| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m² on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge, in All kinds of soil. The cost includes Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. The cost also includes manual carriage, loading, unloading and stacking upto 50 m. |
| 2 | Providing and laying of stone soling including the cost of carriage, dressing, ramming, and watering of the same complete. |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. |
| 6 | Finishing of foundation with 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) |
| 7 | Steel reinforcement for R.C.C. work ready to use \\"cut and bend\\"rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Shifting of 625 KVA DG Set from GB pant Hospital to Chest Disease Hospital Srinagar. The job includes disconnecting of Cables from electric circuit and changeover and transporting DG and allied Material by means of Mechanical Crane . The job includes dismantaling of the installed chimney and transporting the same along with the DG set and allied accessories from GBH to CDH .The Job includes dismantling of chimney safely and placing the same in truck afterwards installing the same at CD hospital. The job further includes testing of the DG on load. All tool tackles technical manpower, consumables be arranged by the firm.The job also includes fitting of cable of 630 sqmm to be provided by the Deptt (all tools and tackles are to be provided by the firm) |
| 9 | Providing and Fitting of 1000 A, 3 Phase, 415 V, 4 Pole Onload Changeover Switch-Disconnector (Conforming to IEC 60947-3, IS/IEC 60947-3) with Sheet Steel Enclosure of thickness 1.6mm along with and allied works. All the tool tackles consumables be arranged by the firm. |
| 10 | Servicing by way of providing and fitting of a New OEM-recommended/Approved Lube Oil Filter LF670 as a replacement against existing ones |
| 11 | Servicing by way of providing and fitting of a New OEM-recommended/Approved Fuel Filter FS1000 as a replacement against existing ones |
| 12 | Servicing by way of providing and fitting of a New OEM-recommended/Approved Fuel Water eparator/Water filter having Part No 4072352 as a replacement against existing one |
| 13 | Servicing by way of providing and fitting of a New OEM-recommended/Approved Air Kit cleaner assembly with Primary Cartridge having Safety Cartridge as a replacement against existing ones |
| 14 | Servicing by way of providing and filling of a New OEM-recommended/Approved Lube Oil [C H/L 4 15W40] Valvoline Premium Blue 7800 as a replacement against existing one . |
| 15 | Cleaning the Radiator external assembly first by Dry cleaning through compressed air to blow out dust and debris from the radiator fins. Air is to be blown from the engine side outward to prevent pushing dirt deeper using a heavy-duty blower and allied tools, followed by wet cleaning using mild detergent at low-pressure water jet through the service pump to clean the fins, including use of a soft brush with low-pressure water spray to clean the fins. |
| 16 | Providing and filling of a New OEM recommended Coolant/anti-freeze/inhibitor corrosion [90 Litres ] after flushing the Cooling System by draining out the old coolant completely followed first by filling with clean water and run the engine for a few minutes, checking for any leakages from house pipes etc and then draining water again and then refilling with above recommended coolant with No load testing at first followeded by full load testing of the DG set at site. Please Enable Macros to View BoQ information |