| 1 | CARTAGE OF 8.5 M/9M/11M/13M POLES FROM ESC/ASK STORE HAMIRPUR OR FROM ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALSO INCLUDING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. | CARTAGE OF 8.5 M/9M/11M/13M POLES FROM ESC/ASK STORE HAMIRPUR OR FROM ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALSO INCLUDING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 2 | CARTAGE OF LINE MATERIAL VIZ WEASEL CONDUCTOR , ABC CABLE CROSS ARM ETC LINE MAETRIAL FROM ESC/ASK STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROADINCLUDING THE WORK. | CARTAGE OF LINE MATERIAL VIZ WEASEL CONDUCTOR , ABC CABLE CROSS ARM ETC LINE MAETRIAL FROM ESC/ASK STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROADINCLUDING THE WORK. |
| 3 | DISMANTLING OF DAMAGE 8.5 M/9M/11M/13M POES | DISMANTLING OF DAMAGE 8.5 M/9M/11M/13M POES |
| 4 | ERECTION OF 8.5M/9M/11M/13M POLES INCLUDING COMPLETE HT/LT FITTING AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER IN CHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRED FOR PROPER COMLETION OF WORK. | ERECTION OF 8.5M/9M/11M/13M POLES INCLUDING COMPLETE HT/LT FITTING AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER IN CHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRED FOR PROPER COMLETION OF WORK. |
| 5 | DISMANTLING AND REMOVAL OF EXISTING CONDUCTOR/ABC CABLE ETC FROM VARIOUS AREA STACKING AND PLACEMENT THEIR COIL AND THEIR IN RESPECTIVE JE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDE THE COST OF CARTAGE THE COST OF LABOUR T&P CARRIER REQUIRED FOR PROPER COMPLETION OF WORK. | DISMANTLING AND REMOVAL OF EXISTING CONDUCTOR/ABC CABLE ETC FROM VARIOUS AREA STACKING AND PLACEMENT THEIR COIL AND THEIR IN RESPECTIVE JE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDE THE COST OF CARTAGE THE COST OF LABOUR T&P CARRIER REQUIRED FOR PROPER COMPLETION OF WORK. |
| 6 | LAYING, SAGGING, STRINING, BINDING AND JUMPERING OF ACSR WEASEL CONDUCTOR NEW/OLD ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER DIRECTION OF SUPERVISING ENGINEER | LAYING, SAGGING, STRINING, BINDING AND JUMPERING OF ACSR WEASEL CONDUCTOR NEW/OLD ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER DIRECTION OF SUPERVISING ENGINEER |
| 7 | DISMENTLING & DAMAGE ABC CABLE & NEW ERECTION OF ABC CABLE AS PER RESSPO MANUAL | DISMENTLING & DAMAGE ABC CABLE & NEW ERECTION OF ABC CABLE AS PER RESSPO MANUAL |
| 8 | RE-SAGGING OF LOOSE CONDUCTOR ALL TYPE CONDUCTOR/ABC CABLE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDE THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. | RE-SAGGING OF LOOSE CONDUCTOR ALL TYPE CONDUCTOR/ABC CABLE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDE THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 9 | RE-TIGHTENING OF STAY COMPLETE WITH NOZELLING AND BINDING, INCLUDING COST OF LABOUR T&P CARRIER T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK. | RE-TIGHTENING OF STAY COMPLETE WITH NOZELLING AND BINDING, INCLUDING COST OF LABOUR T&P CARRIER T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 10 | ERECTION & GROUTING OF STAY SET INCLUDING THE WORK OF NUZZLING ETC AS PER RESSPO MANUAL | ERECTION & GROUTING OF STAY SET INCLUDING THE WORK OF NUZZLING ETC AS PER RESSPO MANUAL |
| 11 | STRAIGHTENING OF TILLED POLE AT VARIOUS PLACE AS PER DIRECTION OF SUPERVISING ENGINEER | STRAIGHTENING OF TILLED POLE AT VARIOUS PLACE AS PER DIRECTION OF SUPERVISING ENGINEER |
| 12 | TREE CHOOPING OF LINE | TREE CHOOPING OF LINE |