| 1 | Fitting and erecting one HT PSC SinglePole in position, including fitting crossarm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 2 | Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 3 | Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 4 | Stringing of one km 3 PH 11kV linewith XLPE Insulated ACSR Raccoon orequivalant (3 conductors) after fittinginsulators, binding conductors to pininsulators using suitable tie andanchoring with wedge type anchoringclamps including cutting and removingtree branches wherever necessaryexcluding cut point works. |
| 5 | Fitting and providing one Strut using HTPSC pole including digging and backfilling pit in ordinary soil. |
| 6 | Fitting one Additional V cross arm inexisting single pole includingconveyance of materials. |
| 7 | Additional rate for providing one discset, PG clamp etc. complete, on any typeof HT pole for making cut point. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 9 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 10 | Providing one Coil Earth using No.8 GIearth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 11 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 12 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 13 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 14 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 16 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 17 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 18 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 19 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at a minimumdistance of 1.5m away from thepole/structure and maintaining standarddistance between different earth pipes inordinary soil & backfilling. |
| 20 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 21 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 22 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 23 | Dismantling (without damage) LT stayincluding digging pit in all classes of soiland backfilling. |
| 24 | Dismantling (without damage) one LTPSC/RCC Strut pole including removalof clamps and stacking. |
| 25 | Additional rate for reinstalling LT lineon the renewed 11kV pole having bothHT and LT (HT/LT) lines. |
| 26 | Additional rate for refitting/redoing oneShackle Set, including reshacling onespan, while renewing any type of LTpole. |
| 27 | Redoing single phase WP serviceconnection complete including loweringdown the guy wire portion, repairing orchanging WP wire, GI wire, Fuse unitetc., changing Energy Meter cutout,neutral link etc., if necessary andreconnecting the same includingconveyance of material to site fromSection office at various location. |
| 28 | Redoing three phase WP serviceconnection complete including loweringdown the guy wire portion, repairing orchanging WP wire, GI wire, Fuse unitetc., changing Energy Meter cutout,neutral link etc., if necessary and reconnecting the same includingconveyance of material to site fromSection office at various location. |
| 29 | Additional rate for excavation of one Pitfor HT Pole/HT Stay in Hard Laterite. |
| 30 | Additional rate for excavation of one Pitfor HT Pole/HT Stay in Laterite. Please Enable Macros to View BoQ information |