| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 2 | Labour for filling available earth in foundation trenches, drains etc incl dressing, leveling as directed by engineer in charge complete job. |
| 3 | P/L, of dry stone soling duly hand packed in foundation trenches ,drains etc.incl.all costs and carriage complete job. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 aggregate 40mm nominal) using Nallah aggregates. incl. all carriage complete job |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: in 1:3:6 (1 Cement : 3 coarse sand : 6 aggregate 40 mm nominal size ) using Nallah aggregates. incl. all carriage complete job |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes. |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work. |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) using nallah aggregate incl all carriages complete. |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Providing and laying chisel dressed Devri Stone of size 300x200 mm face with 150 mm depth in cement mortar 1: 6 (1 cement : 6 coarse sand) upto plinth level including curing.One face dressed Fine chisel dressed |
| 12 | Extra for fine chisel dressed Devri Stone in square or rectangular Pillars |
| 13 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. |
| 14 | Removing roots, stumps and underground growth of trees, shrubs, bushes etc incl excavation around roots, cutting, pulling, dressing of surface, filling the pit with avilable earth, ramming, disposal of unserviceable material with in lead of 50 mts and as directed by engineer in charge complete job. |
| 15 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts |
| 16 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) all carriage complete. |
| 17 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 18 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. |
| 19 | Carriage of material by mechnical means.Steel from avg. lead of 85 KM. Please Enable Macros to View BoQ information |