Indian Tenders

Tender Notice

TDR 55752554
Tendering Authority Department Of Telecommunications
Tender No GEM/2026/B/7453709
Tender ID GEM/2026/B/7453709
Tender Brief Corrigendum : Bids Are invited for Custom Bid For Services - Custom Bid For Services - Infra Shifting, Dismantling Installation In Kozhikode Ba - Dismantling Of Vrla/ Li-Ion Battery Sets Including Disconnecting Power Cables Along With All Accessories , Battery Cap
City Kozhikode
State Kerala
Document Fees Refer document
EMD INR 12934.0 /-
Tender Value INR 6.46 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Custom Bid For Services - Custom Bid For Services - Infra Shifting, Dismantling Installation In Kozhikode Ba - Dismantling Of Vrla/ Li-Ion Battery Sets Including Disconnecting Power Cables Along With All Accessories , Battery Capacity Up To 400Ah , Battery Capacity 600Ah , Battery Capacity 1000Ah , Battery Capacity 1500Ah , Battery Capacity 2000Ah , Battery Capacity 3000Ah , Transportation Of The Battery Set To Another Bsnl Site (Including Loading & Unloading) , Battery Capacity Up To Vrla 400Ah Or Li-Ion 600 Ah-Within 20Km Distance , Battery Capacity Vrla 600 Ah Or Li-Ion Above 600 Ah-Within 20Km Distance , Battery Capacity Up To 600 Ah Vrla Or Li-Ion Of Any Capacity- For Each Additional One Kilometer (Beyond 20 Km) , Installation Of Thevrla/ Li-Ion Battery Set, Connecting Hrc Fuses Testing And Commissioning Of The Above Battery Set On Artificial Load As Required , Battery Capacity Up To Vrla 400Ah Or Li-Ion 600Ah , Battery Capacity Vrla 600Ah Or Li-Ion Above 600 Ah , Battery Capacity Vrla 1000Ah , Battery Capacity Vrla 1500Ah , Battery Capacity Vrla 2000Ah , Battery Capacity Vrla 3000Ah , Additional Charges To Up / Down The Battery Set To Per Floor At Site. , Battery Capacity Up To Vrla 400Ah Or Li- Ion 600Ah , Battery Capacity 600 Ah Vrla , Li-Ion Battery Capacity Above 600Ah , Battery Capacity 1000Ah Vrla , Dismantling Of Smps Including Disconnecting Both I/P And O/P Power Cables Along With All Accessories , Smps Capacity Up To 450A , Smps Capacity Above 450A , Transportation Of The Smps To Another Bsnl Site, Loading Of The Same Smps To A Suitable Vehicle And Unloading As Per The Requirement , Smps Capacity Upto 450A-Within 20 Km Distance , Smps Capacity Above 450 A-Within 20 Km Distance , Smps Capacity Up To 450 A- For Each Additional One Kilometer(Beyond 20 Km) , Smps Capacity Above 450 A- For Each Additional One Kilometer(Beyond 20 Km) , Installation Of The Smps, Laying I/P Cables From L/T Panel To Smps, Installation Of Surge Protection Device Including Elcb With Mov, Connecting Battery And Dcdp Cables, Pe &Positive Earth Cables. Socket Crimping On I/P, O/P & Earth Cables, Testing, Acceptance Testing (A/T) And Commissioning Of The Above Smps On Available Exchange Load As Required. , Smps Pp Capacity Up To 450 A , Smps Capacity Above 450A , Additional Charges To Up / Down The Power Plant To Per Floor At Site. , Smps Pp Capacity Up To 450 A , Smps Capacity Above 450A , Installation Of Runway , Installation Of Runway (Without Material) Per Meter. Runway Material Will Be Supplied By Bsnl.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 15-06-2026 22-06-2026

Key Dates

Publish Date 15-06-2026
Last Date of Bid Submission 22-06-2026
Tender Opening Date 22-06-2026

Contact Information

Company Name Department Of Telecommunications
Address 673002,O/o General Manager , BSNL Kozhikode

BOQ Items

Sl. No. Item TitleItem Description
1Dismantling of VRLA/ Li-ion battery sets including disconnecting power cables along with all accessoriesDismantling of VRLA/ Li-ion battery sets including disconnecting power cables along with all accessories
2Battery capacity up to 400AHBattery capacity up to 400AH
3Battery capacity 600AHBattery capacity 600AH
4Battery capacity 1000AHBattery capacity 1000AH
5Battery capacity 1500AHBattery capacity 1500AH
6Battery capacity 2000AHBattery capacity 2000AH
7Battery capacity 3000AHBattery capacity 3000AH
8Transportation of the Battery set to another BSNL site (including loading & unloading)Transportation of the Battery set to another BSNL site (including loading & unloading)
9Battery capacity up to VRLA 400AH or Li-ion 600 AH-within 20km distanceBattery capacity up to VRLA 400AH or Li-ion 600 AH-within 20km distance
10Battery capacity VRLA 600 AH or Li-ion above 600 AH-within 20km distanceBattery capacity VRLA 600 AH or Li-ion above 600 AH-within 20km distance
11Battery capacity up to 600 AH VRLA or Li-ion of any capacity- for each additional one kilometer (beyond 20 km)Battery capacity up to 600 AH VRLA or Li-ion of any capacity- for each additional one kilometer (beyond 20 km)
12Installation of theVRLA/ Li-ion Battery set, Connecting HRC fuses Testing and Commissioning of the above battery set on artificial load as requiredInstallation of theVRLA/ Li-ion Battery set, Connecting HRC fuses Testing and Commissioning of the above battery set on artificial load as required
13Battery capacity up to VRLA 400AH or Li-ion 600AHBattery capacity up to VRLA 400AH or Li-ion 600AH
14Battery capacity VRLA 600AH or Li-ion above 600 AHBattery capacity VRLA 600AH or Li-ion above 600 AH
15Battery capacity VRLA 1000AHBattery capacity VRLA 1000AH
16Battery capacity VRLA 1500AHBattery capacity VRLA 1500AH
17Battery capacity VRLA 2000AHBattery capacity VRLA 2000AH
18Battery capacity VRLA 3000AHBattery capacity VRLA 3000AH
19Additional charges to up / down the Battery set to per floor at site.Additional charges to up / down the Battery set to per floor at site.
20Battery capacity up to VRLA 400AH or Li- ion 600AHBattery capacity up to VRLA 400AH or Li- ion 600AH
21Battery capacity 600 AH VRLABattery capacity 600 AH VRLA
22Li-ion Battery capacity above 600AHLi-ion Battery capacity above 600AH
23Battery capacity 1000AH VRLABattery capacity 1000AH VRLA
24Dismantling of SMPS including disconnecting both I/P and O/P Power cables along with all accessoriesDismantling of SMPS including disconnecting both I/P and O/P Power cables along with all accessories
25SMPS capacity up to 450ASMPS capacity up to 450A
26SMPS capacity above 450ASMPS capacity above 450A
27Transportation of the SMPS to another BSNL site, Loading of the same SMPS to a suitable vehicle and unloading as per the requirementTransportation of the SMPS to another BSNL site, Loading of the same SMPS to a suitable vehicle and unloading as per the requirement
28SMPS capacity upto 450A-within 20 km distanceSMPS capacity upto 450A-within 20 km distance
29SMPS capacity above 450 A-within 20 km distanceSMPS capacity above 450 A-within 20 km distance
30SMPS capacity up to 450 A- for each additional one kilometer(beyond 20 km)SMPS capacity up to 450 A- for each additional one kilometer(beyond 20 km)
31SMPS capacity above 450 A- for each additional one kilometer(beyond 20 km)SMPS capacity above 450 A- for each additional one kilometer(beyond 20 km)
32Installation of the SMPS, Laying I/P cables from L/T panel to SMPS, installation of Surge protection device including ELCB with MOV, Connecting Battery and DCDP cables, PE &Positive earth cables. Socket crimping on i/p, o/p & earth cables, Testing, Acceptance testing (A/T) and Commissioning of the above SMPS on available exchange load as required.Installation of the SMPS, Laying I/P cables from L/T panel to SMPS, installation of Surge protection device including ELCB with MOV, Connecting Battery and DCDP cables, PE &Positive earth cables. Socket crimping on i/p, o/p & earth cables, Testing, Acceptance testing (A/T) and Commissioning of the above SMPS on available exchange load as required.
33SMPS PP Capacity up to 450 ASMPS PP Capacity up to 450 A
34SMPS capacity above 450ASMPS capacity above 450A
35Additional charges to up / down the Power plant to per floor at site.Additional charges to up / down the Power plant to per floor at site.
36SMPS PP Capacity up to 450 ASMPS PP Capacity up to 450 A
37SMPS capacity above 450ASMPS capacity above 450A
38Installation of RunwayInstallation of Runway
39Installation of Runway (without material) per meter. Runway material will be supplied by bsnl.Installation of Runway (without material) per meter. Runway material will be supplied by bsnl.

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download atcim_03e8bb85-b248-44e3-853a1776507150551_sdemmclt.pdf Tender Documents 0 KB
Download SCPLM_5cd2dee1-a569-409c-9fe81776507135365_sdemmclt.pdf Tender Documents 0 KB
Download SLALM_85120873-1e2a-4234-9b7e1776507190333_sdemmclt.pdf Tender Documents 0 KB
Download world-bank-stc_1704778647.pdf Tender Documents 0 KB
Download cebcf975-8582-4097-8cc4-65645dffdfff.pdf Tender Documents 0 KB
Download 1776503209.pdf Tender Documents 0 KB
Download 1776503215.pdf Tender Documents 0 KB
Download 1776503222.pdf Tender Documents 0 KB
Download 1776503245.pdf Tender Documents 0 KB
Download 1776503250.pdf Tender Documents 0 KB
Download 1776503257.pdf Tender Documents 0 KB
Download 1776503270.pdf Tender Documents 0 KB
Download 1776503350.xlsx Tender Documents 0 KB
Download 1776503410.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.