Tender Brief Corrigendum : Tender For Under The Electricity Secondary Works Division, Gorakhpur Under The Construction Work Of 33 Kv Line Vikasnagar From 132/33 Kv S/S Fci New To 33/11 Kv Vikasnagar & Construction Of One Circuit 33 Kv Line Big Bazar Mohaddipur Chauk From Surya
City Gorakhpur
State Uttar Pradesh
Document Fees INR 3540 /-
EMD INR 42000.0 /-
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Under The Electricity Secondary Works Division, Gorakhpur Under The Construction Work Of 33 Kv Line Vikasnagar From 132/33 Kv S/S Fci New To 33/11 Kv Vikasnagar & Construction Of One Circuit 33 Kv Line Big Bazar Mohaddipur Chauk From Surya Hotel To Redisson Blu Hotel Mohaddipur Chauk Distt. Gorakhpur Under The Business Plan Year 2026-27 On The Basis Of Semi Turnkey.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 10-06-2026 Date extension of ET No. 11/EWC(G)/2026-27 Date 15-06-2026

Key Dates

Publish Date 10-06-2026
Last Date of Bid Submission 15-06-2026
Tender Opening Date 16-06-2026

Contact Information

Company Name Purvanchal Vidyut Vitaran Nigam Limited
Contact Person Superintending Engineer
Address Electricity Works Circle Mohaddipur Gorakhpur

BOQ Items

Name of Work:- Under the Electricity Secondary Works Division, Gorakhpur under the Construction work of 33 KV Line Vikasnagar from 132/33 KV S/S FCI New to 33/11 KV Vikasnagar & Construction of one circuit 33 KV line Big Bazar Mohaddipur chauk from Surya Hotel to Redisson blu Hotel Mohaddipur chauk Distt. Gorakhpur under the business plan Year 2026-27 on the Basis of Semi Turnkey.
Sl. No. Item Description
1Part-A (Material Provided by Contractor) Vikasnagar
233 KV Feeder Pillar Box
333 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
433 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
5M S Dropper Angle
6M S Holding Clamp for STP Support
7Nut Bolt and washer all sizes
8Number Plate with clamp and Nut & Bolt
9Danger Board with clamp and Nut & Bolt
10Barbed Wire
11Red Oxide Paint
12Aluminium Paint
13Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire)
14GI Pipe 6\\" Dia
15HDPE Pipe 160 mm
1633 KV Polymer Disc Insulator
1733 KV Disc Fitting
18PG CLAMP For Dog
1933 KV Stay Set Complete
20Armoured copper control cable 2 x 2.5 mm2
21Armoured copper control cable 4 x 2.5 mm2
22PART – B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site.
23ST Pole 11 m
24ST Pole 9 m
2533 KV 3x300 XLPE Cable
2633 KV Line Isolator
2733 KV Line Isolator structure
2833 KV CT 400/200/1A
2933 KV CT Structure
3033 KV LA
3133 KV LA Structure
3233 KV VCB with structure
3333 KV Control pannel for single feeder
3433 KV Top Channel
35ACSR Dog conductor
36Laying of 33 KV 3x300 mm² ‘XLPE’ cable in cable trench. As per site requirement
37Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR laying along with cast of digging, bricks & sand. As per site requirement
38Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathed With HDPE Pipe/CI Pipe For Railway Crossing. As per site requirement
39Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor
40Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Straight Through
41Looping and rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work.
42Road Restoration Charges (Pakka Road) during cable laying and road cutting.
43Making plinth for installation of feeder pillar box
44Installation of 33 KV Feeder Pillar Box with complete wiring and earthing complete work
45Special pipe earthing with material for cable and kit protection
46Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting, Earthing Complete Work
47Erection of Double pole structure on 11 mtr ST Pole for one side OH Line one side Cable rising with fitting of all accessories, Painting, Earthing Complete Work
48Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms)
49Erection and grouting of Line Isolator Structure and install Line Isolator and earthing, Painting complete work.
50Erection and grouting of CT Structure and installation of 33 KV CT, wiring and earthing,Painting complete work.
51Erection and grouting of LA Structure and installation of 33 KV LA and earthing, Painting complete work.
52Erection and grouting of VCB Structure and installation of 33 KV VCB, wiring and earthing complete work.
53Installation of 33 KV CR Pannel, wiring and earthing complete work.
54Laying from switchyard to control room for 33 KV panel, CT, VCB by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand.
552 x 2.5 mm2
564 x 2.5 mm2
57Grouting of stay rods including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40 mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
58Part-A (Material Provided by Contractor) Surya Hotel
5933 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
6033 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
61M S Dropper Angle
62M S Holding Clamp for STP Support
63Nut Bolt and washer all sizes
64Number Plate with clamp and Nut & Bolt
65Danger Board with clamp and Nut & Bolt
66Barbed Wire
67Red Oxide Paint
68Aluminium Paint
69Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire)
70GI Pipe 6\\" Dia
71PART – B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site.
72ST Pole 9 m
7333 KV 3x300 XLPE Cable
7433 KV Top Channel
75ACSR Dog conductor
76Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR Laying along with cast of digging,bricks & sand. As per site requirement
77Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor
78Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Straight Through
79Looping and Rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work.
80Road Restoration Charges (Pakka Road) during cable laying and road cutting.
81Special pipe earthing with material for cable and kit protection
82Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting, Earthing Complete Work
83Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms) Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 11tenderform.rar Tender Documents 0 KB
Download ad517bef-67a3-4e68-bff0-393b53f09cba.html Tender Documents 0 KB
Download BOQ_2163458.xls Tender Documents 0 KB
Download Tendernotice_1 (18).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.