|
| 1 | Service of 2000 kVA Transformer:including OLTC, Oil filtration/de-hydration, Physical checkup, top up oil level, change of silica gel, cheching & rectify any leakage, megger test, Voltage Ratio Test, Oil Leakage check, BDV Test of Transforemr oil, Inspection of HV and LV porcelains and Metal parts. checking of bushing, tightening of connection, BDV testing, Spares, etc., OnSite quarterly Preventive Maintenance.Make - CG Power & Industrial Solution Pvt. Ltd. |
| 2 | Rate/ Unit for 1st Year |
| 3 | Rate/ Unit for 2nd Year |
| 4 | Rate/ Unit for 3rd Year |
| 5 | Service of 1600 kVA Transformer:including OLTC, Oil filtration/de-hydration, Physical checkup, top up oil level, change of silica gel, cheching & rectify any leakage, megger test, Voltage Ratio Test, Oil Leakage check, BDV Test of Transforemr oil, Inspection of HV and LV porcelains and Metal parts. checking of bushing, tightening of connection, BDV testing, Spares, etc., OnSite quarterly Preventive Maintenance.Make - CG Power & Industrial Solution Pvt. Ltd. |
| 6 | Rate/ Unit for 1st Year |
| 7 | Rate/ Unit for 2nd Year |
| 8 | Rate/ Unit for 3rd Year |
| 9 | Supply, Installation, Testing and Commissioing of Buchhloz relay |
| 10 | Supply, Installation, Testing and Commissioing of OTI & WTI |
| 11 | Supply, Installation, Testing and Commissioing of Conservator Float Switch |
| 12 | Supply, Installation, Testing and Commissioing of LT Bushing |
| 13 | Supply, Installation, Testing and Commissioing of HT Bushing |
| 14 | Providing & changing of Silica Gel |
| 15 | Rate/ Unit for 1st Year |
| 16 | Rate/ Unit for 2nd Year |
| 17 | Rate/ Unit for 3rd Year |
| 18 | Supply & Filling of Transformer Oil |
| 19 | Rate/ Unit for 1st Year |
| 20 | Rate/ Unit for 2nd Year |
| 21 | Rate/ Unit for 3rd Year |
| 22 | Service of 630A, 11kV VCB, HT Panels:including dusting & cleaning, inspect busbar & terminals for overheating, check control wiring, insulation resistance test (PHASE -PHASE & PHASE TO EARTH), inspect earth connection, space heater working condition, Physical checkup, tightening of connection, Spares, etc., OnSite quarterly Preventive Maintenance.Make - Schneider Electric |
| 23 | Rate/ Unit for 1st Year |
| 24 | Rate/ Unit for 2nd Year |
| 25 | Rate/ Unit for 3rd Year |
| 26 | Replacement of 630A, 11kV Copper BusBar terminals in main HT incomer. |
| 27 | Rate/ Unit for 1st Year |
| 28 | Rate/ Unit for 2nd Year |
| 29 | Rate/ Unit for 3rd Year Please Enable Macros to View BoQ information |