|
| 1 | Operation of ETP including pumping of raw water from main sump & workshop. Dozing chemical pumping of treated water to Industrial/mines area by deploying sufficient man power in three shift including safety of entire plant and system etc(A) Pump operator/fitter for workshop |
| 2 | Operation of ETP including pumping of raw water from main sump & workshop. Dozing chemical pumping of treated water to Industrial/mines area by deploying sufficient man power in three shift including safety of entire plant and system etc(B) Operator for ETP (In three shift) |
| 3 | Operation of ETP including pumping of raw water from main sump & workshop. Dozing chemical pumping of treated water to Industrial/mines area by deploying sufficient man power in three shift including safety of entire plant and system etc(C) Helper/Chemical dozer(In three shift) |
| 4 | Operation of ETP including pumping of raw water from main sump & workshop. Dozing chemical pumping of treated water to Industrial/mines area by deploying sufficient man power in three shift including safety of entire plant and system etc(D) Chemist |
| 5 | Operation of ETP including pumping of raw water from main sump & workshop. Dozing chemical pumping of treated water to Industrial/mines area by deploying sufficient man power in three shift including safety of entire plant and system etc(E) Work supervisor |
| 6 | Supplying of chemicals for treatment of effluent as per specification (A) Ferric Alum (Alum to be used should be as per design recommendation of ETP having commercial strength i.e Alumna content not less than 1.5%) |
| 7 | Supplying of chemicals for treatment of effluent as per specification (B) Lime -Hudrated lime is to be used having commercial strength i.e Cao content not less than 60% |
| 8 | Supplying of chemicals for treatment of effluent as per specification (C) Polyelectrolyte. Solubility-soluble in water in all proportions. pH-3 to1.1. Specific gravity-1.00 to 1.10. Viscosity-As per manufacturer's recommendations for inductrial effulent. Toxicity-Product should be non-toxic and cerificate of Non-toxicity from standard laboratory by the manufacturer is mandatory. |
| 9 | Procurement of reagent, daily testing of raw and treated effluent as per norms, weekly testing from authorised laboratory for COD, pH and Oils & Grease and suspended solids) including the all accessories(For ETP). |
| 10 | Repair and maintenance of equipment such as pumps & motors including rewinding, replacing of bearing and all kind of valves, supply of lubricants, glands packing and gear oil as per requirement and as per instruction of EIC. The capacity of pumps existing at the site or 60 HP -3 nos, 10 HP-4 nos, 5 HP -3 nos, 3 HP-1 no. 2 HP-1 no. 1HP-9 no & 0.50 HP-3 nos. etc |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work. |
| 13 | White washing with lime to give an even shade : Old work (two or more coats) . |
| 14 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. (A) Dried Sludge |
| 15 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. (B) In or under water and/or liquid mud , including pumping out water as required |
| 16 | CARRIAGE OF MATERIALS Carriage of material by Mechanical Transport including loading, unloading and stackingEarth Lead - 2 Km |
| 17 | Extra for 1st additional lifts |
| 18 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |