| 1 | M & L for Inspection and carrying out B-Checks of 500 KVA DG Set Once in Six months or 250 Hours of Run whichever is earlier installed at various locations for the DG Set including inspection, maintenance, changing all types of filters and servicing of DG Set including Alternator, Non AMF / AMF Panels connected to DG Sets for routine check-up including routine / preventive maintenance checks, checking up of engine and alternator for the smooth functioning as per the Manufacturer’s instructions including checking of Engine Oil Level, Oil Bath Cleaner Oil Level, Draining Sediments from Fuel Tank, checking of Pre Cleaner Dust Pan, Air Cleaner Restriction, Coolant Level, Recording Oil Pressure, Checking / Tightening of all Bolts / Nuts of Engine and Alternator, checking of AVM Pads, Diaphragm Coupling, Air Piping, cleaning of Oil Bath Air Cleaner Tray Screen, check / adjust Belts, checking Battery Voltage, Water Level and apply Jelly on Terminals, checking Fan Hub / Air Blower Hub and Water Pumps, cleaning of electrical connections with CTC solution, checking of safety controls, cleaning of Cooling System, cleaning of Engine and Radiator Assembly, including cleaning of Air Filter using Pressure Air, Corrosion Inhibitor, O Ring, Gaskets, Screws etc. and draining out old engine oil from oil chamber and removing deposited material including applying Grease, CRC in moving parts and draining out water from radiator assembly and refilling new after mixing with coolant including tightening of all inlet and outlet connections and replacing minor items such as Hose Clamp, Screws, Washers etc., cleaning of Roof, Floor of the DG Set Room complete all as specified and as directed.Note: The B Check includes carrying out preventive maintenance including replacing minor unserviceable / worn out spares to keep the DG set for trouble free functioning. The rate quoted is deemed to be including all the minor spares such as screws, clips,washers, distilled water, electrolyte. All other spares will be measured and paid seperately as supply only under relevant items of this schedule, Contractor has to attend the break down at any time and place during the contract period. General maintenance is indicative only contractor has to carryout other necessary maintenance task also as required and directed by Engineer in Charge. |
| 2 | All as per item no. 1 here in before but DG set of capacity 1010KVA |
| 3 | All as per item no. 1 here in before but DG set of capacity 250KVA |
| 4 | All as per item no. 1 here in before but DG set of capacity 200KVA |
| 5 | All as per item no. 1 here in before but DG set of capacity 160 KVA |
| 6 | All as per item no. 1 here in before but DG set of capacity 100KVA |
| 7 | All as per item no. 1 here in before but DG set of capacity 82.5KVA |
| 8 | All as per item no. 1 here in before but DG set of capacity 62.5KVA |
| 9 | All as per item no. 1 here in before but DG set of capacity 50KVA |
| 10 | All as per item no. 1 here in before but DG set of capacity 30KVA/40KVA |
| 11 | All as per item no. 1 here in before but DG set of capacity 15KVA |
| 12 | All as per item no. 1 here in before but for diesel engine coupled to fire fighting pump of capacity 43 HP / 10 HP |
| 13 | Supply & Fixing in replacement of oil filter for the DG set of capacity 1010 KVA |
| 14 | Supply & Fixing in replacement of oil filter for the DG set of capacity 500 KVA |
| 15 | Supply & Fixing in replacement of oil filter for the DG set of capacity 250 KVA |
| 16 | Supply & Fixing in replacement of oil filter for the DG set of capacity 200 KVA |
| 17 | Supply & Fixing in replacement of oil filter for the DG set of capacity 160 KVA |
| 18 | Supply & Fixing in replacement of oil filter for the DG set of capacity 100 KVA |
| 19 | Supply & Fixing in replacement of oil filter for the DG set of capacity 82.5 KVA |
| 20 | Supply & Fixing in replacement of oil filter for the DG set of capacity 62.5 KVA |
| 21 | Supply & Fixing in replacement of oil filter for the DG set of capacity 50 KVA |
| 22 | Supply & Fixing in replacement of oil filter for the DG set of capacity 30 /40 KVA |
| 23 | Supply & Fixing in replacement of oil filter for the DG set of capacity 15 KVA |
| 24 | Supply & Fixing in replacement of oil filter for engine coupled to fire fighting pump of capacity 43 HP / 10 HP |
| 25 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 1010 KVA |
| 26 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 500 KVA |
| 27 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 250 KVA |
| 28 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 200 KVA |
| 29 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 160 KVA |
| 30 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 100 KVA |
| 31 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 82.5 KVA |
| 32 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 62.5 KVA |
| 33 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 50 KVA |
| 34 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 30 / 40 KVA |
| 35 | Supply & Fixing in replacement of fuel filter for the DG set of capacity 15 KVA |
| 36 | Supply & Fixing in replacement of fuel filter for engine coupled to fire fighting pump of capacity 43 HP / 10 HP |
| 37 | Supply & Fixing in replacement of coolant filter for 1010 KVA DG set installed at main power house |
| 38 | Supply & Fixing in replacement of coolant filter for 500 KVA DG set installed at main power house |
| 39 | Supply & Fixing in replacement of coolant filter for 250 KVA DG set installed at TA Batallion |
| 40 | Supply & Fixing in replacement of coolant filter for 200/160 KVA DG set installed at Likabali Auditorium/MAP |
| 41 | Supply & Fixing in replacement of coolant filter for 100/82.5/62.5 KVA DG set installed at Likabali Auditorium/MAP |
| 42 | Supply & Fixing in replacement of coolant filter for 15 to 50 KVA DG set installed at Likabali Auditorium/MAP |
| 43 | Supply & Fixing in replacement of by pass filter for 1010 KVA DG set installed at main power house |
| 44 | Supply & Fixing in replacement of by pass filter for 500 KVA DG set installed at main power house |
| 45 | Supply & Fixing in replacement of by pass filter for 250 KVA DG set installed at TA Batalian |
| 46 | Supply & Fixing in replacement of by pass filter for 200/160 KVA DG set installed at Likabali Auditorium/MAP |
| 47 | Supply & Fixing in replacement of Fuel Water Separator Filter suitable for 250 KVA DG set installed at TA Battalion complete all as specified and as directed. |
| 48 | Supply and filling distilled water for batteries of DG set complete all as specified and as directed. |
| 49 | S&F in repairs battery charger automatic type 220 V AC input and 24/12 V DC10 Amps output with auto cut off, floating, indicating meters, lamps, connectig to the exisitng circuit and testing complete all as specified and as directed. |
| 50 | M&L for injector and valve settings by adjusting the clearances according to engine firing orders, cleaning the prefilter cap, checking and adjusting the belts, checking and adjusting the mounting pads including replacement of unserviceable valve door gasket complete all as specified and as directed for DG set of capacity 500 KVA. |
| 51 | M&L for injector and valve settings by adjusting the clearances according to engine firing orders, cleaning the prefilter cap, checking and adjusting the belts, checking and adjusting the mounting pads including replacement of unserviceable valve door gasket complete all as specified and as directed for DG set of capacity 250/200 KVA. |
| 52 | Supply and filling premix coolant for radiator suitable for DG set 1010 KVA DG set all as per manufacturers recommendations |
| 53 | Supply and filling pure coolant for radiator suitable for DG set 1010 KVA DG set all as per manufacturers recommendations |
| 54 | Supply and filling coolant for radiator suitable for DG set 15-500 KVA DG set all as per manufacturers recommendations |
| 55 | Supply and filling Engine oil premium Quality 20W - 40 for DG set as specified and directed by Engineer-in-charge |
| 56 | supply and fixing in repairs to Air filter of 100 KVA / 62.5 KVA / 50 KVA DG set all as specified and directed by Engineer-in-charge |
| 57 | supply and fixing in repairs to Air filter of 160 KVA / 200 KVA / 250 KVA DG set all as specified and directed by Engineer-in-charge |
| 58 | supply and fixing in repairs to Air filter of 1010 KVA DG set all as specified and directed by Engineer-in-charge |
| 59 | supply and fixing in repairs to Air filter of 500 KVA DG set all as specified and directed by Engineer-in-charge |
| 60 | supply and fixing in repairs to Control Cables XLPE Insulated, armoured, PVC tape innersheathed with Solid Copper conductor of size 2.5 sq.mm x 6 core including necessary clamps if fixed on wall all as specified as directed. |
| 61 | S & Fixing in taking out ACB breaker for repair and servicing by disconnecting and dismantling the ACB breaker rating 2000 Amps / 1000 Amps make L&T by carrying out repair/ servicing , checking and renewing the defective shunt trip coil, closing coil, spring charging motor & UV trip coil 230 V AC , checking and rectifying the defective CTs and rectifying the mechanism operation including spring charge system, reinstalling the same in the panel and providing necessary line and connections all as directed by Engineer-in-charge.Note: Shunt release coil, closing coil, spring charging motor, microprocessor based protection release, indicator lamps will be measured and paid seperately. |
| 62 | Supply & fixing in repair of shunt release coil 240 V AC all as per sample and as specified |
| 63 | Supply & fixing in repair of Closing coil 240 V AC all as per sample and as specified |
| 64 | Supply & fixing in repair of undervoltage coil 240 V AC all as per sample and as specified |
| 65 | Supply & fixing in repair of spring charging motor suitable for fixing in ACB of make L&T C Series operated in 240 V AC supply all as specified |
| 66 | Supply & fixing in repair of microprocessor based protection release for ACB all as specified and as directed |
| 67 | Supply and fixing in repairs phase indicator lamps R, Y, B LED type |
| 68 | Supply and filling Engine oil 15W - 40 suitable for DG set of different make and model all as specified and directed by Engineer-in-charge |
| 69 | Supply and filling High Purity Diesel exhaust fluid sealed container meeting the requirement of ISO 22241 (AUS 32) used in diesel engine SCR emission systems complete all as specified and as directed by Engr-In-Charge. Please Enable Macros to View BoQ information |