|
| 1 | M&L for Comprehensive maintenance of ductable split type air condiioner of following capacity of any make complete all as specified and directed. The job includes as under :-(i) Inspection, checking, cleaning with soap water and ALSTA SHINE to the cooling coil and condenser unit.(ii) Inspection, checking and repairs of all electrical components.(iii) Servicing of blower motors by greasing, oiling and servicing by cleaning thoroughly air filter.(iv) During the servicing of the unit existing refrigerant (Gas) shall be pumped down and be kept in safe custody for reuse. Notes : (a) The job shall be carried out once in a every month in each location. (b) All unsv spare parts (except mentioned hereinafter in BOQ) is deemed to be be included in comprehensive maintenance. Nothing extra shall be paid by the depatment. |
| 2 | 3 TR to 5.5 TR (cleaning of AHU filter, grill, diffuser and outdoor unit 05 Nos). Location - PET CT, NECLEAR MEDICINE, RATINA CLINIC & CATH LAB |
| 3 | 7.5 TR to 11 TR (cleaning of AHU filter, grill, diffuser and outdoor unit 03 Nos). Location: CT SCAN |
| 4 | Dismantling of defective ductable split outdoor unit of any make & capacity upto 11.0 TR for thorough checking / repair of all accessories and components and reassembling the same after repairs/replacement of defective accessories / components and testing on completion including transportation to workshop and back complete all as specified and directedNotes : (i) Supplying & fixing of new accessories /components required for the system shall be measured & paid separately.(ii) Replacement of sealed compressor unit, painting etc shall be measured and paid separately.(iii) Old serviceable accessories/components obtained from dismantling shall be refixed as directed and labour charges for refixing shall be deemed to be included in the quoted unit rate. |
| 5 | S&F in repiars Reciprocating/rortary /harmatically sealed/ scroll/ screw compressor suitable for capacity 3 to 5.5 TR split type AC complete all as specified and directed.(Make:- Blue star/Kirloskar/LG/Carrier or equivalent as approved by GE.) |
| 6 | All as per BoQ Serial Item No.3 above but of capacity from 5.5 TR to 11.00 TR, ductable type complete all as specified and directed |
| 7 | S&F in repairs Aluminium fan blade suitable for following capacity of split /mega ductable split type AC complete all as specified and directed:- |
| 8 | Upto 5.5 TR (ductable type) |
| 9 | 5.5 TR to 11.00 TR (ductable type) |
| 10 | S&F in repairs running dual capacitor of following capacity complete all as specified and directed:-(Make:- Sarda/ Universal/Usha or equivalent as approved by GE.) |
| 11 | 2.5 MFD |
| 12 | 4 MFD |
| 13 | 8 MFD |
| 14 | 10 MFD |
| 15 | 12 MFD |
| 16 | 36+6 MFD |
| 17 | 40+6 MFD |
| 18 | 45+6 MFD |
| 19 | 50+6 MFD |
| 20 | 60+6 MFD |
| 21 | S&F in repairs Air break contactor of following capacity complete all as specified and directed:-(Make:- Havells/ Legrand/ Seimens/ L&T or equivalent as approved by GE.) |
| 22 | 40 Amps |
| 23 | 32 Amps |
| 24 | 25 Amps |
| 25 | 9 Amps |
| 26 | S&F in repairs MCB TPN of following capacity complete all as specified and directed :- |
| 27 | 40 Amps |
| 28 | 32 Amps |
| 29 | Taking out unserviceable blower motor from existing location of following capacity ductable outdoor unit & dismantling the blower motor, cutting/removing burnt copper wire and rewinding the same (of existing gauge) by super enamelled copper wire, varnishing heating and testing including replacement of unserviceable 2 nos. bearing of adequate size and reassembling the blower motor and fixing in the same location complete all as specified and directed:- |
| 30 | 5.5 TR (ductable ) |
| 31 | 5.5 TR to 11.00 TR (ductable ) |
| 32 | S&F in repairs Sensor upto 5.5 TR capacity Split type AC complete all as specified and directed.(Make:- Indfoss or equivalent as approved by GE.) |
| 33 | S&F in repairs Sensor above 5.5 TR to 11 TR capacity Split type AC complete all as specified and directed.(Make:- Indfoss or equivalent as approved by GE.) |
| 34 | S&F in repairs controller upto 5.5 TR capacity Split type AC complete all as specified and directed.(Make:- Indfoss or equivalent as approved by GE.) |
| 35 | S&F in repairs controller from 5.5 TR to 11 TR capacity Split type AC complete all as specified and directed.(Make:- Indfoss or equivalent as approved by GE.) |
| 36 | Taking down unserviceable condensing coil from outdoor unit; checking it & detecting the leakage and its necessary repair to be carried out and refixing in the same location of following capacity complete all as specified and directed:- |
| 37 | 5.5 TR (ductable ) |
| 38 | 5.5 to 11.0 TR (ductable ) |
| 39 | S&F in repairs V- Belt (Size- A-28 or as per suitable size) complete all as specified and as directed. |
| 40 | S&F in repairs timer of ductable split AC of capacity up to 11.0 TR complete all as specified and directed. |
| 41 | Dismantling the u/s copper wire and S&F the New copper wire of following complete all as specified and directed:- |
| 42 | 3 Core 4 sqmm |
| 43 | 3 core 6 Sqmm |
| 44 | S&F in repairs suction/discharge valve of following size complete all as specified and as directed:- |
| 45 | 1 1/8\\" |
| 46 | Supply & filling refrigerant gas for charging of 3 TR to 11.0 TR capacity mega and ductable split type air condition complete all as specified and directed. |
| 47 | S&F in repairs Copper pipe of following size complete all as specified and directed:- |
| 48 | 5/8 “ |
| 49 | S&F in repairs Insulation for cooling line complete all as specified and directed. |
| 50 | S&F in repairs MCCB, 3 pole, of breaking capacity 16 kA complete all as specified and as directed:- |
| 51 | 63 Amps |
| 52 | 40 Amps |
| 53 | M&L for comprehensive maintenance of cold storage/mortuary 4/6 body cabin of capacity 3 to 5 TR (motor and outdoor units - 03 Nos) of any make complete all as specified and directed. The job includes as under:-(i) Inspection, checking, cleaning with soap water and ALSTA SHINE to the evaporator coils and condenser unit.(ii) Inspection of compressor, oil level checking and repairs of all electrical components.(iii) Servicing of blower motors by greasing, oiling and thermostat calibration servicing by cleaning thoroughly air filter. (iv) During the servicing of the unit existing refrigerant (Gas) shall be pumped down and be kept in safe custody for reuse.Location : Patient Cook House, QM Ration Store, Path Lab, TEEC & Mortuary. Notes : (a) The job shall be carried out once in a every month in each location. (b) All unsv spare parts (except mentioned hereinafter in BOQ) is deemed to be be included in comprehensive maintenance. Nothing extra shall be paid by the depatment. |
| 54 | Disconnecting defective sealed comprressor unit 2.5 to 5.5 TR from existing cold storage from the system and S&F reconditioned sealed unit compressor of 2.5 to 5.5 TR in original position complete all as specified and directed. |
| 55 | S&F in repairs PUF Panel to cracked/damaged panels using polyurethane foam and sealant complete all as specified and directed. |
| 56 | S&F in repairs Sliding Door Hardware including realignment, wheel/gasket/handle complete all as specified and directed. |
| 57 | S&F in repairs Digital Temperature Controller suit for cold storage complete all as specified and directed. |
| 58 | M&L for Comprehensive maintenance of AC VRF Type of capacity 25 to 48 TR of of LG complete all as specified and directed. The job includes as under;-(i) Inspection, checking, cleaning with soap water and ALSTA SHINE chlorite to the cooling coils and condenser unit(ii) Inspection of compressor, oil level checking and repairs of all electrical components.(iii) Servicing of blower motors by greasing, oiling and thermostat calibration servicing by cleaning thoroughly air filter, (iv) During the servicing of the unit existing refrigerant (Gas) shall be pumped down and be kept in safe custody for reuse.(a) 48 TR (indoor 15 and outdoor unit 03 Nos at Asha School). (b) 25 TR (Indoor 10 and outdoor unit 02 nos at OPD Block) (c) 35 TR (Indoor 10 and outdoor unit 02 nos at MI Room) Notes : (a) The job shall be carried out once in a every month in each location. (b) All unsv spare parts (except mentioned hereinafter in BOQ) is deemed to be be included in comprehensive maintenance. Nothing extra shall be paid by the depatment. |
| 59 | S&F in repairs the following spare parts & consumables items complete all as specified and directed :- |
| 60 | Washable/reusable air filters for indoor units as required during AMC period. |
| 61 | Fan motor for indoor unit. |
| 62 | Fan motor for outdoor unit. |
| 63 | Fan blade in case of breakage or imbalance (indoor/outdoor). |
| 64 | Indoor unit PCB (in case of failure) |
| 65 | Outdoor unit PCB (in case of failure) |
| 66 | Refrigerant gas top-up (R410A) including leak test and vacuuming (as needed) |
| 67 | Copper pipe insulation (nitrile rubber type). |
| 68 | M&L for Comprehensive maintenance of AC plant 60 TR (of Make: Blue Star) at Radiation Oncology complete all as specified and directed. The job includes the following:- (a) Blue Star company representative shall check and render preventive maintenance service to all the equipments every month during the period of the contract. Blue Star company representative will also attend/arrange to attend all normal break-downs (if any,) on call basis. Checking the functioning of Chiller unit/Air Handling unit/Pumps/Cooling tower/Controls and all such equipment covered under the contract.(b) Free replacing of defective/worn out parts with new or repaired parts for compressor/thermostat/ cutouts as approved by Engineer-in-charge.(c) Repairing of equipment at site/service station as approved by Engineer-in-charge.(d) Descaling of condenser/chemical cleaning, shall be carried out once in a year, preferably during the winter months based on Blue Star company representative's assessment on working condition of plant. Additional descaling, if required shall not be charged extra. Pre-filter replacement shall be carried out on the basis of Blue Star company representative's assessment on its physical condition and working. |
| 69 | Contd/- (e) Replenishing refrigerant gas and compressor oil in the system arising out of system defect, excluding sealed compressor.(f) Checking of compressor for its proper working.(g) Annual pumping-down and restarting as and when required.(h) Checking of Microprocessor control panel, control boards, transducers of packaged chillers/condensing unit for their correctness and replace if necessary.(j) Replacing of parts due to normal wear and tear.(k) All compressor related activities shall be carried out on chargeable basis if required. The compressor shall not be covered under this item.(l) Replacement of minor electrical components such as relays, and contactors is deemed to be included in the quoted unit rate. |
| 70 | S&F in repairs the following spare parts & consumables items complete all as specified and directed :- |
| 71 | Washable/reusable air filters for indoor units as required during AMC period |
| 72 | Sensor |
| 73 | PCB (in case of failure) |
| 74 | Refrigerant gas top-up (R410A) including leak test |
| 75 | S&F in repairs thermal insulation on the sheet metal duct/pipe wrapped with Aluminium foil faced class \\"O\\" 25 mm thick closed cell nitrile rubber of 25 mm thickness complete all as specified and directed. |
| 76 | Supplying & filling in replacement Compressor oil suitable for package type AC complete all as specified and directed. |
| 77 | M&L for Descaling and cleaning of AHU coils of 60 TR package AC at Radiation Oncoloty by using suitable cleaning agent from outside cooling tubes from inside by flowing suitable cleainng agent in the tubes for removing all foreign material deposited in the coils and tubes complete all as specified and directed. |
| 78 | Supply, installing of 24 SWG galvanised Aluminium supply/return Air Duct with supports complete all as specified and directed. |
| 79 | S&F in repairs Digital Temperature Controller suit for package type AC complete all as specified and directed. |
| 80 | Supply, Installation & Commissioning of Aluminum power coated discrid grill of size 450mmx450mm complete all as specified and directed. Please Enable Macros to View BoQ information |