| 1 | Part A- Cost of Supply Of Materials. |
| 2 | Supply of materials for 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG cable with accessories. |
| 3 | Length of 11kV 3C, 400sqmm cable (Open trench- 100 Mtr) |
| 4 | Length of 11kV 3C, 400sqmm cable (HDD - 10 Mtr) |
| 5 | Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA- 15kA) as per the approved technical specification and direction of EIC. |
| 6 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 7 | Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC. |
| 8 | Part A- Cost of Erection Of Materials. |
| 9 | Erection, Commissioning, Testing of 11kV new line by 3core, 400sqmm, aluminium, XLPE UG cable. |
| 10 | Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC. |
| 11 | Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits. as per direction of EIC. |
| 12 | Installation, Laying, Commissionong & Testing of 11 KV, 3 Core,400 sqmm, XLPE UG cable by HDD method with HDPE pipe (200mm dia, PN8 PE80) including supply of HDPE pipe as required & as per direction of EIC. |
| 13 | Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench as per direction of EIC. |
| 14 | Part A- Cost of Civil Works. |
| 15 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
| 16 | Earth work excavation of soil (1mtr. width X 1mtr. depth) complete as per the direction of EIC. |
| 17 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 18 | Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench (1mtr. width). complete as per the direction of EIC. |
| 19 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.) as per the direction of EIC. |
| 20 | Supply and erection of cable Route Marker along the cable route at an interval of 30 mtrs with civil works as per the direction of EIC. |
| 21 | Part B- Cost of Material For 11KV DP Without AB Switch - 2 No. |
| 22 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 23 | Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 2.3mtr.,2 no's channel(GI) required =(2x9.56x2.3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 24 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 25 | Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 1.66 Mtr., 4 no's channel(GI) required = (7.14x1.66x4). Complete in all respect as per the approved technical specification and direction of EIC. |
| 26 | Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 2.671 mtr.,4 nos angle(GI) required = (4x2.67x4).Complete in all respect as per the approved technical specification and direction of EIC. |
| 27 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 28 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 29 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 30 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 31 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 32 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 33 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 34 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., ( 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 35 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 36 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 38 | Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC. |
| 39 | SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC. |
| 40 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 41 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 42 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 43 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 44 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 45 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 46 | Part B- Cost of Civil Works. |
| 47 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 48 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 49 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 50 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design.Complete in all respect as per the direction of EIC. |
| 51 | Part C- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 2 No. |
| 52 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 53 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 54 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 55 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 56 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 57 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 58 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 59 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 60 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 61 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 62 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 63 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 64 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 65 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 66 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 67 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 68 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 69 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 70 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 71 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 72 | Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 73 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 74 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 75 | Part C- Cost of Civil Works. |
| 76 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 77 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 78 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 79 | Part D- Cost of Materials for 11 KV Pin Points With WPB - 0.06 CKM. |
| 80 | Supply & Stringing of 100 SQ.MM AAAC XLPE Covered Conductor - 11 KV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 81 | Part E- Cost of Dismantling Of old Materials. |
| 82 | Dismantling of 11KV joist pole as per direction of EIC. |
| 83 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr as per direction of EIC. |
| 84 | Dismantling of 11KV bare conductor as per direction of EIC. |
| 85 | Dismantled of 11KV 9mtr joist pole as per direction of EIC. |
| 86 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |