TDR 55737473
Tendering Authority Military Engineer Services
Tender No 800226
Tender ID 2026_MES_764803_2
Tender Brief Corrigendum : Tender For Comprehensive Consultancy Services For Preparation Of Arch & Structural Drgs, Mechanical Electrical Plumbing Services, Estimate And Rate Analysis Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering The Project Wi
City Srinagar
State Jammu And Kashmir
Document Fees INR 500 /-
EMD INR 56520.0 /-
Tender Value INR 28.26 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Comprehensive Consultancy Services For Preparation Of Arch & Structural Drgs, Mechanical Electrical Plumbing Services, Estimate And Rate Analysis Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering The Project With Griha Agency 3 Star Rating Green Bldg Norms For Defi Md Accn At Bb Cantt Under Ge 864 Ews (Reload)

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 11-06-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 18-06-2026
2 06-06-2026 Amendment Others Other 11-06-2026
3 06-06-2026 Amendment Others Other 18-06-2026

Key Dates

Publish Date 11-06-2026
Last Date of Bid Submission 18-06-2026
Tender Opening Date 20-06-2026

Contact Information

Company Name Military Engineer Services
Contact Person CE 31 Srinagar Zone
Address HQ CE 31 Srinagar Zone

BOQ Items

Name of Work:- COMPREHENSIVE CONSULTANCY SERVICES FOR PREPARATION OF ARCH & STRUCTURAL DRGS, MECHANICAL ELECTRICAL PLUMBING SERVICES, ESTIMATE AND RATE ANALYSIS ETC INCLUDING OBTAINING APPROVAL OF DRAWINGS FROM GRIHA AGENCY AND REGISTERING THE PROJECT WITH GRIHA AGENCY 3 STAR RATING GREEN BLDG NORMS FOR DEFI MD ACCN AT BB CANTT UNDER GE 864 EWS (Reload)
Sl. No. Item Description
1Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.40) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed. (a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,(E-2(Plg Sec), user unit & GE and will have to be approved by Accepting officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:- (i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating. Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted. (iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer & as per CEFEES recommendation before finalization of the drawings . (iv) Pre vetting by CEFEES will be carried out by the consultant before finalization of drawings.
2(b) Preparation, submission and finalization of Complete structural design and drawings for following buildings based on the architectural drawings prepared and approved vide Item No 1 above, While preparing drawings the consultant shall adhere to design parameters given in Tender documents, scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws and BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings., All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Design section officers of HQ CE 31 Zone (E-2 Design Section ) and will have to approved by Accepting Officer before Finalization.SBC report shall be provided by E-2(Des) Sec to consultant for preparation of Str drgs.Note:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings.
3(c) Prepration, submission and finalization of, Complete Mechanical, Electrical and B/R sevices drawings ( based on the architectural drawings prepared and approved vide Item No 1 above) (Site plan, Plans of all the buildings, multiple floor plans with details showing internal electric supply, external electric supply, external water supply , lighting plan and fixing site for panels and Hot Water supply, Area drainage plan, Road, Path/Culvert, Sewage Disposal Plan Sewage pipe line is to be connected with Septic Tanks/Soakage pits , (in appropriate scales) in REVIT/AutoCad for Following Buildings. While preparing drawings the consultant ahall adhere to scales of Accomodation , Scales of Furniture for built in furniture , Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , ECBC norms, Local Bye laws and BPs and AE-II of the subject work. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 Section ) and will have to approved by Accepting Officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. Please Enable Macros to View BoQ information
4(c) Prepration, submission and finalization of, Complete Mechanical, Electrical and B/R sevices drawings ( based on the architectural drawings prepared and approved vide Item No 1 above) (Site plan, Plans of all the buildings, multiple floor plans with details showing internal electric supply, external electric supply, external water supply , lighting plan and fixing site for panels and Hot Water supply, Area drainage plan, Road, Path/Culvert, Sewage Disposal Plan Sewage pipe line is to be connected with Septic Tanks/Soakage pits , (in appropriate scales) in REVIT/AutoCad for Following Buildings. While preparing drawings the consultant ahall adhere to scales of Accomodation , Scales of Furniture for built in furniture , Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , ECBC norms, Local Bye laws and BPs and AE-II of the subject work. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 Section ) and will have to approved by Accepting Officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. Please Enable Macros to View BoQ information

Other Detail

Information Source https://defproc.gov.in/nicgep/app
Download FileName File Description File Size
Download 7a49e975-fdea-492f-97c2-507f8deadaab.html Tender Documents 0 KB
Download BOQ_860759.xls Tender Documents 0 KB
Download Tendermerged2.pdf Tender Documents 0 KB
Download Tendernotice_1 (2).pdf Tender Documents 0 KB