Tendering Authority Madhyanchal Vidut Vitran Nigam Limited
Tender No 07/SE(T)/GNZ/2026-27
Tender ID 2026_MVVNL_1154422_1
Tender Brief Corrigendum : Tender For Installation Of Additional Of Distribution Transformers And Line Related Work At Omega Sub-Station In The Area Of Ee, 11 Kv & Lt Indira Nagar Against Business Plan 2026-27.
City Lucknow
State Uttar Pradesh
Document Fees INR 3540 /-
EMD INR 32500.0 /-
Tender Value INR 32.42 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Installation Of Additional Of Distribution Transformers And Line Related Work At Omega Sub-Station In The Area Of Ee, 11 Kv & Lt Indira Nagar Against Business Plan 2026-27.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 18-06-2026 Corrigendum Date 20-06-2026
2 15-06-2026 Date Date 18-06-2026
3 15-06-2026 Date Date 18-06-2026
4 09-06-2026 Date Corrigendum Date 15-06-2026
5 09-06-2026 Date Corrigendum Date 15-06-2026
6 09-06-2026 Date Corrigendum Date 15-06-2026
7 05-06-2026 Date Extension Date 09-06-2026
8 05-06-2026 Date Extension Date 09-06-2026
9 05-06-2026 Date Extension Date 09-06-2026
10 05-06-2026 Date Extension Date 09-06-2026

Key Dates

Publish Date 18-06-2026
Last Date of Bid Submission 20-06-2026
Tender Opening Date 20-06-2026

Contact Information

Company Name Madhyanchal Vidut Vitran Nigam Limited
Contact Person S.E., TECHNICAL, LUCKNOW
Address 33/11 kV S/S HAL POWER HOUSE LUCKNOW

BOQ Items

Name of Work:- Installation of additional of distribution transformers and line related work at Omega Sub-station in the area of EE, 11 KV & LT Indira nagar against Business Plan 2026-27.
Sl. No. Item Description
1(PART-A) Carriage, loading-unloading with proper stacking of following material from Central Store /department store to JE Dump Store (distance approx 20 Km).
2Distribution Transformer 250 KVA
3LT XLPE Cable (1x240/400/630) Sqmm.
43 Phase DP Box
5PCC POLE 8.5 Mtr. Long
6ABC (3x120+1x95+1x16) Sqmm.
7ACSR RABBIT CONDUCTOR
8Laying of XLPE Cable (1x240/400/630)/ (3.5x240/400/630) Sqmm.Sqmm cable with Material. (Only Cable shall be supplied by department)
9Demounting of 100 KVA Distribution transformer from existing plinth after opening of all connections and opening of wire mesh fencing & safe carriage upto Central store & safe unloading.
10Mounting of 250 KVA Transformer on plinth with making all connections & fixing all requisite items/equipments as per RESSPO,s specn and safe energizsation after connecting body & neutral of transformer to earth. only transformer shall be supplied by deptt.
11Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department)
12Sagging of ACSR weasel /Racoon conductor as per RESPO norms and in the directions of supervising Engineer including cradle type guarding] fixing/mounting of material clamps fitting etc,
13Providing and fixing of TPMO
14Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor )
15Providing and Fixing of M.S. channel
16Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator
17Providing and fixing DO fuse set
18Construction of Transformer plinth of size 2x2x1.5 meter with the help of first class brick and masonry in the ratio 1:4 cement & sand coare. Filling the structure completely as per norms with RCC top 1:1:2 cement, sand coarse and stone grith with MS Bar and MS channel for resting transformer wheel 2x(125x65x2000)mm and plaster. (All material shall be arranged by the contractor.)
19Construction of massonary type distribution piller box with first class brick ballast cement coarse sand, local sand, brick ballast and MS round bar of 10 mm. Dia including fixing of 3 Nos 500 Amp/650 Volt fuse unit with Copper Busbar etc. (All material shall be supplied by the contractor.)
20Fabrication, erection of wire mesh fencing 2.0 Mtr. Height on cement boundry/base of height 1.0 fits including grouting of fabrication MS Angle 50x50x6 mm. Painting of fencing and support with all material as per specification around 11/.4 KV Sub-Station (All material shall be supplied by the contractor.)
21Boring type earthing of 11/0.4 KV Substation by boring and lowering of 100 fit deep 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor) (Earthing value should be 1 ohm).
22Carriage, loading-unloading with proper stacking of old TF from Site to Central Store /department store/substation to distance approx 20 Km.
23Providing and fixing of copper L Pieces t for 250kva transformers with proper disconnection and reconnection.
24Providing and fixing AL Leg long barrel off size (LS)
25Providing & Fixing of Suspension clamps (Insulated) with bolts & nut.
26Providing & Fixing of dead emd clamps (Insulated) with bolts & nut.
27Providing & Fixing of I-Hook (Insulated) for above clamps with bolts & nut.
28Providing and fixing of stone pad
29Providing and fixing of danger board
30Grouting of ST/PCC pole
31Supply and fixing at different size nuts and bolts.
32Supply and fixing of 4core LT MCB with box
33Gravels (Pebbles stone/Rivers peebles/Crushed granite) inside 11/0.4 Sub-Station area B/W Plinth & Fencing.
34(PART-B) Carriage, loading-unloading with proper stacking of following material from Central Store /department store to JE Dump Store (distance approx 20 Km).
3511 KV 3x185 sq.mm XLPE cable
369/11 Mtr long ST pole
3711 KV cable box straight thru
3811 KV cable box O/D
3911 KV pin insulator with pin
4011 KV VCB FOR OG CTR 200/100/5.
41Fabrication, erection of cable exposure on 11 Meter long ST pole with fixing of necessary clamps, accessories required including supply and fixing of straight Ms 100x50mm Top channel (2240mm long) One no, dropper channel 100x50mm (2240mm long) 2 Nos, with arrangement of fixing 3 nos. pin insulator, along with 11 KV DO Fuse set as per RESPO spenc & direction of E/I. ST Pole shall be supplied by the deptt.
42Fixing of M.S. channel
43Earthing of poles as per RESPO norms . (All the materials supplied by contractor)
44Grouting of poles with help of cement sand & brick ballast.
45Painting of pole
46Laying of 11 KV 3x185 sq.mm XLPE cable by manual method
47Hoisting of cable with the help of GI pipe 4\\" dia each having length of 3 meter along with supply and fixing of MS brackets and GI pipe.
48Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator
49High presure testing of cable
50Providing and fixing of danger board
51Providing and fixing of cable route marker
52Providing and fixing of under ground warning tape
53Installation of 11KV I/C &O/C VCB as per norms.
54Chemical earthing of VCB.
55Complete testing of VCB.
56Disconnection and reconnection work.
57Note : If, due to any circumstances, the plinth construction work is not feasible, then the 250 KVA transformer shall be installed on a double pole arrangement as per requirement. The cost of this work shall also be equivalent to the cost of plinth construction. Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download BOQ_2162490.xls Tender Documents 0 KB
Download e966e45e-d127-49b6-8d30-a491467630bb.html Tender Documents 0 KB
Download Tenderform-07-2026-27.pdf Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.