| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Superintending Engineer, (OP) Circle, HPSEBL, Mandi Name of Work: Tender for providing Survey, Supply, design ,Erection testing & Commissioning of 22 KV H T line, 2x400 KVA DTR, L T line and civil work etc. for providing SOP to \\"EV Chargeing Station of HRTC at Sanarli, Tehsil Karsog Distt Mandi in Electrical Section Karsog under ESD HPSEBL, Karsog. Contract No: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | (Supply Part) - 400 KVA 22/0.4KV Sub-Station |
| 3 | Distribution Transformer (Ordinary), 22/0.4 kV, 400 KVA |
| 4 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 5 | Muffs (2000mm) with concerete filling |
| 6 | CT-PT Combined Unit [PT:22 kV/110 V) ; CT:10-400/5A] |
| 7 | 3-phase, 3/4-Wire CT-PT operated Static Trivector Meter (DLMS Compliant |
| 8 | PVC Multistrand 2.5 mm² copper wire |
| 9 | 1 inch dia GI pipe for concealing |
| 10 | bend joints/ elbow |
| 11 | X-arms :- MS Channel Iron C Type (100x50x6mm), Length : 3000mm x1 No. ( Including Tolerance )(2 No. Circuit ; Left & right)/ Run Through Str. |
| 12 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incommer line |
| 13 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's |
| 14 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch |
| 15 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 16 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
| 17 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 18 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 19 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 20 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 21 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 22 | GO Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 23 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 24 | D.O Fuse Unit |
| 25 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 26 | Stay set complete |
| 27 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 28 | Pipe Earthing Set |
| 29 | 6 SWG GI wire For Earthing |
| 30 | LT Distribution Panel Box with MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm inside .painted /powder coated after primar coating,Fitted with Bakelite sheet ,500 Amp Copper thimble MCCB 630 amp 3P 50kA -1 No., Make L&T,Schneider Havalles,ABB or equivalant, MCCB 250 Amp 36 kA 3P of L&T,Havalle, Schneider ,ABB or equivalent make -3 Nos |
| 31 | Half Clamp (M.S. Flat 50X6 mm) |
| 32 | Full Clamps (M.S. Flat 50X6 mm) |
| 33 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 34 | Aluminium Thimble 300 sq mm |
| 35 | Copper Thimble 95 sq mm |
| 36 | Danger Plate |
| 37 | Barbed Wire |
| 38 | LT Cable (3.5 Core) 400 mm² X 2 incommer |
| 39 | LT Cable (3.5 Core) 70 mm² X 6 Outgoing |
| 40 | Energy Meter (3-Phase, 4-Wire) DLMS compliant 1000/5 A CT Type for 400KVA Transformer |
| 41 | Aluminium Paint. |
| 42 | Red oxide |
| 43 | 22Kv Outgoing Feeder :- Control and Relay (CR) Panel with indoor VCB (24KV, 1250A ,25KA including CT ratio 200-100/5A |
| 44 | 22 kv Adopter Panel |
| 45 | Transportation Charges |
| 46 | (Supply Part) of 22 KV H.T. Line |
| 47 | Providing ACSR 6/1/3.35 (50mm Sqr.) conductor |
| 48 | Muff (2000mm) with concerte filling |
| 49 | X-arms :- MS Channel Iron C Type (100x50x6mm), Length : 2800mm x2 No. ( Including Tolerance )(2 No. Circuit ; Left & right)/ Run Through Str. |
| 50 | X-arms :- MS Channel Iron C Type (100x50x6mm), Length : 3000mm x1 No. ( Including Tolerance )(2 No. Circuit ; Left & right)/ Run Through Str. |
| 51 | Half Clamp : (On Run Through Str.:) |
| 52 | Full Clamp ;( On Run Through Str.) |
| 53 | Dics insulator String (Strain ) set 2no. Disc in each string ( procline ,BS ,12 KV 90Kn) including Dead end Clamp ,stright Stapple & bend Stapple etc.) X (2No. Side ) dead str. |
| 54 | Belt Set -Ms Angle Iron : 50x50x6, length (1800mm x2No.) |
| 55 | X -Bracing Set -Ms Angle Iron : 50x50x6mm Lenth 2125mm x 2No. |
| 56 | Stay set complete in all respet (i/c stay clamp )4 No./Dead Str. & n No. Run Through |
| 57 | Stay wire (7/4.00mm ) 12Kg Per stay set |
| 58 | HT Earthing Set Complete |
| 59 | Earthing Wire (GI, 6 SWG (alonghwith 2 wire lengthfor avg. one road crossing @ 20m and add. 3% (sag, cross Lacing and wastage @150Kg /km |
| 60 | eye hook for earth hook wire |
| 61 | Earthing reel |
| 62 | MS Channel Iron x-aram : 75x40x6 mm Length (3300 mm) |
| 63 | Nuts &Bolts of Various size (Galvanised /coated) |
| 64 | Barbed wire |
| 65 | Danger Plate (203x200x1.6mm) |
| 66 | Red Oxide |
| 67 | Aluminium paint |
| 68 | GO AB Switch Unit (22Kv ,400A ,25kA ) Tripple pole O/D Type |
| 69 | Transportation charges |
| 70 | (Supply Part) LT. Line |
| 71 | LT AB Cable (4x150+1x150+1x16mm sqr.) x2 Cable (additional 3% sagging & wastage |
| 72 | Steel Tubular Pole (9m working Load >200Kgf/m2) |
| 73 | Muff (2000mm )with concerete filling |
| 74 | Stay set complete (i/c stay clamp) |
| 75 | Stay wire (7/4mm) 9.0Kg Per stay set |
| 76 | X-arms (Horizontal ) -Ms Channel Iron : 100x50x6, Length (600mm) |
| 77 | Knee Bracing set Length 1100mm (65x65x6mm) |
| 78 | Half Clamp for cross arams |
| 79 | Full Clamp |
| 80 | Insulation piercing connector (IPC) having upto 50sqr. Mm |
| 81 | Anchoring assembly |
| 82 | Suspension assembly |
| 83 | Façade Hook |
| 84 | LT Earthing set complete (coil earthing) |
| 85 | G.I wire for earthing |
| 86 | Nuts & bolts |
| 87 | Red oxide |
| 88 | Aluminium Paint |
| 89 | Transportation charges |
| 90 | (Erection Part ) - 400KVA 11/0.4KV Sub-Station |
| 91 | Erection Charges of 400Kva,22/0.4Kv DTR Complete in all respect |
| 92 | Loading un loading of 400 KVA DTR with hydra Machine |
| 93 | Erection charges for CTPT combine Unit Complete in all respect |
| 94 | (Erection Part) ) of 22 KV H.T. Line |
| 95 | Erection of S/T pole 9/10 mtr long,( Double pole structure) with RCC muff Including Concreating digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 96 | Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 97 | Sagging of conductor 1 KM single GI wire, comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. |
| 98 | Erection of H T line with AAAC7./3.81 mm2 (80 mm2) such as stringing, tensioning and sagging,jointing and fastening . |
| 99 | Erection of HT Earthing Set complete in all respects. |
| 100 | Errection of GO Switch & DO fuse unit Complete in all Respect |
| 101 | Erection of Adopter Panel at 33/11 K V Sub-Station at Batala Behal Complate in all respect |
| 102 | Erection of 22 kv outgoing feeder:-Control relay Panel with indoor VCB at 33/11 K V Sub-Station at Batala Behal complete in all respect |
| 103 | (Erection Part) ) of L TLine |
| 104 | Erection of L T steel tubular Poles complete in all respect |
| 105 | Erection of L T Stay set complete in all respect |
| 106 | Erection of L T Earthing set complete in all respect |
| 107 | Erection of LT AB Cable (4x150+1x150+1x16mm2) for LT Line (Including laying of cable ,installation of suspension and tension assembly etc,sagging of cable with cable clamps on messenger wire ) complete in all respect. |
| 108 | CIVIL PART (DTR foundation & chain link fencing of 400 KVA Distribution Transformer |
| 109 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 110 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) |
| 111 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. |
| 112 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 113 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) |
| 114 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 115 | DTR FENCING: Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 116 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm |
| 117 | Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete :125x65x2.12 mm |
| 118 | Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete :250x16 mm |
| 119 | Supplying, filling, spreading & leveling gravels of approved size in required thickness, for all leads & lifts, all complete as per direction of Engineer-incharge. Total in Figures 4820643.77 4820643.77 INR Forty Eight Lakh Twenty Thousand Six Hundred & Forty Three and Paise Seventy Seven Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |