| 1 | Supply and ererction of following Material |
| 2 | LT Fuse set with SMC Box |
| 3 | Peircing Clamp |
| 4 | MS Nut Bolt with washer off size |
| 5 | LT clamp with nut & bolt |
| 6 | I Hook |
| 7 | Suspension clamp |
| 8 | Allumunium lugs OFF SIZES |
| 9 | Distribution box clamp |
| 10 | 11 KV holding clamp |
| 11 | Dead end clamp |
| 12 | LT Shackle Insulator |
| 13 | Nut Bolt for shackle insulator |
| 14 | F clamp |
| 15 | copper L piece |
| 16 | PROVIDING AND FIXING 11 KV DO FUSE SET FOR DT |
| 17 | Safe Loading carriage & unloading of following material from store centre to pit site/JE Dump store |
| 18 | PCC pole 8.5 mtr long |
| 19 | PCC pole 11 mtr long |
| 20 | 11 KV Pin Insulator with GI pin |
| 21 | 11 KV Disk Insulator with Fitting |
| 22 | ACSR Conductor |
| 23 | Earthing Complete |
| 24 | Dropper Channel |
| 25 | Stay Complete |
| 26 | GI wire |
| 27 | LT XLPE 1x400 sqmm |
| 28 | LT XLPE 3.5x70 sqmm |
| 29 | LT XLPE 1x240 sqmm |
| 30 | ABC (3x50+1x70+1x16) sq mm |
| 31 | ABC (3x95+1x70+1x16) sq mm |
| 32 | ABC (3x120+1x95+1x16) sq mm |
| 33 | 11 KV X arm |
| 34 | T-OFF channel |
| 35 | Top Channel |
| 36 | Substiation base angle |
| 37 | PVC cable 16 sqmm |
| 38 | 100 KVA |
| 39 | 25 KVA |
| 40 | 63 KVA |
| 41 | 250 KVA |
| 42 | Distribution box 3 phase |
| 43 | Erection of above material that is carriage from store center to site |
| 44 | Erection of Single PCC 8.5 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 45 | Erection of Single PCC 11 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 46 | Concreting of PCC 8.5/11 mtr single and double pole. |
| 47 | Erection of PCC 8.5 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 48 | Erection of PCC 11 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 49 | Fixing of 11 KV Pin Insulator with GI pin |
| 50 | Fixing of 11 KV Disk Insulator with Fitting |
| 51 | Fixing of Dropper Channel |
| 52 | Proper use of GI wire FOR EARTHING OF POLE AND TF STRUCTURE |
| 53 | Fixing of 11 KV X arm |
| 54 | Fixing of T-off channel |
| 55 | Fixing of top channel |
| 56 | Fixing of Substation base angle |
| 57 | Grouting and Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories 15 required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 58 | Stay concreting |
| 59 | Ordinary Earthing by 11 KV MS earth Rod 2500 mm per RESPO schedule. |
| 60 | Stringing & Sagging ABC Cable (3x50+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor |
| 61 | Stringing & Sagging ABC Cable (3x95+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor |
| 62 | Stringing & Sagging ABC Cable (3x120+1x95+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor |
| 63 | SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 100 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE |
| 64 | SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 63 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE |
| 65 | SAFE LOADING ,CARRIAGE, UNLOADING,DISMENTALING OF RECEIVE BACK OF 25 KVA TF TO STORE OR OTHER SITE AS PER INSTRUCTION FROM WORK INCHARGE |
| 66 | Stringing & Sagging of ACSR conductor on 11 KV line |
| 67 | Safe Loading, Carriage, Unloading of 250 KVA & 100 KVA TF Receive Back Upto & Store. Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 250 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs) |
| 68 | Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 100 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs) |
| 69 | FIXING OF 3 PH DB WITH ALL CONNECTION AND CLAMP |
| 70 | Mouting of 63 KVA on Newly constructed Double pole and its commissioning with all accessories. (All decentralized material will be provided by the contractor expect Transformer) |
| 71 | Construction of T/F plinth of size 1.5x1.5x1.5 Cu. mtr on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor). |
| 72 | Boring type earthing with 20 mtr deep or up to water level providing GI pipe 1.5'' dia (''B'' Class) and earthing must be joint in T/F body, netural & Fuse unit by GI Stripe of size 32×5 mm thick long attached with nut & bolts and GI pipe cap (All the material will be arranged by the contractor at his own cost.) |
| 73 | Construction of T/F fencing of size 2.5x2.5x2 Cu. Mtr. |
| 74 | Providing Chemical Earthling of Existing transformer with Pipe 3 Meter Long, 14/17mm Dia, Copper Clad Steel Earth Electrodes 250 Microns Copper Coating Thicknes Earth Pit Chamber. All Connection to be done by GI Strip With Proper Dressing and Nut Bolt. (All the material will be arranged by the contractor at his own cost.) |
| 75 | Supply and Installation of Henley type tailess unit 500 amp WITH THREE TAIL LESS UNIT Please Enable Macros to View BoQ information |