Sales : +91-777 804 8217
| Sl. No. | Item Title | Item Description |
| 1 | Single Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated single tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport Approximate dimensior upto 2200 X 850 X 200 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | Single Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated single tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport Approximate dimensior upto 2200 X 850 X 200 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 2 | II Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated II tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mm. Top bunk should be foldable, folding down to double sofa when not in use.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. Each set of Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank | II Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated II tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mm. Top bunk should be foldable, folding down to double sofa when not in use.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17. Each set of Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank |
| 3 | III Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated III tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | III Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated III tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole. Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 4 | IV Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated IV tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole, Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | IV Tier Bunks (new)Old item to be removed, Provision and fitment of new CRCA powder coated IV tier bunk with 04 Storage arrangement at bottom, bunk light, bunk fan, magazine pouch for width, bunk curtains, curtain channel with sliding hooks to hang curtains. Bunk lights & switches to be Dipole, Separate switches for lights and sockets. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimension upto 2200 X 850 X 200 mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 5 | Wardrobe locker (New)Provision and fitment of CRCA powder coated item with locking arrangements, 3 shelves with provision to hang clothes in one shelf, SS mirror adjustable racks, 01 safe locker and associated fittings.Size of the locker upto 500 X 600 X 1850 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications forHabitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment däed 05 Apr 17.Drawer/shelfs load test of 50kgs | Wardrobe locker (New)Provision and fitment of CRCA powder coated item with locking arrangements, 3 shelves with provision to hang clothes in one shelf, SS mirror adjustable racks, 01 safe locker and associated fittings.Size of the locker upto 500 X 600 X 1850 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications forHabitability upgradation Issue 2, 2013 & NC/Policy/H-121/Equipment däed 05 Apr 17.Drawer/shelfs load test of 50kgs |
| 6 | Working Table (new) (Big)Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers with channels of high quality telescopic self locking ball slides, locking arrangements, foot rest and computer securing arrangements. Drawers load test of 20 kgs, with separate lock for each drawer. Dimensions upto 1700 X 700 X 770 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Locks test certificate,Drawer load test of 20kgs | Working Table (new) (Big)Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers with channels of high quality telescopic self locking ball slides, locking arrangements, foot rest and computer securing arrangements. Drawers load test of 20 kgs, with separate lock for each drawer. Dimensions upto 1700 X 700 X 770 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Locks test certificate,Drawer load test of 20kgs |
| 7 | Working Table (new) (Small)Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers with channels of high quality telescopic self locking ball slides, locking arrangements, foot rest and computer securing arrangements. Drawers load test of 20 kgs,with separate lock for each drawer. Dimensions upto 1500 X 500 X 770 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Locks test certificate,Drawer load test of 20kgs | Working Table (new) (Small)Old item to be removed, Provision and fitment of new CRCA powder coated table with drawers with channels of high quality telescopic self locking ball slides, locking arrangements, foot rest and computer securing arrangements. Drawers load test of 20 kgs,with separate lock for each drawer. Dimensions upto 1500 X 500 X 770 mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Locks test certificate,Drawer load test of 20kgs |
| 8 | Executive chairs (new)Old item to be removed, Provision and Fitment of new Executive chair with cloth cover, head rest and arm rests. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR Cloth certificate to be submitted | Executive chairs (new)Old item to be removed, Provision and Fitment of new Executive chair with cloth cover, head rest and arm rests. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR Cloth certificate to be submitted |
| 9 | Non-Executive chairs (new)Old item to be removed, Provision and Fitment of new Non-executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR Cloth certificate to be submitted | Non-Executive chairs (new)Old item to be removed, Provision and Fitment of new Non-executive chair with cloth cover and arm rests. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR Cloth certificate to be submitted |
| 10 | Folding chair (new)Old item to be removed, Provision and Fitment of new SS foldable chairs with cushion. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Folding chair (new)Old item to be removed, Provision and Fitment of new SS foldable chairs with cushion. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 11 | Wash Basin with cabinet (new)Old item to be removed, Provision and fitment of new SS cabinet with SS wash basin depth 200 mm, bottle trap,toiletry rack, storage drawer, towel hanger. Necessary arrangements be provided along with FW tank with SS mirror mounted on cabinet, taps, pipelines and plumbing works including fresh water isolating valve replacement. Firm to land the removed items at dockyard scrapyard by their own transport. No plastic plumbing items to be used. All SS fasteners. Metal braided pipes and silicon sealant to be used. 385 X 500 X850 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Plumbing press fir, Cu.Ni pipelines pressure test certificate to be submitted | Wash Basin with cabinet (new)Old item to be removed, Provision and fitment of new SS cabinet with SS wash basin depth 200 mm, bottle trap,toiletry rack, storage drawer, towel hanger. Necessary arrangements be provided along with FW tank with SS mirror mounted on cabinet, taps, pipelines and plumbing works including fresh water isolating valve replacement. Firm to land the removed items at dockyard scrapyard by their own transport. No plastic plumbing items to be used. All SS fasteners. Metal braided pipes and silicon sealant to be used. 385 X 500 X850 mm.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Plumbing press fir, Cu.Ni pipelines pressure test certificate to be submitted |
| 12 | Towel Hanger (new)Old item to be removed, Provision and fitment of SS towel hanger rods.SS 304, Dia 20 - 25 mm, 600 mm length. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Towel Hanger (new)Old item to be removed, Provision and fitment of SS towel hanger rods.SS 304, Dia 20 - 25 mm, 600 mm length. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 13 | Cloth Hook (new)Provision and fitment of new SS 304 double hooks of reputed brand.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Cloth Hook (new)Provision and fitment of new SS 304 double hooks of reputed brand.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 14 | NWT Door (new)Old item to be removed, Provision and fitment of new NWT Door with lock, peep hole ( as per requirement), emergency escape, handles and bulkhead frame double skin CRCA powder coated (IS 513D grade) with 7 lever mortise lock of reputed make, Door closure and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. Dimension as per on ground requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock and door closure to be submitted | NWT Door (new)Old item to be removed, Provision and fitment of new NWT Door with lock, peep hole ( as per requirement), emergency escape, handles and bulkhead frame double skin CRCA powder coated (IS 513D grade) with 7 lever mortise lock of reputed make, Door closure and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. Dimension as per on ground requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock and door closure to be submitted |
| 15 | Sliding doorOld item to be removed, Provision and fitment of new NWT Door with lock, g'ass peep hole ( as per requirement), emergency escape, handles and bulkhead frame double skin CRCA powder coated (IS 513D grade) with 7 lever mortise lock of reputed make, sliding channels, sturdy frame and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. Approximale dimensions 1700 X 1830 mm as per insitu requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock and door closure to be submitted | Sliding doorOld item to be removed, Provision and fitment of new NWT Door with lock, g'ass peep hole ( as per requirement), emergency escape, handles and bulkhead frame double skin CRCA powder coated (IS 513D grade) with 7 lever mortise lock of reputed make, sliding channels, sturdy frame and other associated fittings. Firm to land the removed items at dockyard scrapyard by their own transport. Approximale dimensions 1700 X 1830 mm as per insitu requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock and door closure to be submitted |
| 16 | File Cabinet (new)Old item to be removed, Provision and fitment of new CRCA powder coated file cabinet with lock and sliding door / hinge door/ dampers with CRCA material or transparent acrylic sheet of 5mm thickness based on insitu requirement. Approx dimensions 1000 x 400 x 450 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock, Cabinet load test of 50kgs | File Cabinet (new)Old item to be removed, Provision and fitment of new CRCA powder coated file cabinet with lock and sliding door / hinge door/ dampers with CRCA material or transparent acrylic sheet of 5mm thickness based on insitu requirement. Approx dimensions 1000 x 400 x 450 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock, Cabinet load test of 50kgs |
| 17 | Shoe Rack (new)Old item to be removed, Provision and fitment of new CRCA powder coated 12 pair shoe racks with 4 partitions and latching arrangement, holes for ventilation. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimensions 1400 X 200 X 800 mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Shoe Rack (new)Old item to be removed, Provision and fitment of new CRCA powder coated 12 pair shoe racks with 4 partitions and latching arrangement, holes for ventilation. Firm to land the removed items at dockyard scrapyard by their own transport. Approximate dimensions 1400 X 200 X 800 mmAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 18 | SS Mirrors (new) ( Big)Old item to be removed, Provision and fitment of new mirrors, SS 304 finish with frame width 15 mm.Size of the mirror 1400 X 400mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Mirrors (new) ( Big)Old item to be removed, Provision and fitment of new mirrors, SS 304 finish with frame width 15 mm.Size of the mirror 1400 X 400mm. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 19 | SS Mirrors (new) ( small)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm. size of the mirror 500 X 400 mm. Firm to land the removed items at dockyard scrapyard by their own transport As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | SS Mirrors (new) ( small)Old item to be removed, Provision and fitment of new mirrors SS 304 finish with frame width 15 mm. size of the mirror 500 X 400 mm. Firm to land the removed items at dockyard scrapyard by their own transport As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 20 | Sofa Single Seater (new)Old item to be removed, Provision and fitment of new single seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements. Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa Single Seater (new)Old item to be removed, Provision and fitment of new single seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements. Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 21 | Sofa 2 Seater (new)Old item to be removed, Provision and fitment of new 2 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 2 Seater (new)Old item to be removed, Provision and fitment of new 2 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 22 | Sofa 3 Seater (new)Old item to be removed, Provision and fitment of new 3 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 3 Seater (new)Old item to be removed, Provision and fitment of new 3 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 23 | Sofa 4 Seater (new)Old item to be removed, Provision and fitment of new 4 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 4 Seater (new)Old item to be removed, Provision and fitment of new 4 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangementsMat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 24 | Sofa 5 Seater (new)Old item to be removed, Provision and fitment of new 5 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 5 Seater (new)Old item to be removed, Provision and fitment of new 5 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 25 | Sofa 6 Seater (new)Old item to be removed, Provision and fitment of new 6 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 6 Seater (new)Old item to be removed, Provision and fitment of new 6 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 26 | Sofa 7 Seater (new)Old item to be removed, Provision and fitment of new 7 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted | Sofa 7 Seater (new)Old item to be removed, Provision and fitment of new 7 seater Sofa with required fittings, cushioning and upholstery of reputed brand and securing arrangements Mat: CRCA Powder coated, FR Seat coverFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs to be submitted |
| 27 | CRCA Paneling (New)Old item to be removed, Provision and fitment of new CRCA powder coated 0.9 mm thick panels with required inspection windows and cututs for switches, lights, sockets etc. Design as finalised by ship staffAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted | CRCA Paneling (New)Old item to be removed, Provision and fitment of new CRCA powder coated 0.9 mm thick panels with required inspection windows and cututs for switches, lights, sockets etc. Design as finalised by ship staffAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted |
| 28 | Sandwich panelling SS 25 mm (New)Old panels to be removed. New 25 mm mineral wool covered with SS 0.6 mm thick sandwich panel to be installed with associated channels, grid welding work . Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted | Sandwich panelling SS 25 mm (New)Old panels to be removed. New 25 mm mineral wool covered with SS 0.6 mm thick sandwich panel to be installed with associated channels, grid welding work . Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted |
| 29 | Sandwich panelling SS 50 mm (new)Old panels to be removed. New 50 mm mineral wool covered With SS 0.6 mm thick sandwich panel to be installed with associated channels, grid welding work . Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society.Firm to land the removed items at dockyard scrap yard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted | Sandwich panelling SS 50 mm (new)Old panels to be removed. New 50 mm mineral wool covered With SS 0.6 mm thick sandwich panel to be installed with associated channels, grid welding work . Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society.Firm to land the removed items at dockyard scrap yard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted |
| 30 | Sandwich panelling CRCA 25 mm (new) Old panels to be removed. New 25 mm mineral wool covered with CRCA powder coated (IS 13871:2021), 0.6 mm thick, sandwich panel to be installed with associated channels, grid welding work. Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted | Sandwich panelling CRCA 25 mm (new) Old panels to be removed. New 25 mm mineral wool covered with CRCA powder coated (IS 13871:2021), 0.6 mm thick, sandwich panel to be installed with associated channels, grid welding work. Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted |
| 31 | Sandwich panelling CRCA 50 mm (New) Old panels to be removed, New 50 mm mineral wool covered with CRCA powder coated (IS 13871 :2021), 0.6 mm thick, sandwich panel to be installed with associated channels, grid welding work. Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted | Sandwich panelling CRCA 50 mm (New) Old panels to be removed, New 50 mm mineral wool covered with CRCA powder coated (IS 13871 :2021), 0.6 mm thick, sandwich panel to be installed with associated channels, grid welding work. Panel conforming to IS 513-D/ IS 277 or equivalent international standards, fire resistant A 15 class, certified by Classification society. Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Material certificate, Batch no, Make etc to be submitted |
| 32 | Bar counter (New)Old item to be removed, Provision and fitment of new bar counter made of CRCA/FR material. Design to be confirmed from SS. Bar counter should have lockers below, drawers, glass cabinets, glass holders, glass hangers, show lights for bar, 06 in nos chairs etc.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate to be submitted | Bar counter (New)Old item to be removed, Provision and fitment of new bar counter made of CRCA/FR material. Design to be confirmed from SS. Bar counter should have lockers below, drawers, glass cabinets, glass holders, glass hangers, show lights for bar, 06 in nos chairs etc.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate to be submitted |
| 33 | Chart table (New)Old item to be removed, Provision and fitment of new CRCA power coated tables with stowage arrangement at bottom with heavy duty channels for drawers. Approx dimensions : 2500 x 2000 x 1500mm.Storage racks and Final dimensions as per insitu requirementsFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate to be submitted | Chart table (New)Old item to be removed, Provision and fitment of new CRCA power coated tables with stowage arrangement at bottom with heavy duty channels for drawers. Approx dimensions : 2500 x 2000 x 1500mm.Storage racks and Final dimensions as per insitu requirementsFirm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test of 50 kgs, Locks cycles certificate to be submitted |
| 34 | Kit Locker (New)Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle, Approx dimensions upto 915 x 550 x 550 mm with secret locker and separate locking arrangement.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers /shelfs load test of 50 kgs certificate to be submitted | Kit Locker (New)Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle, Approx dimensions upto 915 x 550 x 550 mm with secret locker and separate locking arrangement.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers /shelfs load test of 50 kgs certificate to be submitted |
| 35 | Routine locker (New)Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle. Approx dimensions upto 400 x 450 x 225 mm.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers /shelfs load test of 30 kgs certificate to be submitted | Routine locker (New)Old item to be removed, Provision and fitment of CRCA powder coated kit locker with door and handle. Approx dimensions upto 400 x 450 x 225 mm.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers /shelfs load test of 30 kgs certificate to be submitted |
| 36 | Teapoy (New)Old item to be removed, Provision and fitment of new CRCA powder coated teapoy with storage and locker at bottom.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Load test for storage channel certificate to be submitted | Teapoy (New)Old item to be removed, Provision and fitment of new CRCA powder coated teapoy with storage and locker at bottom.Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Load test for storage channel certificate to be submitted |
| 37 | Book Shelf (New)Old item to be removed, Provision and fitment of new CRCA powder coated book shelf with locking arrangement , with channels of high quality telescopic self locking ball slides.Approximate dimensions 1000 X 500 X 350 mm dimensions. No of partitions as per SS requirement.Firm to land the removed items et dock ard scra ard their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs to be submitted | Book Shelf (New)Old item to be removed, Provision and fitment of new CRCA powder coated book shelf with locking arrangement , with channels of high quality telescopic self locking ball slides.Approximate dimensions 1000 X 500 X 350 mm dimensions. No of partitions as per SS requirement.Firm to land the removed items et dock ard scra ard their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs to be submitted |
| 38 | Entertainment centre (New)Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fitttings and requisite stiffening. 03 Racks to be provided for setup box etc with transparent covers. As per insitu requirementsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks to be submitted | Entertainment centre (New)Old item to be removed, Provision and fitment of new CRCA powder coated item with locking arrangement and associated fitttings and requisite stiffening. 03 Racks to be provided for setup box etc with transparent covers. As per insitu requirementsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks to be submitted |
| 39 | Dining table (New)Old item to be removed, Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fitttings (Size: 2000 x 800 x 800mm) Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Dining table (New)Old item to be removed, Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fitttings (Size: 2000 x 800 x 800mm) Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 40 | Dining Chair (New)Old item to be removed, Provision and fitment of new CRCA powder coated chairs with back rest and cushions and associated fittings. To be load tested to 100 kgDimensions as per SS requirementFirm to land the removed items at dock ard scrap yard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Dining Chair (New)Old item to be removed, Provision and fitment of new CRCA powder coated chairs with back rest and cushions and associated fittings. To be load tested to 100 kgDimensions as per SS requirementFirm to land the removed items at dock ard scrap yard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 41 | CO Executive Chair (New)Old item to be removed, Provision and fitment of new item with hand rest, back rest, adjustable height, wheels and associated fitttings of reputed brandFirm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | CO Executive Chair (New)Old item to be removed, Provision and fitment of new item with hand rest, back rest, adjustable height, wheels and associated fitttings of reputed brandFirm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 42 | Working table for CO (New)Provision and fitment of new item with wooden / marble finish ( as per requiremnt) locking arrangement, drawers with channels , foot rest, acrylic transparent doors and associated fitttings.Firm to land the removed items at dockyard scrapyard by their own transport.Approxmate dimensions upto 1500 x 700 x 750 mm, layout as per insitu requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, drawers/self load test of 20 Kgs | Working table for CO (New)Provision and fitment of new item with wooden / marble finish ( as per requiremnt) locking arrangement, drawers with channels , foot rest, acrylic transparent doors and associated fitttings.Firm to land the removed items at dockyard scrapyard by their own transport.Approxmate dimensions upto 1500 x 700 x 750 mm, layout as per insitu requirementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, drawers/self load test of 20 Kgs |
| 43 | Bridge CO Chair (New)Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, revolving, locking arrangement and associated fitttings Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Bridge CO Chair (New)Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, revolving, locking arrangement and associated fitttings Firm to land the removed items at dockyard scrapyard by their own transport.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 44 | QM Chair (New)Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, locking arrangement and associated fitttingsFirm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | QM Chair (New)Old item to be removed, Provision and fitment of new fixed chair with hand rest, back rest, height adjustable, locking arrangement and associated fitttingsFirm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 45 | Cap & Coat hook (New)Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fitttingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Cap & Coat hook (New)Provision and fitment of new SS/CRCA powder coated item with locking arrangement and associated fitttingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 46 | Pistol cupboard/Safe locker / pigeon rack with 16 holes (New)Old item to be removed, Provision and fitment of new reputed make item with locking arrangement and associated fitttingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock to be submitted | Pistol cupboard/Safe locker / pigeon rack with 16 holes (New)Old item to be removed, Provision and fitment of new reputed make item with locking arrangement and associated fitttingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock to be submitted |
| 47 | KeyboardProvision and fitment of CRCA powder coated key board covered with perspex sheet transparent door. Approx size 400 X 550 mm with provision of 25 hooksAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock to be submitted | KeyboardProvision and fitment of CRCA powder coated key board covered with perspex sheet transparent door. Approx size 400 X 550 mm with provision of 25 hooksAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for lock to be submitted |
| 48 | Degutting of items : Bunks (1-4 Tier) / Work table/NWT Door/Wardrobe/ Book rack/Locker/Cupboard/Entertainment centre/Sofa/wash basin/Boards etc.Removal of existing items and associated fittings, Firm to land the removed items dockyard scrap yard by their own transport As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Degutting of items : Bunks (1-4 Tier) / Work table/NWT Door/Wardrobe/ Book rack/Locker/Cupboard/Entertainment centre/Sofa/wash basin/Boards etc.Removal of existing items and associated fittings, Firm to land the removed items dockyard scrap yard by their own transport As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 49 | Regutting of items : Bunks (1-4 Tier) / Work table/NWT Door/Wardrobe/ Book rack/Locker/Cupboard/Entertainment centre/Sofa/wash basin/Boards etc.Fitment of existing items and associated fittings,Item provision and location marked by SSAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Regutting of items : Bunks (1-4 Tier) / Work table/NWT Door/Wardrobe/ Book rack/Locker/Cupboard/Entertainment centre/Sofa/wash basin/Boards etc.Fitment of existing items and associated fittings,Item provision and location marked by SSAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 50 | CRCA/ SS Paneling (repair)Degutting/Repair of damaged existing panelsenewal of cutouts whereever required. Fitment of existing panels with required inspection windows and cutputs for switches, lights. sockets etc and required corner joints replacement and welding works to be undertaken post required repairs and CRCA Powder coating. Design as finalised by ship staff.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | CRCA/ SS Paneling (repair)Degutting/Repair of damaged existing panelsenewal of cutouts whereever required. Fitment of existing panels with required inspection windows and cutputs for switches, lights. sockets etc and required corner joints replacement and welding works to be undertaken post required repairs and CRCA Powder coating. Design as finalised by ship staff.Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 51 | Sandwich panelling (repair)Repair of damaged existing panel and renewal of cutouts wherever required. Repair / renewal of grid work as required. Thickness 25 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Sandwich panelling (repair)Repair of damaged existing panel and renewal of cutouts wherever required. Repair / renewal of grid work as required. Thickness 25 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 52 | Sandwich panelling (repair)Repair of damaged existing panel and renewal of cutouts wherever required. Repair / renewal of grid work as required, thickness 50 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Sandwich panelling (repair)Repair of damaged existing panel and renewal of cutouts wherever required. Repair / renewal of grid work as required, thickness 50 mm. Firm to land the removed items at dockyard scrapyard by their own transportAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 53 | Single Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank.be submitted | Single Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank.be submitted |
| 54 | II Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Polocy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | II Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013 & NC/Polocy/H-121/Equipment dated 05 Apr 17.Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 55 | III Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | III Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 56 | IV Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. | IV Tier Bunks (repair)Degutting and refitment of existing bunks post powder coating and all necessary repairs. Repair/replacement/renewal of magazine pouches, fall guards with 2mm guage and slide and lock arrangement, bottle holder. bunk fan, bunk lights, curtains.curtain rod SS 304 dia 20-25mm,1.6 mm thickness and sliding arrangements of bunk drawers with separate locking arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Bunk and drawers load test of 100kgs and 50kgs. Three stiffners for bunk plank. |
| 57 | Wardrobe locker 1 (repair)Degutting and refitment of existing locker post powder coating and necessary replacement of door, handle, lock, inbuilt safe, shelves and SS polished mirror. Provision of additional shelf if required.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawer/shelfs load test of 50 kgs | Wardrobe locker 1 (repair)Degutting and refitment of existing locker post powder coating and necessary replacement of door, handle, lock, inbuilt safe, shelves and SS polished mirror. Provision of additional shelf if required.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawer/shelfs load test of 50 kgs |
| 58 | Working Table (repair)Degutting of existing table and re fitment post necessary renewal of CRCA powder coating, locking arrangements, sliding channels and computer securing arrangements. Change of wooden top/ frames to CRCA if requiredAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks,drawer/shelfs load test of 20 kgs | Working Table (repair)Degutting of existing table and re fitment post necessary renewal of CRCA powder coating, locking arrangements, sliding channels and computer securing arrangements. Change of wooden top/ frames to CRCA if requiredAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks,drawer/shelfs load test of 20 kgs |
| 59 | Executive chairs (repair)Repair and re fitment of Executive chair with cloth cover and arm restsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Executive chairs (repair)Repair and re fitment of Executive chair with cloth cover and arm restsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 60 | Non-Executive chairs (repair)Repair and re fitment of Executive chair with cloth cover and arm restsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Non-Executive chairs (repair)Repair and re fitment of Executive chair with cloth cover and arm restsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 61 | Folding chair (repair)Repair and re fitment of new SS foldable chairs with cushionAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Folding chair (repair)Repair and re fitment of new SS foldable chairs with cushionAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 62 | Wash Basin with cabinet (repair)Degutting of existing cabinet, repair and re fitment of SS wash basin with cabinet post necessary buffing and cleaning, toiletry rack, storage drawer, towel hanger , replacement of SS mirror. Necessary arrangements be provided along with FW tank, taps, pipelines and plumbing worksAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Plumbing press fit, Cu.Ni pipelines pressure test certificate | Wash Basin with cabinet (repair)Degutting of existing cabinet, repair and re fitment of SS wash basin with cabinet post necessary buffing and cleaning, toiletry rack, storage drawer, towel hanger , replacement of SS mirror. Necessary arrangements be provided along with FW tank, taps, pipelines and plumbing worksAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Plumbing press fit, Cu.Ni pipelines pressure test certificate |
| 63 | NWT Door (repair)Degutting of existing door and re fitment of existing NWT Door with new lock & new door closure, emergency escape, handles and bulkhead frame double skin CRCA powder coated with 7 lever mortise lock. Provision of kick out panel/ emergency door if required. Change of wooden /damaged frame to CRCA frameAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Lock certificate to be submitted | NWT Door (repair)Degutting of existing door and re fitment of existing NWT Door with new lock & new door closure, emergency escape, handles and bulkhead frame double skin CRCA powder coated with 7 lever mortise lock. Provision of kick out panel/ emergency door if required. Change of wooden /damaged frame to CRCA frameAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Lock certificate to be submitted |
| 64 | File Cabinet (repair)Degutting of item and re fitment of existing item post required repairs and CRCA powder coating with lock and sliding door / acrylic sheet as per Insitu design.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Lock certificate, drawer/shelf load test of 20kgs to be submitted | File Cabinet (repair)Degutting of item and re fitment of existing item post required repairs and CRCA powder coating with lock and sliding door / acrylic sheet as per Insitu design.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Lock certificate, drawer/shelf load test of 20kgs to be submitted |
| 65 | Shoe Rack (repair)Degutting of item and fitment of item post necessary repairs and CRCA powder coated with latching arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Shoe Rack (repair)Degutting of item and fitment of item post necessary repairs and CRCA powder coated with latching arrangementAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 66 | Sofa Single Seater (repair) Degutting and fitment of single seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat : CRCA Powder coated ,FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa Single Seater (repair) Degutting and fitment of single seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat : CRCA Powder coated ,FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 67 | Sofa 2-Seater (repair)Degutting and fitment of 2 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated, FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 2-Seater (repair)Degutting and fitment of 2 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated, FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 68 | Sofa 3-Seater (repair)Degutting and fitment of 3 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated FR Seat cover.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 3-Seater (repair)Degutting and fitment of 3 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated FR Seat cover.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 69 | Sofa 4-Seater (repair)Degutting and fitment of 4 Seater Sofa with required fittings and secunng arrangements post necessary repairs and renewal of cuhions and upholistery. Mat: CRCA Powder coated. FR seat cover.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 4-Seater (repair)Degutting and fitment of 4 Seater Sofa with required fittings and secunng arrangements post necessary repairs and renewal of cuhions and upholistery. Mat: CRCA Powder coated. FR seat cover.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 70 | Sofa 5-Seater (repair)Degutting and fitment of 5 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cuhions and upholistery Mat. CRCA Powder coated, FR seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 5-Seater (repair)Degutting and fitment of 5 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cuhions and upholistery Mat. CRCA Powder coated, FR seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 71 | Sofa 6- Seater (repair)Degutting and fitment of 6 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cuhions and upholistery Mat: CRCA Powder coated. FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 6- Seater (repair)Degutting and fitment of 6 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cuhions and upholistery Mat: CRCA Powder coated. FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 72 | Sofa 7-Seater (repair)Degutting and fitment of 7 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated, FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs | Sofa 7-Seater (repair)Degutting and fitment of 7 seater Sofa with required fittings and securing arrangements post necessary repairs and renewal of cushions and upholstery. Mat: CRCA Powder coated, FR Seat coverAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. FR certificate, Load test certificate for every 1 seater of 100kgs |
| 73 | Bar counter (repair)Degutting of existing bar counter and fitment of existing bar counter made of FR material post necessary repairs. Design to be confirmed from SS. Bar counter should have new lockers below, drawers, glass / acrylic sheets cabinets, glass holders, glass hangers, 06 chairs etcAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test and locks to be cycle test certificate to be submitted | Bar counter (repair)Degutting of existing bar counter and fitment of existing bar counter made of FR material post necessary repairs. Design to be confirmed from SS. Bar counter should have new lockers below, drawers, glass / acrylic sheets cabinets, glass holders, glass hangers, 06 chairs etcAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test and locks to be cycle test certificate to be submitted |
| 74 | Chart table (repair)Degutting of existing table and fitment of existing CRCA power coated tables with stowage arrangement at bottom, post necessary repairs and powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test and locks to be cycle test certificate to be submitted | Chart table (repair)Degutting of existing table and fitment of existing CRCA power coated tables with stowage arrangement at bottom, post necessary repairs and powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers load test and locks to be cycle test certificate to be submitted |
| 75 | Kit Locker (repair)Degutting and fitment of existing kit locker and repair / renewal of door, handle lock post necessary CRCA Powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers/Shelfs load test of 50 kgs to be submitted | Kit Locker (repair)Degutting and fitment of existing kit locker and repair / renewal of door, handle lock post necessary CRCA Powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers/Shelfs load test of 50 kgs to be submitted |
| 76 | Routine locker (repair)Degutting and fitment of existing kit locker and repair / renewal of door, handle lock post necessary CRCA Powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers/Shelfs load test of 50 kgs to be submitted | Routine locker (repair)Degutting and fitment of existing kit locker and repair / renewal of door, handle lock post necessary CRCA Powder coatingAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Drawers/Shelfs load test of 50 kgs to be submitted |
| 77 | Teapoy (repair)Degutting of existing teapoy and fitment of teapoy with storage and locker at bottom post necessary repairsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Load test for storage channel to be submitted | Teapoy (repair)Degutting of existing teapoy and fitment of teapoy with storage and locker at bottom post necessary repairsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Load test for storage channel to be submitted |
| 78 | Book Shelf (Repair)Degutting, repair and fitment of existing CRCA powder coated book shelf with locking arrangement. Locking arrangement to be renewed along. Repair / replacement of sliding channels, acrylic sheets etcAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs to be submitted | Book Shelf (Repair)Degutting, repair and fitment of existing CRCA powder coated book shelf with locking arrangement. Locking arrangement to be renewed along. Repair / replacement of sliding channels, acrylic sheets etcAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Shelf load test of 50kgs to be submitted |
| 79 | Entertainment centre (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17.Certificate for locks to be submitted | Entertainment centre (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17.Certificate for locks to be submitted |
| 80 | Dining table (Repair)Degutting, repair, CRCA Powder coated/SS Polishing and fitment of existing item with locking arrangements and associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Dining table (Repair)Degutting, repair, CRCA Powder coated/SS Polishing and fitment of existing item with locking arrangements and associated fittings.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 81 | Dining Chair (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements and associated fittings. Renewal of cushions and upholstery.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Dining Chair (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements and associated fittings. Renewal of cushions and upholstery.As per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 82 | Working table for CO (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements, sliding channels and locks to be renewed if necessary and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Drawers/ Shelf load test of 20kgs to be submitted | Working table for CO (Repair)Degutting, repair, CRCA Powder coated and fitment of existing item with locking arrangements, sliding channels and locks to be renewed if necessary and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. Certificate for locks, Drawers/ Shelf load test of 20kgs to be submitted |
| 83 | Bridge CO Chair (Repair)Renewal of cushions and upholsteryAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | Bridge CO Chair (Repair)Renewal of cushions and upholsteryAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 84 | QM Chair (Repair)Renewal of cushions and upholsteryAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. | QM Chair (Repair)Renewal of cushions and upholsteryAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/Equipment dated 05 Apr 17. |
| 85 | Pistol cupboard/Safe locker (Repair)Degutting, repair and fitment of existing item with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17. Lock test certificate to be submitted | Pistol cupboard/Safe locker (Repair)Degutting, repair and fitment of existing item with locking arrangements and associated fittingsAs per Guideline specifications for Habitability upgradation Issue 2, 2013& NC/Policy/H-121/ Equipment dated 05 Apr 17. Lock test certificate to be submitted |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail