Indian Tenders

Tender Notice

TDR 55702433
Tendering Authority Madhyanchal Vidut Vitran Nigam Limited
Tender No 25/EDC(H)/2026-27
Tender ID 2026_MVVNL_1154555_1
Tender Brief Corrigendum : Tender For Work For Increasing Capacity Transformers And Additional Distribution Transformers In The Area Of Electricity Distribution Division-Sandila Under Business Plan 2026-27
City Hardoi
State Uttar Pradesh
Document Fees INR 3540 /-
EMD INR 28440.0 /-
Tender Value INR 28.44 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Work For Increasing Capacity Transformers And Additional Distribution Transformers In The Area Of Electricity Distribution Division-Sandila Under Business Plan 2026-27

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 11-06-2026 Date Exte0025 Date 15-06-2026

Key Dates

Publish Date 11-06-2026
Last Date of Bid Submission 15-06-2026
Tender Opening Date 15-06-2026

Contact Information

Company Name Madhyanchal Vidut Vitran Nigam Limited
Contact Person Electricity Distribution Circle hardoi
Address Electricity Distribution Circle hardoi

BOQ Items

Name of Work:- Work for Increasing capacity transformers and Additional Distribution transformers in the area of Electricity Distribution Division-Sandila under Business Plan 2026-27
Sl. No. Item Description
1Supply and ererction of following Material
2LT Fuse set with SMC Box
3Peircing Clamp
4MS Nut Bolt with washer off size
5LT clamp with nut & bolt
6I Hook
7Suspension clamp
8Allumunium lugs OFF SIZES
9Distribution box clamp
1011 KV holding clamp
11Dead end clamp
12LT Shackle Insulator
13Nut Bolt for shackle insulator
14F clamp
15copper L piece
16PROVIDING AND FIXING 11 KV DO FUSE SET FOR DT
17Safe Loading carriage & unloading of following material from store centre to pit site/JE Dump store
18PCC pole 8.5 mtr long
19PCC pole 11 mtr long
2011 KV Pin Insulator with GI pin
2111 KV Disk Insulator with Fitting
22ACSR Conductor
23Earthing Complete
24Dropper Channel
25Stay Complete
26GI wire
27LT XLPE 1x400 sqmm
28LT XLPE 3.5x70 sqmm
29LT XLPE 1x240 sqmm
30ABC (3x50+1x70+1x16) sq mm
31ABC (3x95+1x70+1x16) sq mm
32ABC (3x120+1x95+1x16) sq mm
3311 KV X arm
34T-OFF channel
35Top Channel
36Substiation base angle
37PVC cable 16 sqmm
38100 KVA
3925 KVA
4063 KVA
41250 KVA
42Distribution box 3 phase
43Erection of above material that is carriage from store center to site
44Erection of Single PCC 8.5 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole)
45Erection of Single PCC 11 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole)
46Concreting of PCC 8.5/11 mtr single and double pole.
47Erection of PCC 8.5 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole)
48Erection of PCC 11 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole)
49Fixing of 11 KV Pin Insulator with GI pin
50Fixing of 11 KV Disk Insulator with Fitting
51Fixing of Dropper Channel
52Proper use of GI wire FOR EARTHING OF POLE AND TF STRUCTURE
53Fixing of 11 KV X arm
54Fixing of T-off channel
55Fixing of top channel
56Fixing of Substation base angle
57Grouting and Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories 15 required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor.
58Stay concreting
59Ordinary Earthing by 11 KV MS earth Rod 2500 mm per RESPO schedule.
60Stringing & Sagging ABC Cable (3x50+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
61Stringing & Sagging ABC Cable (3x95+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
62Stringing & Sagging ABC Cable (3x120+1x95+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
63SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 100 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE
64SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 63 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE
65SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 25 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE
66Stringing & Sagging of ACSR conductor on 11 KV line
67Safe Loading, Carriage, Unloading of 250 KVA & 100 KVA TF Receive Back Upto & Store. Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 250 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs)
68Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 100 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs)
69FIXING OF 3 PH DB WITH ALL CONNECTION AND CLAMP
70Mouting of 63 KVA on Newly constructed Double pole and its commissioning with all accessories. (All decentralized material will be provided by the contractor expect Transformer)
71Construction of T/F plinth of size 1.5x1.5x1.5 Cu. mtr on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor).
72Boring type earthing with 20 mtr deep or up to water level providing GI pipe 1.5'' dia (''B'' Class) and earthing must be joint in T/F body, netural & Fuse unit by GI Stripe of size 32×5 mm thick long attached with nut & bolts and GI pipe cap (All the material will be arranged by the contractor at his own cost.)
73Construction of T/F fencing of size 2.5x2.5x2 Cu. Mtr.
74Providing Chemical Earthling of Existing transformer with Pipe 3 Meter Long, 14/17mm Dia, Copper Clad Steel Earth Electrodes 250 Microns Copper Coating Thicknes Earth Pit Chamber. All Connection to be done by GI Strip With Proper Dressing and Nut Bolt. (All the material will be arranged by the contractor at his own cost.)
75Supply and Installation of Henley type tailess unit 500 amp WITH THREE TAIL LESS UNIT Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 5dfe4ec4-0197-4282-9207-5c8925ef149d.html Tender Documents 0 KB
Download BOQ_2162707.xls Tender Documents 0 KB
Download TD25.pdf Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.