| 1 | EDD-CHINOUR |
| 2 | Safe Carriage of Following materials from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.) |
| 3 | PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF TRIPLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB) |
| 4 | PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF DOUBLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB) |
| 5 | PROVIDING AND INSTALLING OF COPPER BUS BAR 50*6 MM |
| 6 | PROVIDING AND INSTALLING OF L PIECE COPPER 225*50*10 MM |
| 7 | PROVIDING AND INSTALLING OF ALLUMINIUM LUGS 240/400/630 SQ MM |
| 8 | PROVIDING AND INSTALLING OF FUSE WIRE (26 SWG) |
| 9 | PROVIDING AND INSTALLING OF TAIL LESS UNIT STRUCTURE MADE OF MS CHANNEL 45*45*5 MM |
| 10 | EDD-SHAHAJAHANPUR |
| 11 | Safe Carriage of Following materials from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.) |
| 12 | PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF SINGLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB) |
| 13 | PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF TRIPLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB) |
| 14 | PROVIDING AND INSTALLATION OF LT PROTECTION UNIT/TAILLESS UNIT OF DOUBLE CIRCUIT TAIL LESS UNIT CONTAINIG OF 06+06 NOS INCOMING+ OUTGOING STUDDS OF 630/500/300/100 AMP/650 VOLT, MADE OUT OF BRASS & 03+03 BACK ENTRY MADE OF BRASS AND HAVING OF 07+07 LT PORCELIN INSULATOR FIX FOR HOLDING CLAMPS MADE OF MS TRIP. ALL THE TAIL LESS UNITS SHOULD BE CONNECTED WITH ONLY FROM COPPER BUS BAR OF SIZE 50*6 MM, 16 TO 18 INCHES LONG (AS PER SITE REQUIREMENT)(COMPLETE JOB) |
| 15 | PROVIDING AND INSTALLING OF COPPER BUS BAR 50*6 MM |
| 16 | PROVIDING AND INSTALLING OF ALLUMINIUM LUGS 240/400/630 SQ MM |
| 17 | PROVIDING AND INSTALLING OF FUSE WIRE (26 SWG) |
| 18 | PROVIDING AND INSTALLING OF TAIL LESS UNIT STRUCTURE MADE OF MS CHANNEL 45*45*5 MM Please Enable Macros to View BoQ information |