) using open cut with casing Moling with Casing methodology. |
| 40 | Laying of all PE pipe (PE 100 SDR11), including supply of HDPE casing pipe, Saddle, Couplers, End caps, etc. (As per particular job specification). |
| 41 | Survey of underground utilities, execution of the work as per specification, including excavation of pits, moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning, and restoration of the pits to original condition, submission of As-Built Graphs as per specifications and the instructions of Engineer-In-Charge. |
| 42 | 20 mm PE 100 pipe (in 50 mm dia. HDPE Casing Pipe) by open cut Method with casing |
| 43 | 20 mm PE 100 pipe (in 50 mm dla. HDPE Casing Pipe ) by Moiling Method with casing |
| 44 | 32 mm PE 100 pipe (in 75 mm dia. HDPE Casing Pipe )by open cut Method wtth casing |
| 45 | 32 mm PE 100 plpa {in 75 mm dia. HDPE Casing Pipe )by Moling Method with casing |
| 46 | Flushing,Testing & Commissioning of MDPE line with all tools,Machines,Manpower are in contractor scope:Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge. (Lines already laid by other/previous contractor)-Note* |
| 47 | 20 mm PE 100 MDPE Pipeline |
| 48 | 32 mm PE 100 MDPE Pipeline |
| 49 | 63 mm PE 100 MDPE Pipeline |
| 50 | 90 mm PE 100 MDPE Pipeline |
| 51 | 125 mm PE 100 MDPE Pipeline |
| 52 | Note: Under SOR Item Nos. A00200 to A00205, the old MDPE line laid by another contractor but not yet charged shall be flushed, tested, commissioned, and any leakage detected shall be repaired with the necessary supply of all required fittings, excluding pipes, and handed over as per the instructions and satisfaction of the EIC/Owner. |
| 53 | Civil Work/Cutting/Breaking and Restoration |
| 54 | Restoration of the roads, pavements, channels, footpaths, tiles, slabs, etc. to original condition including supply of the approved quality material required, as per local authorities' norms, obtaining NOC from landowners/third-party inspection agencies/Consultant designated by GAIL and to the satisfaction of Engineer-In-charge. |
| 55 | Breaking/Cutting of Cement Concrete upto 10 inch depth- Making provision for PE Pipe laying as per site requirement and as per instruction of EIC. |
| 56 | Breaking/Cutting of Cement Concrete above 10 inch depth- Making provision for PE Pipe laying as per site requirement and as per instruction of EIC. |
| 57 | Cement Concrete Restoration as per scope of work (Excluding Breaking/Cutting). |
| 58 | Breaking/Cutting of RCC Core - Making provision for PE Pipe laying as per site requirement and as per instruction of EIC. |
| 59 | RCC restoration as per scope of work (Excluding Breaking/Cutting). |
| 60 | Tiles/ Paver/ Blocks/ Curb Stones,Red sand stone |
| 61 | Brick Soling/ Stone Soling, etc |
| 62 | Chauka/Red Sand Stone/ Patiya/ Curb Stone |
| 63 | Asphalt/BituminousRestoration of bitumen Asphalt road after laying of pipe line as per the specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done as per requirement of RMC/MCD/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA and to get NOC from the concerned authorities. Restoration of the asphalt road cut portion for pipeline trench width shall be carried out by filling the bottom layer with good earth/Soil filling followed by 225mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. DBM & 40mm thk. BC matching with the existing road top level. This item also includes disposal of surplus soil /debris with all lift & leads, cutting of Top layer of asphalt road by mechanized saw/cutters for maintaining straight line. |
| 64 | Valve Pit Chamber (RCC)Constructing valve pit chamber in RCC of grade M-25 over 75 mm thick leveling course in 1:4:8 mix including 16 mm thick plastering with cement mortar 1:3 (1 cement : 5 coarse sand) and PCC pedestal for Valve support (if required) complete as per specification, drawings, and direction of EIC. Valve Pit Chamber shall be covered with 150 mm thick RCC top slab of M-25 grade with manhole cover (medium duty) along with frame as per IS 1726. Rate to include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 45 grade cement, reinforcement, CI manhole cover, PVC coated rungs, inserts including excavation and backfilling, masonry works, plastering, etc., with all bye works and sundry works. |
| 65 | Type I : Inside size 1000 mm x 1000 mm |
| 66 | Type I : Inside size 600 mm x 600 mm and upto 1500 mm deep |
| 67 | Installation of valve in pit including supply of valves: Supply of isolation valves (as per data sheet) and installation of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR. |
| 68 | PE Valve 32 mm dia |
| 69 | PE Valve 63 mm dia |
| 70 | PE Valve 90 mm dia |
| 71 | PE Valve 125mm dia |
| 72 | Fabrication & Installation of Markers |
| 73 | RCC Route Markers |
| 74 | Supply, fabrication, and installation of RCC route markers including application of approved color and quality of primer and paint as per the standard drawing, along the route including all associated civil works such as excavation and construction in all types of soils, construction of pedestals, and grouting with concrete. These works shall be carried out as per installation methodology approved by EIC based on site requirements. |
| 75 | Steel Pole Markers with Foundation |
| 76 | Supply, fabrication, and installation of Steel Pole markers, including application of approved color and quality of primer and paint as per the standard drawings, along with all associated civil works such as excavation and construction in all types of soils, construction of pedestals, and grouting with concrete, cleaning, stench letter cutting of lettering, numbers, direction, etc. These works shall be carried out as per installation methodology approved by EIC based on site requirements. |
| 77 | Warning Plate Markers |
| 78 | Supply, fabrication, and installation of plate markers including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the standard drawings to be installed near the regulator. These works shall be carried out as per installation methodology approved by EIC based on site requirements. |
| 79 | Crossing of Sewage Drains/Nala alongside independent houses where drains/Nalas are being encountered adjacent to houses. |
| 80 | The scope of work includes supply of medium-duty GI casing pipes of 2.5 inches, along with padding with sandstone and civil works associated with the construction of cover slab as per std. drawing. |
| 81 | PNG Connection to Domestic/Commercial/Industrial Consumers |
| 82 | Installation of GI Service Pipe / Carbon Steel (CS) Pipe |
| 83 | Supply/Receipt, Loading, unloading, storing, reloading, transportation, unloading at work site, and laying of either Owner-supplied Powder-coated GI pipes or Contractor-supplied Powder-coated GI pipes & carbon steel pipes of all sizes & thicknesses, including supply of all associated compatible accessories of all sizes & thicknesses like Elbows, Tees, unions, sockets, reducers, GA plugs, sleeves, etc. Installation of GA line (along with installation of required accessories as mentioned above) of all sizes & thicknesses, including fabrication with supply of all materials, consumables, labor, and other incidental works. The scope of work also includes installation of Regulators (4/6 bar to 100/21 mbar and/or 100 mbar to 21 mbar) which shall be provided as free issue items, Installation of all sizes of isolation Valves (which are to be procured & supplied by contractor mentioned elsewhere as separate items in the SOR). Carrying out all temporary, ancillary, auxiliary works required to make the GI line complete and ready for commissioning as per drawings specifications. Handling, aligning, fabrication & installation of the GA Pipes in the work area along with required associated compatible accessories as mentioned above as per site condition and as per instruction of EIC. Execution of all associated works; Supply of all materials, consumables, equipment, labor, and other inputs; Storage of material in the contractor’s store in a safe manner, pre-fabrication, access for construction/fabrication work area. In the case of free-issue items, the scope also includes receiving and loading from Owner's designated store within GA, transportation, unloading, and stacking of free-issue items at the Contractor's store in a safe condition. |
| 84 | Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-In-charge, including but not limited to carrying out the following works |
| 85 | Preparation and getting approval of execution schedules, execution procedures, drawings/sketches from Owner/Engineer-in-charge and/or from concerned authority. |
| 86 | Finalization of optimum route with consent of customer, from transition fitting to cooking oven/appliance. |
| 87 | Making temporary but stable platforms/scaffolding/rope ladders and all other safety measures including safety belts wherever required, |
| 88 | Installation of GI pipes, fittings, including NPT threading, painting as specified. |
| 89 | Drilling of holes through walls (brick, RCC), granite, marble, tiles, cutting with proper heavy-duty hammer drill machine tools and tackles, using proper sealant/grout material and colors to match the original, replacement of damages during drilling, restoring the area to its original condition. |
| 90 | In case of multistorey buildings where RCC slabs/visors/sunshades/chhajjas restrict riser installation, separate payment for cement concrete/RCC core cutting using a heavy-duty drilling machine and its restoration shall be made under SOR Item Nos. B00600 to B00704, as per the instructions and direction of the EIC. |
| 91 | Supply and fixing of approved clamps, dowel plugs with screws, grout material, suitable thread sealant (i.e., Teflon Tape/Loctite), drilling of holes through tiles/wood/marble/granite, etc., jointing of PE to aboveground service GI pipes, flushing, pneumatic testing, purging with nitrogen (including supply of nitrogen as inert gas by the contractor), and commissioning or making ready for commissioning of the complete system as per specification and as per instructions of EIC. |
| 92 | Touch-up painting/painting of outer surface of GI pipe of all sizes along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification and direction of EIC. Restoring the wall surface to original condition to the entire satisfaction of EIC and obtaining NOC from end user/consumer/concerned authorities/authorized competent person of the society. |
| 93 | All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. |
| 94 | Handing over the completed works to GAIL for operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from GAIL/GAIL Representative at Site/ CMC. |
| 95 | Any other activity not mentioned/covered, explicitly above, but otherwise required for satisfactory completion/safety/statutory/maintenance of works shall also be covered under the scope of work and has to be completed by the contractor within the specified schedule time. |
| 96 | Supply, loading, storing, unloading and laying of GI pipes, including supply of GI fittings/accessories including Anaconda, Fittings of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs,Sleeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials , consumables, labour and other incidental works. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications. |
| 97 | Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Preparation and approval of schedules, execution procedures, sketches. |
| 98 | Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. |
| 99 | Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety measures including safety belts wherever required. |
| 100 | Installation of GI Pipes ,Fittings, including NPT threading, painting as specified . |
| 101 | Drillings of holes through walls (Brick, RCC) , Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackles, using proper sealent /grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition. |
| 102 | Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. |
| 103 | Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin. Preparation of Isometric Drawing, Testing of Installation at prescribed pressure and interval. |
| 104 | All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. |
| 105 | Handing over the completed works to GAIL for operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from GAIL / CMC. |
| 106 | Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time. |
| 107 | Left Out Work in Old Riser: Contractor has to carry out pending activities like testing, tapping, meter installation, Anaconda, leakage arrest, regulator installation, Ground Connectivity etc. in old riser to make the connection ready for conversion as per instruction and direction of EIC. In order to complete the old riser,payment shall be made as per the following SOR Items |
| 108 | 1/2 Inch GI Pipe, as per actual-All Floor: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 109 | 3/4 Inch GI Pipe, as per actual-All Floor: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 110 | 3/4 Inch GI pipe installation by welding: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 111 | 1 Inch GI pipe installation by welding: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 112 | Note to items under B00100:- i) Refer to the Particular Job Specification for the supply items. ii) The quantity measurement shall be from the outlet of the Transition Fitting (TP) up to the Meter. All Intermediate CA fittings & valves, GI fittings & valves (excluding Flexible Hose / Anaconda, meter, and regulator) shall be considered while measuring the length of CS/GI Pipes.iii) Supply of isolation Ball valves shall be paid as a separate SOR Item. |
| 113 | Carrying out Seal Welding of GI/MS Pipes as per latest applicable code & standard for above SOR itemsB00103, B00104 as per site requirement and instruction of EIC |
| 114 | Carrying out NDT/Radiography of welded joints of CS/GI pipes as per the latest applicable codes and standards, and as per site requirements and the instructions of the EIC, complete in all respects. |
| 115 | Supply of Nitrogen as an inert gas for preservation at positive pressure and/or other tasks as per site requirements and instructions of EIC (where the supply of Nitrogen is not included in the scope of work mentioned elsewhere in the SOR). |
| 116 | Installation & fixing of meters with associated inlet and outlet connections/ fittings/adapters, valves, regulators ( 100mBar, 21 mbar), approved meter brackets and other supports by proper scaffolding/ grouting, restoring the area to original condition as per specification. (Meter and Regulator will be issued as free issue Item) |
| 117 | Domestic Meter installation (G1.6) |
| 118 | Anaconda installation (Supply in contractor scope) |
| 119 | NOTE:1) Technical specification of Anaconda shall be in accordance with applicable National /Interantion Stadnard, PNGRB |
| 120 | Domestic/Service Regulator ( 100mBar, 21 mbar) with associated inlet and outlet connections/ fittings/adapters, Bracket, other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification and instruction of EIC. (Regulator will be issued as free issue Item) |
| 121 | Domestic Regulator installation 100mBar to 21mBar |
| 122 | Domestic Regulator installation 4 to 21 mbr |
| 123 | Domestic Conversion: The work also includes installation and supply of Steel reinforced Flexible Hose as per IS 9573 (with Type as per lastest PNGRB guidelines) (Gas tube from end of Isolation Valve upto burner/stove) and conevrsion of all the burners of the LPG stove (one appliance per household) including supply of all types of burner nozzles/jets and associated controls etc. Gas hose pipe 1m /1.5 m length AS PER LATEST PNGRB STD. with nozzles for burners & other associated fittings are in scope of Contractor. |
| 124 | Domestic Conversion (Domestic Appliances) |
| 125 | Testing of GI Piping already installed in customer premises. Preparation of Isometric Drawing, testing and commissioning |
| 126 | Testing of GI Piping already installed in customer premises. Preparation of Isometric Drawing, testing and commissioning of 1/2\\", 3/4\\", 1\\" GI Piping & Copper Piping |
| 127 | Cutting/Breaking and Restoration |
| 128 | In the case of a multistorey building where RCC slab/visor/sunshade/chhajja restricts riser installation, then separate payment for core-cutting with a heavy-duty drill machine shall be made under the below SOR items and as per the instructions and direction of EIC. |
| 129 | Breaking/Cutting of Cement Concrete - Making provision for GI Pipe laying |
| 130 | Cement concrete restoration as per the scope of work for GI Pipe laying (excluding breaking/cutting) |
| 131 | Breaking/Cutting of RCC Core - Making provision for GI Pipe Laying |
| 132 | RCC restoration as per scope of work for GI Pipe laying (Excluding Breaking/Cutting) |
| 133 | Core Cutting of RCC Slab/Floor/Roof/Pillar/Beam for GI Riser (1/2\\". 3/4\\", 1\\") in Multistorey Apartments/Independednt House |
| 134 | RCC Structure |
| 135 | Wooden Structure |
| 136 | Aluminium Structure |
| 137 | Glass Cutting |
| 138 | Supply, Installation, Testing & Commissioning of Copper Service Pipes |
| 139 | Supply and installation of copper tubing and installation of Appliance Ball valves as per Technical specification and alogwith associated acessories/fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction and instruction of EIC. The copper tube and fittings shall be procured from approved vendors who have supplied these items for similar application earlier and with prior approved of Owner / PMC. |
| 140 | Copper tubing shall be installed from the downstream of the meter up to the isolation/appliance valve before the customer's appliance as required and to the satisfaction of the EIC. The contractor is responsible for providing all equipment, tools, tackles, and associated materials necessary to efficiently execute the work by cutting, cleaning, applying flux, soldering, and lacquering. This work includes the supply of all tools, tackles, and consumables, including clamps for fixing the tubes, and the restoration of the work area to the customer's satisfaction. |
| 141 | 12.0 mm OD x 0.6 mm wall thickness |
| 142 | Supply and Installation of MLC -Pipe in Scope of Contractor |
| 143 | NOTE::Approved vendor list for MLC pipes -Jindal/Uniflex Pipes/Any ISI approved make. |
| 144 | Dismantling of existing GI Installation, fittings etc. as per direction of EIC |
| 145 | 3/4\\" GI |
| 146 | 1/2\\" GI |
| 147 | 1\\" GI |
| 148 | Copper Pipes, 12.0 mm OD x 0.6 mm wall thickness |
| 149 | Domestic Meter (G1.6) |
| 150 | Domestic Regulator (2.5 SCMH) |
| 151 | Re-Installation (dismantling and re-routing) of GI Installation, fittings etc. as per the direction of EIC. |
| 152 | 3/4\\" GI |
| 153 | 1/2\\" GI |
| 154 | 1\\" GI |
| 155 | Copper Pipes, 12.0mm Odx 0.6mm wall Thickness |
| 156 | Construction of a pedestal surrounding the GI Sleeve at the transition fitting location of the MDPE pipe and GI Pipe in the O&M area on the existing service line |
| 157 | GI Sleeve upto 2.5 inch and length 1 feet with concrete foundation etc. Complete |
| 158 | Concrete half sleeve 2.5 inch and length 1 feet including HDPE Pipe, Clamp etc. Complete |
| 159 | Supply of Valves for Carrying out connection (For Domestic Connections) |
| 160 | Supply of Isolation & Appliance Ball Valves as per Technical Specification and as directed by EIC |
| 161 | Isolation Ball Valve 1/2 \\" max. 6 bar (g) |
| 162 | Isolation Ball Valve 3/4 \\" max. 6 bar (g) |
| 163 | Isolation Ball Valve 1 \\" max. 6 bar (g)) |
| 164 | Appliance Ball Valve 1/2 \\" max. 35 mili Bar (g) |
| 165 | Installation of Isolation Ball Valve (1/2\\", 3/4\\" & 1\\") max. 6 bar (g): Valves are in GAIL scope |
| 166 | NOTE: |
| 167 | 1:)Isolation Valves, Applicance valves in the scope of Contractor shall be in accordance with applicable National/Internation Standard, PNGRB and as directed by EIC. |
| 168 | Registration of Domestlc PNG Connections |
| 169 | Assistance in conducting Domestic PNG registration work as directed by the Marketing In charge of GAIL (I) Limited / Authorized representative, including but not limited to the following:I) Enrolling & registering Domestic PNG Customers according to the given target.II) Collecting filled-up forms, along with Cheque/Demand Draft for Security Deposit amount and documents. All other necessary activities to complete the work as defined in the Scope of work, to be read along with the Special Conditions of Contract and as per instructions of MIC. Conducting marketing activities for Domestic PNG connection as detailed in Scope of work, complete in all respects, as per directions/instructions of the Marketing In Charge, including but not limited to the following: Distribution of leaflets & FAQ, Installation of banners provided by the client at prime locations, Awareness cum Registration Camp, Audio / Visual Presentations, Organizing Road Shows, etc. |
| 170 | Enrolling and registration o domestic customer and uploading all documents in sahaj (Registration without SD) |
| 171 | Collection of Security deposit |
| 172 | Providing the Services of Resources as per site requirement |
| 173 | Providing the services of Plumber(Manday= 8 Working Hours) |
| 174 | Providing the services of HeIper(Manday= 8 Working Hours) |
| 175 | Providing the Services of Welder(Manday= 8 Working Hours) |
| 176 | Providing the Services of EIetricIan(Manday- 8 Working Hours) |
| 177 | Providing the Services of Conversion Technician(Manday= 8 Working Hours)s) |
| 178 | Providing the Services of Grinder(Manday- 8 Working Hours) |
| 179 | Note for all above SOR Items Nos. A00100 to D00106 :-i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC.ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, bidders are requested to quote such items based on practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC.iii) Quantities mentioned against all above SOR items are estimated & tentative and may required to beexecuted in Varanasi GA, in any ratio, as per site requirement and/or as per instruction of EIC. In this regard, decision of EIC shall be final and binding to the contractor. Hence, bidder is requested to familiarize themselves with both the GAs mentioned above while formulatingtheir bid. |
| 180 | Installation of GI Service Pipe (For Commercial/Industrial Connection and Installaton of Service Regulator) |
| 181 | Supply, loading, storing, unloading and laying of GI pipes, including supply of GI fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs, sleeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials, consumables, labour and other incidental works. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications. |
| 182 | Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. |
| 183 | Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety devices. |
| 184 | Installation of GI Pipes, Fittings, Valves, warning plate including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). |
| 185 | Drillings of holes through walls (Brick, RCC), Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackeles, using proper sealent /grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition. |
| 186 | Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. |
| 187 | Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin |
| 188 | All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. |
| 189 | Handing over the completed works to Client for operation/ use, reconciliation of material area wise. |
| 190 | Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time. |
| 191 | Commercial Meter: Installation & fixing of commercial meters along with box such as G4, G6, G10, G16 and G25 etc. with associated inlet and outlet connection fittings with required supports etc, by using proper scaffolding. Restoring the area to original complete as per the specification. Commercial meter along with box is a free issue material. The contractor shall supply all required meter clamps, accessories, and consumables etc. complete. |
| 192 | Commercial Regulator: Installation & Fixing of commercial regulators (0.5 - 6 bar to 300/ 500 mbar) -10 SCMH to 65 SCMH capacity with associated inlet and outlet connection fittings with required supports. Restoring the area to original completre as per specification.COMMERCIAL REGULATOR is a free issue material. |
| 193 | TPIA Certification for commercial/ Industrial/ domestric customer connection shall be obtained as per PNGRB guidelines before commissioning of the line, along with all required Third Party Inspection Certificates and supporting documents as per PNGRB Norms |
| 194 | Supply and installation pf commercial/Indstrial meter box |
| 195 | Supply and installation of Isolation Valves as per Technical Specification and as directed by EIC,(Approved make L&T/Audco or as mentioned in tender ) |
| 196 | Isolation Ball Valve 1 \\" max. 6 bar (g)(Threaded ) |
| 197 | Isolation Ball Valve 1 \\" max. 6 bar (g)(Flanged ) |
| 198 | Installation of Service Regulator / Field Regulator: Installation & Fixing of regulator with associated inlet and outlet |
| 199 | The scope also includes works like making of PCC pedastal of grade (1:2:4) and size (8\\"X6\\"X4\\"), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply). |
| 200 | Service Regulator installation - (4/6 bar to 100 mbar) |
| 201 | Regulator Boxes: Supply including painting of approved make regulator boxes and installing them firmly by grouting using approved bracket /clamps as per drawing enclosed & as per specifications and and cleaning the area complete to the satisfaction. |
| 202 | Service Regulator Boxes: Supply and installation of Service Regulators Boxes as per drawing attached and as per directions of EIC. |
| 203 | Supply and Installation of Transition Fittings for Commercial/Industrial connections |
| 204 | 2\\" TF |
| 205 | 1\\" TF |
| 206 | Excavation of Hard rock/surface |
| 207 | Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above theLaying rates as per relevant SOR Item No. A00100 |
| 208 | Cutting of PCC/RCC surface with thickness more than 12\\" or Continuous asphalt multi-layer/ Malba/ Brick / rock/ Boulders more than 24\\".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces of bricks/stones ) |
| 209 | Additional Backfilling of Sand in excavated trench/Pit as per site requirement |
| 210 | Filling of M-Sand/Soft soil as per the site requirement and as per the instructions of EIC (except the sand padding asmentioned SOR Item No. A00100) |
| 211 | Liaisoning with Land Owning Agencies for PermissionSubmission of applications as per approved drawing provided by owner / owner's representative (Initial Route survey, prepartion of drawing, measuring and providing details of surface type shall be in scope of contractor), obtaining and submission of demand note, coordination, Liaisoning, obtaining written permission from land owing agencies like NHAI, AAI,Indian Railways and any other government agencies who maintains the public lands and agencies owing Private lands etc. (all fee paid to authorities excluding demand charges or Bank Guarantees shall be reimbursed against documentary evidence). This rates are not applicable for Private lands i.e. Apartments etc. Permissions required from various authorities like NHAI / Railways / Irrigation (Canal) etc. falling enroute shall be inclusive in the item rate. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |