| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed |
| 3 | Providing and laying stone of soling including supplying of stones |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc |
| 5 | Providing and laying in position cement concrete of specified grade 1:2:4 (1 cement:2Coarse Sand: 4 Crushed stone aggregate 20mm Nominal Size) including curing but excluding the cost of centring and shuttering. All work upto plinth level |
| 6 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement:4 Coarse Sand: 8 Crushed stone aggregate 40mm Nominal Size)including curing but excluding the cost of centring and shuttering. All work upto plinth level |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement in 1:1.5:3 nix using 20mm size Aggregate crushed |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered) Depth exceeding 3 m but not exceeding 4.50 m |
| 10 | Dewatering/Diversion charges for making ring bund/coffer dam and contineous pumping of water to keep the pit dry during concreating and stabilizing sides of trench bt timbering or Ec bags.complete Job |
| 11 | P/L of perforated Steel pipe of dia 100mm for draining water,perforation holes of size 10mm*5mm,thickness of pipe 5mm,along with applying a priming coat and paint,complete Job |
| 12 | Carriage of Materials from source to Dumping Site By Mechanical Transportation.Sand from 5Km |
| 13 | Stone Aggregate 20mm from 5Km |
| 14 | Stone Aggregate 40mm from 5Km |
| 15 | Nallah Stone by an Avg. lead of 5Km |
| 16 | Reinforcement Steel and Cement from 10km |
| 17 | Carriage of Materials by Manual Means Avg. lead of 50Mtrs a. Sand |
| 18 | Stone Aggregate 20mm |
| 19 | Stone Aggregate 40mm |
| 20 | Nallah Stone |
| 21 | Cement |
| 22 | Steel |
| 23 | Taking,Editing,Printing HD Photographs(6\\"x4\\") geotagged,before,during and after execution of work |
| 24 | Cost of Sign Board (2 X 2) all complete job as directed by engineer Incharge Please Enable Macros to View BoQ information |