Name of Work:- Repair/Replacement and day to day mainteance of Internal Electrification alongwith certain allied works at Zone 1 , 1A and 2A, 2B SAA under GE (S) Tezpur | Sl. No. | Item Description | |
| 1 | Taking down copper/aluminium point wiring (light, fan, socket or power) complete, including fixture and fittings such as switches, ceiling roses, pendants, regulators, sockets, light fitting etc. including cutting chases of exsisting wall for wall taking out concealed conduit ec. and making good disturbed surfaces of walls, floors, etc as per existing specification after providing point wiring under respective items here-in-below complete all as specified and as directed. | | 2 | Taking down carefully by unscrewing from boards/ outlet boxes, fittings and fixtures such as switches, sockets, ceiling roses, lamp holders, brackets, ceiling fittings, bulk head fittings, tube light fittings and regulators etc for reuse at site (Note : To be measured only when found serviceable in all respects complete for reuse) Please Enable Macros to View BoQ information | | 3 | Taking down carefully by unscrewing from boards/ outlet boxes, fittings and fixtures such as switches, sockets, ceiling roses, lamp holders, brackets, ceiling fittings, bulk head fittings, tube light fittings and regulators etc for reuse at site (Note : To be measured only when found serviceable in all respects complete for reuse) Please Enable Macros to View BoQ information |
|