|
| 1 | Cartage of the following material from center Stores, Asfabad, Firozabad or from any other place to dump site, (Distance 00.00 Km to 30.00 Km) including the work of its loading and unloading at the respective ends and also including the work of dragging etc and also including the cost of arrangement of laborer, T&P carrier etc required for proper completion of work. | Cartage of the following material from center Stores, Asfabad, Firozabad or from any other place to dump site, (Distance 00.00 Km to 30.00 Km) including the work of its loading and unloading at the respective ends and also including the work of dragging etc and also including the cost of arrangement of laborer, T&P carrier etc required for proper completion of work. |
| 2 | 8.5/9 meter long PCC pole | 8.5/9 meter long PCC pole |
| 3 | 11/13 meter long ST pole | 11/13 meter long ST pole |
| 4 | 10/16 KVA transformer | 10/16 KVA transformer |
| 5 | 25 KVA transformer | 25 KVA transformer |
| 6 | 63 KVA transformer | 63 KVA transformer |
| 7 | Weasal conductor, and other line material | Weasal conductor, and other line material |
| 8 | Drilling of hole in M. S. channel and angle for Double pole, guarding. Extra \\"T\\" | Drilling of hole in M. S. channel and angle for Double pole, guarding. Extra \\"T\\" |
| 9 | Opening of HT/LT fittings from the damaged single support of 8.5/9 meter long PCC pole at various places, Including the cost of arrangement of labourer, T&P etc required for proper completion of wark | Opening of HT/LT fittings from the damaged single support of 8.5/9 meter long PCC pole at various places, Including the cost of arrangement of labourer, T&P etc required for proper completion of wark |
| 10 | Making coils of spread and dismentalled conductor with utmost care for its maximum possible laying on the support or to placed in store. | Making coils of spread and dismentalled conductor with utmost care for its maximum possible laying on the support or to placed in store. |
| 11 | Safe placement of following from the above dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. | Safe placement of following from the above dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. |
| 12 | 8.5/9 meter long PCC pole | 8.5/9 meter long PCC pole |
| 13 | Safe placement of 11/13 meter long ST pole from the above dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. | Safe placement of 11/13 meter long ST pole from the above dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. |
| 14 | Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. | Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. |
| 15 | Erection of 8.5/9 meter long PCC pole including compete HT/LT/33 KV fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. | Erection of 8.5/9 meter long PCC pole including compete HT/LT/33 KV fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. |
| 16 | Erection of 11/13 meter long ST pole including compete HT/LT/33 KV fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc engi required for proper completion of work. | Erection of 11/13 meter long ST pole including compete HT/LT/33 KV fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc engi required for proper completion of work. |
| 17 | Installation and grouting of following as RESPO manual in ratio 1:4:8 in cement, sand and brick ballast. | Installation and grouting of following as RESPO manual in ratio 1:4:8 in cement, sand and brick ballast. |
| 18 | 11 KV Stay set | 11 KV Stay set |
| 19 | 33 KV Stay Set | 33 KV Stay Set |
| 20 | Straightening of tilted/bended 8.5/9 meter long PCC pole/11/13 meter long ST pole, as per RESPO norms. | Straightening of tilted/bended 8.5/9 meter long PCC pole/11/13 meter long ST pole, as per RESPO norms. |
| 21 | Installation of Extra \\"T\\" as per RESPO manual | Installation of Extra \\"T\\" as per RESPO manual |
| 22 | Re nozalling and tightening of stay, as per RESPO norms | Re nozalling and tightening of stay, as per RESPO norms |
| 23 | Chopping of trees | Chopping of trees |
| 24 | Replacement of following damaged fittings. | Replacement of following damaged fittings. |
| 25 | 11 KV pin insulator / 11 Kv Disc Insulator | 11 KV pin insulator / 11 Kv Disc Insulator |
| 26 | 33 KV pin insulator / 33 Kv Disc Insulator | 33 KV pin insulator / 33 Kv Disc Insulator |
| 27 | Replacement matereal Contrector arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. | Replacement matereal Contrector arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. |
| 28 | 11 KV cross arm holding clamp/ U Clamp / F Clamp with nut & bolt | 11 KV cross arm holding clamp/ U Clamp / F Clamp with nut & bolt |
| 29 | 33 KV cross arm holding clamp/ U Clamp / F Clamp with nut & bolt | 33 KV cross arm holding clamp/ U Clamp / F Clamp with nut & bolt |
| 30 | Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. | Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. |
| 31 | 10/16 KVA transformer | 10/16 KVA transformer |
| 32 | 25 KVA transformer | 25 KVA transformer |
| 33 | 63 KVA transformer | 63 KVA transformer |
| 34 | Laying, sagging and stringing and jumpering/ binding etc of the following conductor on the aforesaid newly erected Poles as pre RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc required for proper completion of work. | Laying, sagging and stringing and jumpering/ binding etc of the following conductor on the aforesaid newly erected Poles as pre RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc required for proper completion of work. |
| 35 | ACSR weasel conductor | ACSR weasel conductor |
| 36 | Dog Conductor | Dog Conductor |
| 37 | AB Cable | AB Cable |
| 38 | Re-sagging, binding and jumpering of loose following conductor as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P carrier etc required for proper completion of work. | Re-sagging, binding and jumpering of loose following conductor as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P carrier etc required for proper completion of work. |
| 39 | ACSR weasel conductor | ACSR weasel conductor |
| 40 | Dog Conductor | Dog Conductor |
| 41 | AB Cable | AB Cable |
| 42 | Tightening of loose guarding | Tightening of loose guarding |