| 1 | Part A- Cost of Material For 11KV DP With AB Switch - 1 No. |
| 2 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 3 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required = ( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 4 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 5 | Supply & installation of AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each channel(GI) length 3 Mtr., 2 no's channel(GI) required =(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 6 | Supply & installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each channel(GI) length 0.35 mtr., 2 no's channel(GI) required =(9.56x2x0.35).Complete in all respect as per the approved technical specification and direction of EIC. |
| 7 | Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel(GI) length 0.8 Mtr..1 no's channel(GI) required =(7.14x0.8x1).Complete in all respect as per the approved technical specification and direction of EIC. |
| 8 | Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 3.0 Mtr., 4 no's channel(GI) required = (7.14x3x4). Complete in all respect as per the approved technical specification and direction of EIC. |
| 9 | Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 3.512 mtr.,4 nos angle(GI) required = (4x4.5x 3.512).Complete in all respect as per the approved technical specification and direction of EIC. |
| 10 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 11 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 12 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 13 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 14 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 15 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 16 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 17 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 18 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 19 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 20 | SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 21 | SITC of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 22 | SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 23 | Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC. |
| 24 | SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC. |
| 25 | Supply & installation of WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR.Complete in all respect as per the approved technical specification and direction of EIC. |
| 26 | Supply & installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC. |
| 27 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 28 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 29 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 30 | Part A- Cost of Civil Works. |
| 31 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard. |
| 32 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 33 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 34 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design. |
| 35 | Part B- Cost of Materials for 11 KV Pin Points - 0.005 CKM. |
| 36 | Supply & Stringing of 80 SQ.MM AAAC Conductor. Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | Part C- Cost of Supply Of Materials. |
| 38 | Supply of materials for 11kV, 3Core, 120 sqmm Aluminium, XLPE insulation armoured UG cable with one run spare including accessories . |
| 39 | Length of 11kV 3C, 120sqmm cable (Open trench- 700 Mtr) |
| 40 | Length of 11kV 3C, 120sqmm cable (HDD - 50 Mtr) |
| 41 | Supply of 11kV, 3Core, 120 sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 11.3kA and SC rating of Armour in kA- 12kA) as per the approved technical specification and direction of EIC. |
| 42 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 120 sqmm, aluminium UG cable kits. as per the approved technical specification and direction of EIC. |
| 43 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 120 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 44 | Supply of materials for High Density Polyethelene (HDPE) pipe 160mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC. |
| 45 | Part C- Cost of Erection Of Materials. |
| 46 | Erection, Commissioning, Testing of 11kV new line by 3core, 120sqmm, aluminium, XLPE UG cable one run spare. |
| 47 | Laying, Commissioning & Testing of 11kV, 3Core, 120sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC. |
| 48 | Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 120 sqmm, aluminium UG cable kits. as per direction of EIC. |
| 49 | Installation, Laying, Commissioning & Testing of 11 KV, 3 Core, 120 sqmm, XLPE U/G cable by HDD method with HDPE pipe (160 mm dia, PN8 PE80) including supply of HDPE Pipe as per direction of EIC. |
| 50 | Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC. |
| 51 | Part C- Cost of Civil Works. |
| 52 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
| 53 | Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length |
| 54 | Earth work excavation of soil. complete as per the direction of EIC. |
| 55 | Earth work excavation of hard rock. complete as per the direction of EIC. |
| 56 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 57 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for HT Cable Trench |
| 58 | Earth work excavation of normal soil Trench Dimension (1.6 mtr W X 1.775 mtr D). complete as per the direction of EIC. |
| 59 | Earth work excavation of hard rock Trench Dimension (1.6 mtr W X 1.775 mtr D). complete as per the direction of EIC. |
| 60 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 61 | PCC (1:3:6(M-10 Grade)) below trench (width 1500mm, thickness 75mm throughout). complete as per the direction of EIC. |
| 62 | Supply and erection of materil for RCC partition slab 750mmX100mm (M-25 grade) as per the direction of EIC. |
| 63 | Supply and erection of material for RCC trench, 150mm thick (M-25 grade). complete as per the direction of EIC. |
| 64 | Supply and erection of rod, bending, cuting and binding of RCC trench (65.23 KG/cum). complete as per the direction of EIC. |
| 65 | Supply and erection of rod, bending, cutting and binding of RCC slabs (67.8 KG/cum). complete as per the direction of EIC. |
| 66 | Centring & shuttering for mass concrete. complete as per the direction of EIC. |
| 67 | Structural steel work riveted (Channel(GI)- 75mmX40mmX4.8mm). (Flat(GI)- 75mmX6mm). complete as per the direction of EIC. |
| 68 | Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works. complete as per the direction of EIC. |
| 69 | Part D- Cost of meterial for HT Metering unit DP with AB Switch - 01 Nos |
| 70 | Supply and Installation of WPB Pole 160x152 (11mtr long , 30.44KG/MTR)-DP(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 71 | Supply and Installation of Top Channel (GI) 100X 50X6mm, 9.56 KG/Mtr., each Channel (GI) length 3 mtr., 2 no's Channel(GI) required =( 2x 9.56x3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 72 | Supply and Installation of Fish plate(GI) 50x6, 2.36kg/mtr ,each 0.280mtr length, 6 no's required=(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 73 | Supply and Installation of AB switch mounting channel(GI) 75x40x4.8mm, 7.14kg/mtr each channel (GI) lenth 3mtr ,2nos channel(GI) required=(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 74 | Supply and Installation of HT MU Mounting Channel (GI) 100X50X6mm, 9.56KG/Mtr, each Channel (GI) length 3 Mtr., 2 no's Channel(GI) required =(9.56x3x2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 75 | Supply and Installation of HG / DO Fuse Mounting Channel (GI) 75 x 40 x 4.8 mm GI Channel (GI) (3000 mm long) (7.14 KG/Mtr, 2 nos) (Each 2 x 3.00 x 7.14 = 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 76 | Supply and Installation of Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel (GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14).Complete in all respect as per the approved technical specification and direction of EIC. |
| 77 | Supply and Installation of Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6-1282 mm.each 2 nos.(4.5 K.g. per mtr.). Complete in all respect as per the approved technical specification and direction of EIC. |
| 78 | Supply and Installation MU and AB Switch Side Support Channel (GI) 100X50X6mm,9.56 KG/ Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel (GI) required =( 9.56x4x0.35). Complete in all respect as per the approved technical specification and direction of EIC. |
| 79 | Supply and Installation of Channel(GI) support for down pipe 75x40x4.8mm, 7.14kg/mtr ,each channel(GI) length 0.8 mtr, 1 no's channel(GI) required=(7.14x1x0.8). Complete in all respect as per the approved technical specification and direction of EIC. |
| 80 | Supply and Installation of Double pole Belting Channel(GI) 75x40x4.8mm,7.14kg/mtr ,each channel(GI) length 3 mtr, 2 no's channel(GI) required= (7.14x3x2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 81 | Supply and Installation 50x50x6mm GI Bracing angle , 4.5kg/mtr, each angle(GI) lenth 3.512 mtr, 2 no's Angle(GI) required=(4.5x3.512x2) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 82 | Supply and Installation of Danger plate ,2 nos .Complete in all respect as per the approved technical specification and direction of EIC. |
| 83 | Supply and Installation of Back clamp for danger plate 25x3mm, Flat(GI) 0.59kg/mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 84 | SITC of 55 sq.mm. AAAC XLPE covered conductor.Complete in all respect as per the approved technical specification and direction of EIC. |
| 85 | Supply and Installation of HT Stay clamp 50x 8mm,Flat(GI) 3.14kg/mtr, 0.551mtr length 2 no's qty required.(1pair).Complete in all respect as per the approved technical specification and direction of EIC. |
| 86 | Supply and Installation of HT stay set complete. Complete in all respect as per the approved technical specification and direction of EIC. |
| 87 | Supply and Installation of H.T. stay insulater Type C .Complete in all respect as per the approved technical specification and direction of EIC. |
| 88 | Supply and Installation of 7/10 swg Stay wire 15kg/stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 89 | Supply and Installation of GI pipe earthing 40mm ,3mtr long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 90 | Supply and Installation of 50x6mm,Flat(GI) for earthing, 2.36kg/mtr,(12.5 mtr for LA , 3mtr long for AB switch body,2.5 meter for mess formation and 2.5 meter for rising) =20.5x2.36 .Complete in all respect as per the approved technical specification and direction of EIC. |
| 91 | Supply and Installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty, required (2x3kg).Complete in all respect as per the approved technical specification and direction of EIC. |
| 92 | Supply and Installation of Black Clamp for anticlimbing device 25x3 mm. Flat(GI), 0.59Kg /Mtr. Flat(GI)) of 0.510mtr length 8 no's= (8x0.59x0.510).Complete in all respect as per the approved technical specification and direction of EIC. |
| 93 | SITC of Lightning Anester(12KV,10KA) (Station Class, class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 94 | SITC of AB Switch (11KV,200A,3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 95 | Supply and Installation of 11 KV pin insutator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 96 | Supply and Installation of HW Fitting(B&S) 70KN, 3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 97 | Supply and Installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 98 | Supply and Installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR. Complete in all respect as per the approved technical specification and direction of EIC. |
| 99 | Supply and Fixing of GI Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 100 | Supply and Installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC. |
| 101 | Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) as per Specification and the direction of EIC. |
| 102 | Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per Specification and the direction of EIC. |
| 103 | Supply and Installation of DO. Fuse (11 KV , 200a , 3Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 104 | Supply and Installation of 20 AMP Fuse Link. Complete in all respect as per the approved technical specification and direction of EIC. |
| 105 | Part -D : Cost of Civil Work |
| 106 | Fixing of complete 11kv line complete stay set include .1 )Turn buckle assembly 2)stay rod and stay plate 3)stay insulater 4)stay wire 5)stay clamps with BA WILL do the exavation including exavation,suply of 0.5cum cement concrete foundation 1:2:4 size(500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing and standard. |
| 107 | Concreting ratio 1:1.5(M-20 Grade) (500mmx 500mm x1800mm) =0.45 cum( Per pole). Complete in all respect as per the direction of EIC. |
| 108 | Couping ratio 1:1.5:3(M-20 Grade) (500mmx 500mmx450mm) =0.1125 cum( Per pole) .Complete in all respect as per the direction of EIC. |
| 109 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powdercalculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 110 | supply and erection of GI fencing with gate. Complete in all respect as per direction of EIC. |
| 111 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |